• Title/Summary/Keyword: safety equipment

Search Result 2,906, Processing Time 0.034 seconds

Improvement of Seismic Safety of Nuclear Power Plants by Equipment Isolations (기기의 면진을 통한 원전의 내진안전성 향상)

  • 전영선;최인길
    • Proceedings of the Earthquake Engineering Society of Korea Conference
    • /
    • 2003.03a
    • /
    • pp.93-100
    • /
    • 2003
  • Seismic isolation systems can improve the seismic safety of nuclear power plants by decreasing seismic force transmitted to structures and equipment. This study evaluates the effectiveness of equipment seismic isolation systems by the comparison of core damage frequencies in non-isolated and isolated cases. It can be found that the seismic isolation systems increase seismic capacity of nuclear equipment and decrease core damage frequencies significantly. The effect of equipment isolation is more significant in the PGA range of 0.3g to 0.5g.

  • PDF

The Current Status and Improvement Scheme of Safety Management on the Heavy Construction Equipment Operation (건설 중기계 운영상의 안전관리 실태 및 개선방안 - 크레인, 지게차, 버킷굴삭기, 승강기, 펌프카를 중심으로 -)

  • Kang Chang-Hee;Shin Kab-Cheol;Kim Sang-Tae;Kim Young-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.397-400
    • /
    • 2002
  • The purpose of this study is to analyze current status and propose improvement scheme of safety management on the heavy construction equipment operation. The research method invloves interview and questionnaire survey for the analysis of practical use status of heavy construction equipment. The results of this study are as fallows: 1) The problem of safety management status on heavy construction equipment operation is surveyed not wearing safety helmet, not keeping work regulations, and not preparing the work before start. 2) Proposed improvement scheme of safety management on heavy construction equipment operation includes strengthening 5 minutes safety education before start, strengthening safety action against falling materials, and strengthening enough preparation before start.

  • PDF

Basic Study on Alarming System for Preventing Construction Equipment Safety Accident (건설 장비의 안전사고 예방을 위한 알람시스템 기초 연구)

  • Ryu, Han-Guk;Kang, Jin-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.57-58
    • /
    • 2018
  • The number of deaths in the korean construction industry is more than three times the OECD average. Although safety management system should be improved to prevent the safety accidents, it is difficult to improve due to domestic safety conditions. Especially, in order to prevent accidents at construction sites, there is an increasing tendency to monitor the movement of workers and equipment in real time by introducing a location positioning system. Therefore, this study proposes a system that can monitor the position of workers and heavy equipments in real - time, detect danger and transmit alarms so that workers can pay attention to safety and keep safety. The system is expected to reduce safety accidents by transmitting alarms to workers so that they can pay attention.

  • PDF

Basic research, according to the inspection of crane equipment (크레인 설비의 검사에 따른 기초연구)

  • An, Tae-Keon;Shim, Kyu-Hyung;Rie, Dong-Ho
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.169-175
    • /
    • 2012
  • Self-Inspection is being used in the workplace hazardous, dangerous machinery and equipment to build capacity for the voluntary safety risks due to use of machinery and prevention of industrial accidents that inspect facilities for safety issues, is to check. However, December 31, 2008 as part of Article 36 of the Occupational Safety and Health Act (safety inspection), the financial vanish as the self-test, Safety inspection program has been changed., In each individual workplace that creates its own standards and regulations to use the existing inspection system is in some cases. This study is located in the southeast industrial complex as a risk reducer manufacturer, machine-based target zones in S Corp owns most of the crane based on the results of the tests is to analyze the problem. Then check the results - to bring its measures and information you need to know for sure is to propose.

The Study on the Accidents analysis and preventive measures from a excavator (굴삭기로 인한 재해분석 및 예방대책에 관한 연구)

  • Lee, Yong-Soo;Gang, Yong-Tak;Kim, Jin-Su;Kim, Chang-Eun
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2010.11a
    • /
    • pp.283-297
    • /
    • 2010
  • This study carried out the investigation about the actual conditions of the management, disaster analysis and safety awareness on excavator in one of construction equipment and tried to make it's preventive measures. To achieve this, first of all, the accident of the internal Construction Industry process Investigation and Analysis, and then analyze an cause of accident based on it. Next, For the conditions of safety management conduct a survey to Investigation and Analysis and Propose preventive measures. The results of this study can be summarized as follows. 1st, Status of safety awareness and management of construction equipment tend to seek quickly and easily for the interests of sight. 2nd, Half the precincts of the equipment is causing major disaster. 3rd, The risk of excavator operation's indicators and drivers is so much potential. 4th, The preventive measures are needed for strengthening safety education, professional legal education, changes in safety awareness, the development of prevention system.

  • PDF

The Study on the Accidents analysis and preventive measures from a excavator (굴삭기로 인한 재해분석 및 예방대책에 관한 연구)

  • Lee, Yong-Soo;Gang, Yong-Tak;Kim, Jin-Su;Kim, Chang-Eun
    • Journal of the Korea Safety Management & Science
    • /
    • v.12 no.3
    • /
    • pp.81-91
    • /
    • 2010
  • This study carried out the investigation about the actual conditions of the management, disaster analysis and safety awareness on excavator in one of construction equipment and tried to make it's preventive measures. To achieve this, first of all, the accident of the internal Construction Industry process Investigation and Analysis, and then analyze an cause of accident based on it. Next, For the conditions of safety management conduct a survey to Investigation and Analysis and Propose preventive measures. The results of this study can be summarized as follows. 1st, Status of safety awareness and management of construction equipment tend to seek quickly and easily for the interests of sight. 2nd, Half the precincts of the equipment is causing major disaster. 3rd, The risk of excavator operation's indicators and drivers is so much potential. 4th, The preventive measures are needed for strengthening safety education, professional legal education, changes in safety awareness, the development of prevention system.

A Study on the Management Plan through Performance Maintenance Analysis of Explosion-proof Facilities (방폭설비 성능유지 실태분석을 통한 관리방안 연구)

  • Kwon, Yong Jun;Byeon, Junghwan
    • Journal of the Korean Society of Safety
    • /
    • v.35 no.2
    • /
    • pp.8-16
    • /
    • 2020
  • In Article 311 of the Regulation on Occupational Safety and Health Standards requires the use of Korean Industrial Standards Act in accordance with the Industrial Standardization Act. However, the classification, inspection, maintenance, design, selection, and installation of explosion hazard locations for explosion and explosion prevention and internalization of 'safety' in the performance maintenance phase of electrical machinery and equipment There is no technical and institutional management plan for remodeling and alteration. Analysis of actual conditions and problems related to the installation, use, and maintenance of explosion-proof equipment, comparative analysis of domestic and international technical standards and systems, technical, institutional and administrative systems and systems related to installation, use, and maintenance of explosion-proof equipment, technical personnel and qualifications, etc. It is to propose legislation, system improvement, and technical standard establishment related to the maintenance of explosion-proof facility performance through improvement of the necessity and feasibility study for establishment of the legal status of the management site and management plan. As technical measures, KS standard revision (draft), KOSHA guide (draft) and explosion-proof facility performance maintenance manual were presented. In addition, the institutional management plan proposed the revised rule on occupational safety and health standards, the revised rule on the restriction of employment of hazardous work, and the manpower training program related to the maintenance of explosion-proof facilities and the qualification plan. Enhance safety at the installation, use, and maintenance stage of explosion-proof structured electrical machinery. It is expected to be used to classify explosion hazards, select related equipment, and to update and standardize standards related to installation, use and maintenance.

Study on The development of Danger Indicator for Prevention of Construction Equipment Accidents - Based on construction equipment accidents of A company - (건설장비 사고예방을 위한 위험지수 개발에 관한 연구 - A사 건설장비 사고사례 중심으로 -)

  • Kim, Byungyong;Ho, Jongkwan
    • Journal of the Korea Institute of Construction Safety
    • /
    • v.4 no.1
    • /
    • pp.9-15
    • /
    • 2021
  • Recently, buildings have become larger, more complex, and various construction methods have been tried. As a result, the use of construction equipment continues to increase, as well as safety accidents. According to the Ministry of Employment and Labor's report on industrial accidents, the rate of deaths caused by construction equipment among construction accidents has been increasing steadily since 2009. In the safety field of other industries such as crime and traffic, research has been continuously conducted to develop quantitative indicators due to demands for development of evaluation indicators or risk index development. On the other hand, construction equipment has been studied to analyze disaster cases and come up with improvement measures, but there is no research related to risk index. Therefore, the research will develop a quantitative index that can determine the risk level of construction equipment in the field based on the accident case and verify the possibility of use in the field.

Influences of School Food Service Dietitians' Job Satisfaction and Perception of Barriers to HACCP Implementation on Food Sanitation/Safety Management Performance in Gyeongbuk Province (영양사의 직무만족도와 HACCP 시스템 적용 장애요인 인식정도가 위생.안전관리 수행에 미치는 영향 - 경북지역 학교급식소를 대상으로 -)

  • Lee, Gyeong-Eun;Lee, Hye-Sang
    • Journal of the Korean Dietetic Association
    • /
    • v.11 no.2
    • /
    • pp.179-189
    • /
    • 2005
  • The purpose of the study was to investigate the relationships between dietitian’s job satisfaction and perception of barriers to HACCP implementation and food safety/sanitation management performance in school food service. An e-mail survey was conducted to 144 dietitians in Gyeongbuk Province. A response rate was 57.6%(N=83) and data were analyzed using SPSS Windows(ver. 10.0). Dietitians were more satisfied with ‘supervision’ and 'co-workers' than 'pay' and 'promotion.' Dietitians perceived 'lack of teachers' support on student education' and ‘limited availability of facilities/equipment' as the biggest challenges in implementing a HACCP system. A total score of sanitation/safety management performance evaluated by school districts was 92 out of 100. By category, 'safety management' and 'personal hygiene' were rated the highest whereas 'facilities/equipment' and 'HACCP system' categories were rated the lowest. The food sanitation/safety management performance scores were not correlated to dietitian’s job satisfaction, but significantly correlated to dietitian’s perceptions of barriers to HACCP implementation. As dietitians perceived facilities/equipment-related barriers greater, the scores of 'facilities/equipment(p<.01),' 'production process(p<.05),' and 'total score(p<.01)' were significantly lower. The findings suggest that more investment on facilities/equipment are needed for food safety improvement and successful HACCP implementation in school food service. Proper facilities and equipment will make employees monitor CCPs and take corrective actions more easily.

  • PDF

Safety assessment of Generation III nuclear power plant buildings subjected to commercial aircraft crash Part II: Structural damage and vibrations

  • Qu, Y.G.;Wu, H.;Xu, Z.Y.;Liu, X.;Dong, Z.F.;Fang, Q.
    • Nuclear Engineering and Technology
    • /
    • v.52 no.2
    • /
    • pp.397-416
    • /
    • 2020
  • Investigations of the commercial aircraft impact effect on nuclear island infrastructures have been drawing extensive attention, and this paper aims to perform the safety assessment of Generation III nuclear power plant (NPP) buildings subjected to typical commercial aircrafts crash. At present Part II, based on the verified finite element (FE) models of aircrafts Airbus A320 and A380, as well as the NPP containment and auxiliary buildings in Part I of this paper, the whole collision process is reproduced numerically by adopting the coupled missile-target interaction approach with the finite element code LS-DYNA. The impact induced damage of NPP plant under four impact locations of containment (cylinder, air intake, conical roof and PCS water tank) and two impact locations of auxiliary buildings (exterior wall and roof of spent fuel pool room) are evaluated. Furthermore, by considering the inner structures in the containment and raft foundation of NPP, the structural vibration analyses are conducted under two impact locations (middle height of cylinder, main control room in the auxiliary buildings). It indicates that, within the discussed scenarios, NPP structures can withstand the impact of both two aircrafts, while the functionality of internal equipment on higher floors will be affected to some extent under impact induced vibrations, and A380 aircraft will cause more serious structural damage and vibrations than A320 aircraft. The present work can provide helpful references to assess the safety of the structures and inner equipment of NPP plant under commercial aircraft impact.