• Title/Summary/Keyword: repetitive projects

Search Result 49, Processing Time 0.022 seconds

A Study on Effective Utilization of Historical Data of Software Companies (소프트웨어사업자 실적데이터 활용방안에 관한 연구)

  • Kim, Joong-Han
    • Journal of Information Technology Services
    • /
    • v.7 no.1
    • /
    • pp.103-116
    • /
    • 2008
  • Efficiency and objectiveness are the most critical issues in the evaluation of software projects. It is beneficial not only to software companies participated in bids, but to administrators of projects. This study attempts to find an improvement in the evaluation process by connecting the historical data of bidding companies in the software company report system with the governmental procurement system. The proposed means will eliminate unnecessary and repetitive submission step of bidding companies and provide the administrator with objective evaluation process. Also, this paper proposes an automated process for quantifying the business experience of bidding companies.

Crashing Method for Repetitive Project hybridizing concurrent engineering and LOB (동시공학 및 LOB를 사용한 반복 프로젝트 공기단축 방법론)

  • Min, Gyu-Tae;Lee, Hong-Chu;Li, Xian-Jun;Lee, Dong-Eun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.41-42
    • /
    • 2018
  • Various methods that crash the project completion time have been studied. Line-of-Balance (LOB) is well accepted as a useful method that enables steady resource utilization without frequent hire-and-fire of resources for a project having repetitive units. Existing studies involved in LOB-CPM focuses on thesis such as resource leveling and optimization in construction scheduling community. However, crashing methods are not arrived at a full maturity in LOB scheduling, because no one handles steady resource utilization while keeping activity-relationships. This paper proposes a method that crashes project completion time by hybridizing concurrent engineering and LOB scheduling without using additional resources.

  • PDF

BIM Application for Civil Engineering Project in Planning and Design Phases (토목공사 기획 및 설계단계의 BIM 적용방안 연구)

  • Kang, Leen-Seok;Kim, Seol-Gi;Kim, Hyeon-Seung;Moon, Hyoun-Seok
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.26-31
    • /
    • 2011
  • Due to the characteristics of 3D objects of building construction projects which have regular, vertical and repetitive shapes, the most practical utilization of BIM in the country is focused on building projects. The characteristics of 3D objects of civil engineering project have irregular, horizontal and non-repetitive shapes. Therefore, consisting of a practical BIM model is difficult comparing with building project. This study suggests an application process of BIM for the planning and design phases for civil engineering project. A BIM system is developed based on suggested BIM process and it is verified through a bridge construction project.

Resource-constrained Scheduling at Different Project Sizes

  • Lazari, Vasiliki;Chassiakos, Athanasios;Karatzas, Stylianos
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.196-203
    • /
    • 2022
  • The resource constrained scheduling problem (RCSP) constitutes one of the most challenging problems in Project Management, as it combines multiple parameters, contradicting objectives (project completion within certain deadlines, resource allocation within resource availability margins and with reduced fluctuations), strict constraints (precedence constraints between activities), while its complexity grows with the increase in the number of activities being executed. Due to the large solution space size, this work investigates the application of Genetic Algorithms to approximate the optimal resource alolocation and obtain optimal trade-offs between different project goals. This analysis uses the cost of exceeding the daily resource availability, the cost from the day-by-day resource movement in and out of the site and the cost for using resources day-by-day, to form the objective cost function. The model is applied in different case studies: 1 project consisting of 10 activities, 4 repetitive projects consisting of 40 activities in total and 16 repetitive projects consisting of 160 activities in total, in order to evaluate the effectiveness of the algorithm in different-size solution spaces and under alternative optimization criteria by examining the quality of the solution and the required computational time. The case studies 2 & 3 have been developed by building upon the recurrence of the unit/sub-project (10 activities), meaning that the initial problem is multiplied four and sixteen times respectively. The evaluation results indicate that the proposed model can efficiently provide reliable solutions with respect to the individual goals assigned in every case study regardless of the project scale.

  • PDF

Process Planning for Finishing Works of High-rise Residential Buildings Project (고층 공동주택 마감공사의 공정계획 프로세스)

  • Baek, Tae-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.110-117
    • /
    • 2017
  • In the construction of high-rise residential buildings in which the finishing works are done repetitively in each housing unit, the construction period and cost can be reduced, while maintaining the quality, if the work process is properly managed in order for the resources to be input continuously. Time management methods such as the Bar Chart, CPM and LOB are not appropriate, due to the difficulties involved in the diagraming of repetitive works and applying them to the project. The Tact method also has difficulties in maintaining a constant work flow and needs significant effort and cooperation from the subcontractors to allocate the resources consistently. Partitioning, base works for finishing, floor mortar plastering and the final finishing work are done sequentially in residential buildings projects, and there are many repetitive activities which differ in terms of the work method, work area and productivity. If these repetitive activities are synchronized or converged toward the last work area, the goal of process management can be achieved effectively. Therefore, a process planning method for the finishing works of residential building projects is proposed, which takes into consideration elements, such as the sequential relation between the activities in each housing unit and classification of repetitive works in terms of their management method, work area and production rate, for the continuous input of resources into the housing units.

Masonry work interference factor deduction based on daily report data analysis (작업일보 데이터를 활용한 조적공사 작업간섭 요소 도출)

  • Park, Min Ha;Lee, Hye Lin;Ko, Yong-Ho;Han, SeungWoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.172-173
    • /
    • 2015
  • Construction project involves numerous repetitive operations. Especially in high-rise and apartment houses projects, the amount of repetitive operations increase and a preceding operations delay causes serious damage to the total duration of the project. This study deducts work delay factors by site engineer interview and survey. The study analyzes daily report data to deduct crucial processes affecting masonry work which has been investigated to be one of preliminary processes conducted at the beginning of finish work.

  • PDF

Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects (공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스)

  • Koo, Kyo-Jin;Cho, Dong-Hyun;Lee, Jun-Ho;Park, Sang-Hun;Park, Chan-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.285-286
    • /
    • 2012
  • In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

  • PDF

Suggestions for Detection System of Bid-rigging in Public Construction Projects

  • Song, Sanghoon;Bang, Jong-Dae;Sohn, Jeong-Rak;Cho, Gun-Hee
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.712-713
    • /
    • 2015
  • In recent years, the bid-rigging in public construction markets has been treated as a critical issue in Fair Trade Commission. The investigation revealed that the collusion was implemented extensively in every area from the material supply to the construction service of general contractors. This study reviewed the causes of the bid-rigging in public construction projects, and proposed the improvement plan to eradicate bad practices. Firstly, the causes and purposes of bid-rigging were categorized into two types of internal factors from construction companies and external environment factors influencing business activities. Secondly, the system development method was explained to detect the signs of bid-rigging based on the technical proposal documents in open tender. The detection systems of repetitive public owner also provide the function of sharing data on the companies and cases to violate the fair trade regulation. In addition, the problems and improvement direction of public procurement policies were discussed.

  • PDF

A Stochastic Linear Scheduling Method using Monte Carlo Simulation

  • Soderlund, Chase;Park, Borinara
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.169-173
    • /
    • 2015
  • The linear scheduling method or line-of-balance (LOB) is a popular choice for projects that involve repetitive tasks during project execution. The method, however, produces deterministic schedule that does not convey a range of potential project outcomes under uncertainty. This results from the fact the basic scheduling parameters such as crew production rates are estimated to be deterministic based on single-point value inputs. The current linear scheduling technique, therefore, lacks the capability of reflecting the fluctuating nature of the project operation. In this paper the authors address the issue of how the variability of operation and production rates affects schedule outcomes and show a more realistic description of what might be a realistic picture of typical projects. The authors provide a solution by providing a more effective and comprehensive way of incorporating the crew performance variability using a Monte Carlo simulation technique. The simulation outcomes are discussed in terms of how this stochastic approach can overcome the shortcomings of the conventional linear scheduling technique and provide optimum schedule solutions.

  • PDF

Network Compression by Saying Idle Time of Resources and Spaces for Repetitive Activities (작업공간과 자원의 여유시간 최소화를 통한 반복작업 공정계획기법)

  • Yi Kyoo Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.1 no.3 s.3
    • /
    • pp.75-80
    • /
    • 2000
  • In scheduling multi-unit projects, several alternatives can exist in network construction due to repetitiveness of their activities. Project duration is affected not only by the duration of each activity but also by the arrangement of repeating activities in such projects. This paper provides a network compression method that assigns predecessors to each activity to minimize its float time. Different to the previous efforts that utilized line of balance as the base scheduling-model, this research adopts precedence diagram arranged in two coordinates, the space axis and the resource one. This method seeks the most appropriate predecessors for each activity in each direction of the two coordinates for the purpose of minimizing the idle resource and space. This activity arrangement method was applied to a multi-unit apartment-construction project, to prove its capability of network compression. The result shows that the method successfully sought room for saving construction duration by changing the activity arrangement. The network compression method presented in this research can be utilized in multi-unit construction projects such as apartment complex projects.

  • PDF