Process of Formwork Crew Team Formation Based on Work Zoning in Apartment Housing Projects

공구분할기반 공동주택 거푸집공사 작업조 구성 프로세스

  • 구교진 (서울시립대학교 건축공학과 대학원) ;
  • 조동현 (서울시립대학교 건축공학과 대학원) ;
  • 이준호 (서울시립대학교 건축공학과 대학원) ;
  • 박상헌 (서울시립대학교 건축공학과 대학원) ;
  • 박찬수 (삼성물산(주))
  • Published : 2012.11.16

Abstract

In the large scale projects, it is difficult to manage every blocks because of the apartment housing project have repetitive shapes and structures. Therefore, it is necessary to divide construction site into work zones and blocks considering site plan, the number of units per each floor, arrangement of blocks, etc. In this study, 20 influencing factors on the grouping of work zones and formwork crew team formation are identified through case study and literature review. Factors are analyzed to determine the degree of influence through experts interviews. A systematic process of crew formation based on work zoning and the considerations by each steps are presented.

Keywords