• Title/Summary/Keyword: repair system

Search Result 1,468, Processing Time 0.024 seconds

Smart Quote Comparison System for Repair and Maintenance Vehicles (자동차 수리 및 정비를 위한 스마트 견적 비교 시스템)

  • Young Bok Joo;Eun Bi Son;Tae San Kim;Soo Ah Kim
    • Journal of the Semiconductor & Display Technology
    • /
    • v.22 no.4
    • /
    • pp.99-102
    • /
    • 2023
  • In this paper, the system is proposed and implemented to share the part number, the part name, and the vehicle type through the improvement sharing bulletin board for automobile repair and maintenance. And when photos of damage parts are uploaded to the system, the system analyzes it using a deep learning model to analyze whether it is damaged and automatically classify the type of damage. By providing repair and maintenance quotes for a significant part, the system provides economically repaired by providing comparative adjustment information on repair costs to drivers who are particularly concerned about the market prices of parts and maintenance services. Through the existing bulletin board, you can exchange and share information about parts by sharing various information on repair and maintenance. This paper provides in detail the average market price per type of damage during automobile repair and maintenance, helping drivers who do not know the details of parts and maintenance services to receive reasonable quotes by providing price information.

  • PDF

Cost Analysis for Periodic Maintenance Policy with Minimal Repair (응급수리를 고려한 정기보전정책의 비용분석)

  • 김재중;김원중
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.34
    • /
    • pp.139-146
    • /
    • 1995
  • This study is concerned with cost analysis in periodic maintenance policy. Generally periodic maintenance policy in which item is repaired periodic interval times. And in the article minimal repair is considered. Minimal repair means that if a unit fails, unit is instantaneously restored to same hazard rate curve as before failure. In the paper periodic maintenance policy with minimal repair is as follows; Operating unit is periodically replaced in periodic maintenance time, if a failure occurs between minimal repair and periodic maintenance time, unit is replaced by a spate until the periodic time comes. Also unit undergoes minimal repair at failures in minimal-repair-for-failure interval. Then total expected cost per unit time is calculated according to maintenance period and scale parameter of failure distribution. Total cost factors ate included operating, fixed, minimal repair, periodic maintenance and replacement cost Numerical example is shown in which failure time of system has erlang distribution.

  • PDF

Periodic Replacement Policies with Minimal Repair Cost Limit

  • Yun, W.Y.;Bai, D.S.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.11 no.1
    • /
    • pp.3-10
    • /
    • 1985
  • Periodic replacement policies are proposed for a system whose repair cost, when it fails, can be estimated by inspection. The system is replaced when it reaches age T (Policy A), or when it fails for the first time after age T (Policy B). If it fails before reaching age T, the repair cost is estimated and minimal repair is then undertaken if the estimated cost is less than a predetermined limit L; otherwise, the system is replaced. The expected cost rate functions are obtained, their behaviors are examined, and ways of obtaining optimal T and L are explored.

  • PDF

A Corrective Maintenance Policy Which Determines Replacement or Repair for the Maintenance of System Failures

  • Jang, Jae-Jin;Lie, Chang-Hoon
    • Journal of the military operations research society of Korea
    • /
    • v.15 no.1
    • /
    • pp.54-62
    • /
    • 1989
  • This paper presents a corrective maintenance model to determine either type of maintenance actions upon failure of the system. Types of maintenance actions considered are minimal repair and replacement. Minimal repair cost is assumed to be random, whereas replacement cost is fixed. A policy, B(t), which determines the type of maintenance action based on the estimated minimal repair cost when the system fails at time t is adopted. To obtain an optimal policy, an expected maintenance cost per unit time is derived and is minimized with respect to B(t).

  • PDF

A Three-Echelon Inventory Model for Repairable Items with Capacity Constraint (수리용량의 제한이 있는 수리가능한 부품의 3단계 재고시스템에 관한 연구)

  • 김지승
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.43
    • /
    • pp.99-107
    • /
    • 1997
  • We consider a multiechelon repairable-item inventory system where several bases are supported by a central depot and the external repair facilities. Unlike METRIC- based models, there are only a finite number of repair channels at each base, central depot and the external repair facilities. It is desired to find repair capacities and spares level which together guarantee a specified service level at minimum cost. Closed queueing network theory is used to model the stochastic process. The purpose of this paper is to derive the steady-state distributions of this system.

  • PDF

Development of Repair System for Drain Pipe to Enhance Safety (하수관거 안전성 향상을 위한 보수 시스템 개발)

  • Chung, Jee-Seung;Kang, Weon-Dae
    • Journal of the Korean Society of Safety
    • /
    • v.26 no.6
    • /
    • pp.45-53
    • /
    • 2011
  • This study was performed to develop repair and reinforcing materials in sewage drain pipe by using 40% of CAC(Calcium Aluminate Cement) and 4% of Polymer Powder. Regarding reinforcing materials to enhance load-bearing capacity, polyester textile and wire mesh were adopted and then they were evaluated by the measurement of deflection and Stress-strain Relationship. Two types of drain pipe made by concrete and PE were considered as plain specimens and then loading test were performed after repaired by CAC mortar impregnated reinforcing materials. As the test results of the load-bearing test on both drain pipe, there was higher load-bearing capacity on the specimen adopted wire mesh but debonding of repair mortar was found due to stiffness of wire mesh. By the way, repair system using CAC mortar impregnated polyster textile without wire mesh showed satisfactory results including bonding and load-bearing capacity regardless substrate, so this repair system using by mixture of CAC mortar and polyster textile is suggested as the reasonable repairing method within this experimental scope.

Optimal System Burn-in for Maximizing Reliability of Non-series Systems (비 직렬 시스템의 신뢰도 최적화를 위한 시스템 번인)

  • Kim, Kyungmee O.
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.33 no.2
    • /
    • pp.273-281
    • /
    • 2007
  • The decision of how long performing system burn-in must be answered with a probabilistic model of a system lifetime at which infant mortality failures created during assembly processes are quantified. In this paper, we propose such a model which is modified from previous results. Using the system model, we derived system reliability in terms of component and system burn-in times for the two cases of minimal repair at system failure and of component replacement and connection repair at their failure times. The procedure is illustrated with a bridge system and the optimal system burn-in times are obtained for maximizing system reliability. The result suggests that an assumption of minimal repair at system failure may underestimate the optimal burn-in time in practice.

A Study on the Improvement of Aircraft Contract Maintenance System (항공장비 외주정비체계 개선방안 연구)

  • Suh Sung-chul;Park Seung-hwan
    • Journal of the military operations research society of Korea
    • /
    • v.30 no.2
    • /
    • pp.96-107
    • /
    • 2004
  • This paper deals with $\ulcorner$Requirement Decision Model for Repair Parts supplied by the Government$\lrcorner$ which is to reduce Aircraft Contract Maintenance Cost. It aims to find solutions to the fundamental problems of the Aircraft Contract Maintenance System. Under the current Aircraft Contract Maintenance System, it is hard to forecast the exact demand of repair parts, so support rate of Repair Parts supplied by the Government is restricted under 50 percent. It is inevitable to purchase Repair Parts from the firm with much higher price than those of Government source. However, absence of fixed demand pattern makes it difficult to improve accuracy of demand forecast. As a solution to these problems, this model prevents a cost increase due to the unit price difference between Repair Parts supplied by the Government and Repair Parts purchased by the Firm. It also reflects demand characteristics of each repair part, and prevents continual stock increase by setting an upper limit on the amount of Repair Parts supplied by the Government. The effectiveness of this model is verified by empirical analysis using the latest raw data. By applying this model to real situation, we expect to reduce about 4 billion won every year.

Case Study on Certification System of Parts Repair for Commercial Aircraft Engine (상용항공기 엔진부품 수리 인증체계에 관한 사례연구)

  • Chang-Tak Lee
    • Journal of Aerospace System Engineering
    • /
    • v.17 no.4
    • /
    • pp.95-103
    • /
    • 2023
  • Aircraft engine parts repair is a field belonging to the lowest level in the hierarchy of the aircraft industry, and it is marginalized in terms of research, compared to aircraft manufacturing or maintenance that belong to the upper level. On the other hand, in 2019, Korean Air's Powerplant Maintenance Center paid USD $130 million to foreign countries for engine parts repair, making it an industry with great need for localization. To achieve the goal of localizing engine parts repair, a certification system is needed that can perform independent repairs based on the development of repair technology, aligning contractual relationships with engine manufacturers, and free from dependence on engine manufacturers or foreign repair companies. The purpose of this study is to provide a basis for subsequent research to secure an actual certification system by suggesting the need for securing such a certification system.

THE DEVELOPMENT OF BUILDING MAINTENANCE SYSTEM FOR DETERMINING PRIORITIES OF PUBLIC FACILITY REPAIRS & REPLACEMENT (I)

  • Chun-Kyong Lee;Tae-Gab Jung;Byong-Jin Yu;Tae-Keun Park
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.376-381
    • /
    • 2011
  • In Korea Water Resources Corporation (K-Water) has seen four problems rising in four aspects of property management of approximately 1,300 buildings scattered through put to country. To solve these, ground data for repair and replacement works to be conducted for prevention will be prepared and building maintenance system (hereinafter referred to as PBMS) intended to record related repair and replacement work histories and calculate LCC of the related these items will be developed. PBMS, a web-based system, will be developed for users' convenience and data monitoring in real time. To sum up, PBMS are expected to maximize efficiency in four aspects including the establishment of repair and replacement work plans for prevention, history management, DB for predicting future work to be occurred and enable the determination of priorities by being developing into facility condition assessment systems through the results of analysis of repair and replacement histories and LCC.

  • PDF