Term-Based Approach를 기초로한 자원제한프로젝트스케줄링 문제의 해결 (Solution of the Resource Constrained Project Scheduling Problem on the Foundation of a Term-Based Approach)

  • 김복선
    • 한국지능시스템학회논문지
    • /
    • 제24권2호
    • /
    • pp.218-224
    • /
    • 2014
  • The logic-based scheduling language RCPSV may be used to model resource-constrained project scheduling problems with variants for minimizing the project completion time. A diagram-based, nonredundant enumeration algorithm for the RCPSV-problem is proposed and the correctness of the algorithm is proved.

A New Approach for Resource Allocation in Project Scheduling with Variable-Duration Activities

  • Kim, Soo-Young;Leachman, Robert C.
    • 한국경영과학회지
    • /
    • 제19권3호
    • /
    • pp.139-149
    • /
    • 1994
  • In many project-oriented production systems, e. g., shipyards or large-scale steel products manufacturing, resource loading by an activity is flexible, and the activity duration is a function of resource allocation. For example, if one doubles the size of the crew assigned to perform an activity, it may be feasible to complete the activity in half the duration. Such flexibility has been modeled by Weglarz [13] and by Leachman, Dincerler, and Kim [7[ in extended formulations of the resource-constrained poject scheduling problem. This paper presents a new algorithmic approach to the problem that combines the ideas proposed by the aforementioned authors. The method we propose involves a two-step approach : (1) solve the resource-constrained scheduling problem using a heuristic, and (2) using this schedule as an initial feasible solution, find improved resource allocations by solving a linear programming model. We provide computational results indicating the superiority of this approach to previous methodology for the resource-constrained scheduling problem. Extensions to the model to admit overlap relationship of the activities also are presented.

  • PDF

A new approach for resource allocation in project scheduling with variable-duration activities

  • 김수영;제진권;이상우
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 1994년도 춘계공동학술대회논문집; 창원대학교; 08월 09일 Apr. 1994
    • /
    • pp.410-420
    • /
    • 1994
  • In many project-oriented production systems, e.g., shipyards or large-scale steel products manufacturing, resource loading by an activity is flexible, and the activity duration is a function of resource allocation. For example, if one doubles the size of the crew assigned to perform an activity, it may be feasible to complete the activity in half the duration. Such flexibility has been modeled by Weglarz [131 and by Leachman, Dincerler, and Kim [7] in extended formulations of the resource-constrained project scheduling problem. This paper presents a new algorithmic approach to the problem that combines the ideas proposed by the aforementioned authors. The method we propose involves a two-step approach: (1) solve the resource-constrained scheduling problem using a heuristic, and (2) using this schedule as an initial feasible solution, find improved resource allocations by solving a linear programming model. We provide computational results indicating the superiority of this approach to previous methodology for the resource-constrained scheduling problem. Extensions to the model to admit overlap relationships of the activities also are presented.

Hierarchical Resource Management Framework and Multi-hop Task Scheduling Decision for Resource-Constrained VEC Networks

  • Hu, Xi;Zhao, Yicheng;Huang, Yang;Zhu, Chen;Yao, Jun;Fang, Nana
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제16권11호
    • /
    • pp.3638-3657
    • /
    • 2022
  • In urban vehicular edge computing (VEC) environments, one edge server always serves many task requests in its coverage which results in the resource-constrained problem. To resolve the problem and improve system utilization, we first design a general hierarchical resource management framework based on typical VEC network structures. Following the framework, a specific interacting protocol is also designed for our decision algorithm. Secondly, a greedy bidding-based multi-hop task scheduling decision algorithm is proposed to realize effective task scheduling in resource-constrained VEC environments. In this algorithm, the goal of maximizing system utility is modeled as an optimization problem with the constraints of task deadlines and available computing resources. Then, an auction mechanism named greedy bidding is used to match task requests to edge servers in the case of multiple hops to maximize the system utility. Simulation results show that our proposal can maximize the number of tasks served in resource constrained VEC networks and improve the system utility.

확률적 자원제약 스케줄링 문제 해결을 위한 가변 이웃탐색 기반 동적 의사결정 (Dynamic Decisions using Variable Neighborhood Search for Stochastic Resource-Constrained Project Scheduling Problem)

  • 임동순
    • 대한산업공학회지
    • /
    • 제43권1호
    • /
    • pp.1-11
    • /
    • 2017
  • Stochastic resource-constrained project scheduling problem is an extension of resource-constrained project scheduling problem such that activity duration has stochastic nature. In real situation where activity duration is not known until the activity is finished, open-loop based static policies such as activity-based policy and priority-based policy will not well cope with duration variability. Then, a dynamic policy based on closed-loop decision making will be regarded as an alternative toward achievement of minimal makespan. In this study, a dynamic policy designed to select activities to start at each decision time point is illustrated. The performance of static and dynamic policies based on variable neighborhood search is evaluated under the discrete-event simulation environment. Experiments with J120 sets in PSPLIB and several probability distributions of activity duration show that the dynamic policy is superior to static policies. Even when the variability is high, the dynamic policy provides stable and good solutions.

APPLYING ELITIST GENETIC ALGORITHM TO RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM

  • Jin-Lee Kim;Ok-Kyue Kim
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.739-748
    • /
    • 2007
  • The objective of this research study is to develop the permutation-based genetic algorithm for solving the resource-constrained project scheduling problem in construction engineering by incorporating elitism into genetic algorithm. A key aspect of the algorithm was the development of the elitist roulette selection operator to preserve the best individual solution for the next generation so the improved solution can be obtained. Another notable characteristic is the application of the parallel schedule generation scheme to generate a feasible solution to the problem. Case studies with a standard test problem were presented to demonstrate the performance and accuracy of the algorithm. The computational results indicate that the proposed algorithm produces reasonably good solutions for the resource-constrained project scheduling problem.

  • PDF

자원제약을 고려하며 기간단축이 가능한 복수의 양식을 지닌 단일 프로젝트의 일정문제:자원 가용량이 시간에 따라 변하는 경우의 휴리스틱 기법 (Resource Constrained Project Scheduling Problem with Multiple Crashable Modes: A Heuristic Procedure for the Resource Availabilities Varying from Period to Period)

  • 안태호
    • 한국컴퓨터정보학회논문지
    • /
    • 제3권4호
    • /
    • pp.154-163
    • /
    • 1998
  • In this paper a heuristic procedure for a resource constrained project scheduling problem with multiple crashable modes is presented. A similar heuristic procedure by Ahn and Erengue was recently introduced, but the procedure assumes the resource capacities constant over the project life. The Procedure of this paper is able to deal with the resource capacities varying over the project life. The computational results with a set of 110 test problems demonstrate the efficacy of the heuristic procedure.

  • PDF

자원 제약이 있는 프로젝트 스케줄링을 위한 효율적인 유전알고리즘 (Efficient Genetic Algorithm for Resource Constrained Project Scheduling Problem)

  • 이상욱
    • 한국콘텐츠학회논문지
    • /
    • 제11권6호
    • /
    • pp.59-66
    • /
    • 2011
  • 자원 제약이 있는 프로젝트 스케줄링 문제는 자원의 양은 제한되어 있고 작업들 간에 선행조건이 있는 일정계획 문제로서 NP-hard 문제 중에 하나로 알려져 있다. 이러한 문제는 결정론적인 방법을 사용해서는 주어진 시간 내에 최적해를 구하기 어렵기 때문에 근사 최적해를 빠른 시간에 구할 수 있는 휴리스틱 방법을 이용한다. 본 논문에서는 자원 제약이 있는 프로젝트 스케줄링 문제를 효율적으로 해결할 수 있는 유전알고리즘을 소개한다. 제안한 유전알고리즘은 스키마 이론을 적용한 교차 연산자와 실세계 토너먼트 선택 전략을 이용하였다. 표준 문제에 실험한 결과는 제안한 알고리즘이 기존의 알고리즘 보다 우수함을 보여주었다.

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF

자원제약하의 복수 프로젝트 일정계획을 위한 휴리스틱 알고리즘 (A Heuristic Algorithm for Resource-Constrained Multi - Project Scheduling)

  • 공명달;김정자
    • 산업공학
    • /
    • 제13권1호
    • /
    • pp.110-119
    • /
    • 2000
  • Resource-constrained project scheduling is to allocate limited resources to activities to optimize certain objective functions and to determine a start time for each activity in the project such that precedence constraints and resource requirements are satisfied. This study suggests a multi-project scheduling model which can level work loads, make the most of production capacity and restrain the delay of delivery by developing a heuristic algorithm which minimizes the project completion time and maximizes the load rate under resource constraints.