• Title/Summary/Keyword: risk process

Search Result 2,892, Processing Time 0.029 seconds

Typical Pseudo-accident Scenarios in the Petrochemical Process (석유화학 공정의 가상사고 시나리오 유형분석)

  • 윤동현;강미진;이영순;김창은
    • Journal of the Korean Society of Safety
    • /
    • v.18 no.3
    • /
    • pp.75-80
    • /
    • 2003
  • This paper presents a set of typical pseudo-accident scenarios related to major equipments in petrochemical plants, which would be useful for performing such quantitative risk analysis techniques as fault tree analysis, event tree analysis, etc. These typical scenarios address what the main hazard of each equipment might be and how the accident might develop from an "initiating event". The proposed set of accident scenarios consists of total thirteen (13) scenarios specific for five (5) major equipments like reactor, distillation column, etc., and has been determined and screened out of one hundred and twenty-five (125) potential accident scenarios that were generated by performing semi-quantitative risk analysis practically for twenty-five (25) petrochemical processes, considering advices from the operation experts. It is assumed that with simple consideration or incorporation of plant-specific conditions only, the proposed accident scenarios could be easily reorganized or adapted for the relevant process with less time and labor by the safety engineers concerned in the petrochemical industries.ndustries.

Development of a Quantified Risk Prediction Process for Workers in Construction Projects ConsideringSite Conditions and Accident Cases (현장조건과 사고사례를 반영한 건설사업 근로자의 정량화된 위험도 예측 프로세스 개발)

  • Jung, Changhoon;Jang, Jiyoung;Park, Sangwon;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.94-95
    • /
    • 2019
  • Recently, the importance of prevention has emerged for the management of construction safety accidents.. Accordingly, this study collects and quantifies various risk factors at the construction site to represent them as direct risks and to create a predictive process for prevention in advance. These risk figures can be used as comprehensive safety figures to reflect current site conditions and past accidentt cases. The prevention of industrial accidents is managed in advance through the development of applications thatt quantify and predict the risks of individuals working at construction sites. The purpose of the project is to reduce industrial accidents in the construction industry by supporting safety management of site managers and workers.

  • PDF

Security Exposure of RTP packet in VoIP

  • Lee, Dong-Geon;Choi, WoongChul
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.11 no.3
    • /
    • pp.59-63
    • /
    • 2019
  • VoIP technology is a technology for exchanging voice or video data through IP network. Various protocols are used for this technique, in particular, RTP(Real-time Transport Protocol) protocol is used to exchange voice data. In recent years, with the development of communication technology, there has been an increasing tendency of services such as "Kakao Voice Talk" to exchange voice and video data through IP network. Most of these services provide a service with security guarantee by a user authentication process and an encryption process. However, RTP protocol does not require encryption when transmitting data. Therefore, there is an exposition risk in the voice data using RTP protocol. We will present the risk of the situation where packets are sniffed in VoIP(Voice over IP) communication using RTP protocol. To this end, we configured a VoIP telephone network, applied our own sniffing tool, and analyzed the sniffed packets to show the risk that users' data could be exposed unprotected.

Multiclass Botnet Detection and Countermeasures Selection

  • Farhan Tariq;Shamim baig
    • International Journal of Computer Science & Network Security
    • /
    • v.24 no.5
    • /
    • pp.205-211
    • /
    • 2024
  • The increasing number of botnet attacks incorporating new evasion techniques making it infeasible to completely secure complex computer network system. The botnet infections are likely to be happen, the timely detection and response to these infections helps to stop attackers before any damage is done. The current practice in traditional IP networks require manual intervention to response to any detected malicious infection. This manual response process is more probable to delay and increase the risk of damage. To automate this manual process, this paper proposes to automatically select relevant countermeasures for detected botnet infection. The propose approach uses the concept of flow trace to detect botnet behavior patterns from current and historical network activity. The approach uses the multiclass machine learning based approach to detect and classify the botnet activity into IRC, HTTP, and P2P botnet. This classification helps to calculate the risk score of the detected botnet infection. The relevant countermeasures selected from available pool based on risk score of detected infection.

Evaluation of Best Value for Safety Facilities on Highway Using Risk-based VE Approach - A Case Study of Median Barrier - (위험도기반 가치공학적 기법을 적용한 고속도로 교통안전시설 최고가치평가 : 중앙분리대 적용사레를 중심으로)

  • Ji, Dong-Han;O, Young-Tae;Choi, Hyun-Ho;Kim, Sung-Hun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.143-154
    • /
    • 2008
  • Since the concerns for safety of highway traffic safety facilities inherent in various environmental risk is increased, systematic performance, cost, and effect analysis process is needed for this. In case of median barrier among various traffic safety facilities, quantitative risk assessment is inevitable because it has lots of direct/indirect risk factors. Thus, this study suggests an advanced VE(Value Engineering) approach incorporating quantitative risk analysis. For the applicability, suggested VE approach considering alternative 1(140cm) and 2(127cm) is applied to median barrier in fields. Also, major improvement objects are extracted from governing factors of cost and performance based on functional analysis. It is concluded that the proposed risk assessment methodology will provide rational and practical solutions for best value and the approach could effectively applied for various traffic safety facilities by slight modification of suggest process.

Optimal portfolio and VaR of KOSPI200 using One-factor model (원-팩터 모형을 이용한 KOSPI200지수 구성종목의 최적 포트폴리오 구성 및 VaR 측정)

  • Ko, Kwang Yee;Son, Young Sook
    • Journal of the Korean Data and Information Science Society
    • /
    • v.26 no.2
    • /
    • pp.323-334
    • /
    • 2015
  • he current VaR model based on the J.P. Morgan's RiskMetrics structurally can not reflect the future economic situation. In this study, we propose a One-factor model resulting from the Wiener stochastic process decomposed into a systematic risk factor and an idiosyncratic risk factor. Therefore, we are able to perform a preemptive risk management by means of reflecting the predicted common risk factors in the model. Stocks in the portfolio are satisfied with the independence to each other because the common factors are fixed by the predicted value. Therefore, we can easily determine the investment in each stock to minimize the variance of the portfolio. In addition, the portfolio VaR is decomposed into the sum of the individual VaR. So we can effectively implement the constitution of the portfolio to meet the target maximum losses.

A Study on the Risk Assessment and Improvement of Musculoskeletal Burden Works in the Semiconductor Manufacturer (반도체 제조회사의 근골격계부담작업 유해요인조사 실태와 개선방안)

  • Jeong, Yeyoung;Park, Jae Hee
    • Journal of the Korean Society of Safety
    • /
    • v.37 no.1
    • /
    • pp.49-54
    • /
    • 2022
  • In Korea, companies which have work-related musculoskeletal burden works should have conducted legal risk assessments every three years from 2004 onwards. However, due to problems with the legal definition of work-related musculoskeletal burden works, some companies may have been exempted from the risk assessment even though their workers still experience work-related musculoskeletal pain. For example, the manufacturing process used by a particular semiconductor manufacturing company involved a great deal of legal musculoskeletal bueden works. However, this company eliminated the musculoskeletal burden works by continuously introducing automated processes, and finally, in 2016, all work which was legally defined as musculoskeletal burden work were removed from the company's manufacturing process. Nevertheless, in a 2016 survey, 9.6% of the company's workers still complained of musculoskeletal pain, and in a 2019 survey this proportion actually increased to 15.7%. This incident demonstrates the limitations and problems of the current legal risk assessment of work-related musculoskeletal burden work. Therefore, this study proposes two improvements to solve these problems. Firstly, it is necessary to broaden the current legal definition of work-related musculoskeletal burden works. For example, vibration risk factors and push/pull tasks that are currently missing from the definition should be included. Secondly, it is proposed that a survey on musculoskeletal pain should be conducted for all workers, regardless of whether they are engaged in musculoskeletal burden works. The results of this study could be used to improve the legal risk assessment of work-related musculoskeletal burden works.

Development of Measurement and Evaluation Process for Risk-based Configuration Factors in Mixed Used Development in Urban Regeneration Projects (복합용도 도시재생사업에서의 리스크 기반 변화요인 측정 및 평가 프로세스 개발)

  • Son, Myung-Jin;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.6
    • /
    • pp.94-106
    • /
    • 2012
  • In recent years, the risks and uncertainties associated with mixed used development in urban regeneration projects which have actively been implemented at home and abroad have been on the rise due to the uncertainties of the initial business plan, difficulty of financing, increase in total cost and schedule delay. To cope with rapid social and economic changes and optimize benefits, a risk-based configuration management process that considers life cycle is required, along with accurate planning in the early stage of the business. In addition, it is necessary to prepare measures that can respond to the evaluation and measurement of the configuration factors in relation to the business process. However, the focus of previous studies on configuration management in the field of construction was mainly on humanities and the sociological aspects such as organization, leadership, ideology and similar concepts. There has been limited research on the process and measurement and evaluation methods for configuration factors required in decision-making on the risks and changes that can occur in the actual project implementation phase. Accordingly, in this study, we defined risk-based configuration factors and developed a process and MECA/3DAM/CII methodology to measure and evaluate these factors so as to carry out systematic configuration management of mixed used development in urban regeneration projects.

Development of a Risk Management Procedure Model for the Construction Project Using Construction Risk Management System (CRMS를 활용한 건설공사의 리스크관리 절차모형 개발)

  • Kim, Chang Hak;Kang, Leen Seok;Park, Hong Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.4D
    • /
    • pp.423-432
    • /
    • 2010
  • This study suggested CRMS (construction risk management system) which is a new risk analysis model after analyzing existing risk management process for to guarantee a successful performance at the construction planning and work phase. CRMS is risk management procedures in order that the contractor identify, analyze and administrate the risk during performing construction project. This model may give much help to quantify and be ready the right managing methods about identified risk by the contractor. Especially, the most important and difficult things of all risk management may be to identify risk in the project. This study make more focusing on the developing a procedure that can identify risk more easily in the construction project. The risk is divided into global risk and local risk of a project. Also, this study suggests methods which are using the RBS (risk breakdown structure) related with WBS. This result will be useful as basic materials for developing computerizing system for risk management.

Library Risk Management and Insurance (도서관 리스크관리와 보험)

  • Chung, Hye-Kyoung
    • Journal of Information Management
    • /
    • v.31 no.4
    • /
    • pp.1-12
    • /
    • 2000
  • The potential risks, involved with the management of a library, may cause a tremendous economic loss, so require a systematic management. The rist management process, consisting of risk identification, risk measurement selection of risk treatment methods, implementation, and monitoring and evaluation, suggests the use of insurance to deal with property risks, liability risks and personnel risks. For the systematic risk management of a library, risk manager should be appointed to be responsible for program development and insurance purchase. The limited coverage of library risks, provided by the school cooperative society, should be supplemented through development of insurance products. Further study is required to improve the library risk management and the application of insurance in a systematic and realistic way.

  • PDF