• Title/Summary/Keyword: railway system model

Search Result 839, Processing Time 0.024 seconds

A Real-scale Wind Tunnel Testing on a Pantograph for High-speed Train to Assess the Aerodynamic Characteristics (고속철도차량용 팬터그래프의 공력특성 평가를 위한 실모형 풍동시험)

  • Kwon, Hyeok-Bin;Cho, Young-Hyeon;Lee, Ki-Won;Kim, Ki-Nam
    • Journal of the Korean Society for Railway
    • /
    • v.12 no.5
    • /
    • pp.732-737
    • /
    • 2009
  • Wind tunnel testing on the real-scale pantograph for high-speed train has been conducted to investigate the aerodynamic characteristic of the pantograph at high-speed. The mid-scale subsonic wind tunnel of Korea Airforce Acamedy with 3.5m width, 2.45m height, and 8.8m length test section has been employed. The test model has been supported above 50cm height from the bottom of test section using vertical strut to eliminate the boundary layer generated from the bottom of the test section. The height of the pantograph has been varied in three cases, in both of the normal running and reverse running modes. The resultant lift forces of the pantograph to catenary system in all the cases have been measured and the relation between the test conditions and the lift forces have been extensively analyzed.

Development and Verification of the Steering Algorithm for Articulated Vehicles (굴절차량에 대한 조향알고리즘 개발 및 검증)

  • Moon, Kyeong-Ho;Lee, Soo-Ho;Mok, Jai-Kyun;Park, Tae-Won
    • Journal of the Korean Society for Railway
    • /
    • v.11 no.3
    • /
    • pp.225-232
    • /
    • 2008
  • AWS (all wheel steering) is applied to improve the stability and the turning performance. Most automotive cars are mainly controlled by FWS (front wheel steering) system except some cars which are made to improve their stability by using AWS. Articulated vehicles with a pivoting joint for easy turn are difficult to make a sharp turn because of the long body and long wheelbase. Therefore applying AWS to the articulated vehicles is effective to reduce the turning radius. The AWS control method for the articulated vehicles is currently applied to only Phileas vehicles which were developed by APTS. The paper on the design of a controller to guide an articulated vehicle along the path was published but control algorithm for manual driving has not been reported. In the present paper, steering, characteristics of the Phileas vehicles have been analyzed and then new algorithm has been proposed. To verify the AWS algorithm, Commercial S/W, ADAMS was used for validity of the dynamic model and algorithm.

Grid-Connected Control of Hybrid Energy Storage (하이브리드 에너지 저장장치의 계통연계 제어)

  • Lee, Eon-Seok;Kang, Byeong-Geuk;Choi, Yong-Oh;Chung, Se-Kyo;Oh, Se-Seung;Chae, Suyong;Song, Yujin
    • Journal of the Korean Society for Railway
    • /
    • v.18 no.4
    • /
    • pp.325-334
    • /
    • 2015
  • This paper deals with a control method for a hybrid energy storage system (ESS) with a battery and super capacitor for grid-connected operation. To improve the grid regulation and to minimize the depth of discharge of the battery, control algorithms for the hybrid ESS are proposed. A p-q control with predictive current control is used for the inverters for the super-capacitor and the battery. To verify the effectiveness of the proposed control method, simulation studies using the PSIM and RTDS are carried out for the actual grid model.

Safety evaluation of dynamic behavior of Korean tilting train (TTX차량의 동역학적 거동의 안정성 평가)

  • Yoon, Ji-Won;Kim, Nam-Po;Kim, Young-Guk;Kim, Seog-Won;Park, Tae-Won
    • Journal of the Korean Society for Railway
    • /
    • v.10 no.5
    • /
    • pp.540-545
    • /
    • 2007
  • The tilting train is able to tilt its body towards the center of the turning radius, preventing roll-over of the train as it runs on a curved rail at high-speed. This train, widely accepted for commercial purpose internationally, is very beneficial in that the operating time is shortened without much capital investment to the infrastructure where there are many curved rails. Over several years, the Korea Railroad Research Institute (KRRI) has developed such a train. In this paper, the safety of the Korean tilting train express (TTX) is investigated using a dynamic simulation model. Since proper safety standards have not been established for the TTX, those for the Korean train express (KTX) is employed to analyze the safety and ride comfort of the TTX. This study is useful in predicting the behavior of the TTX and ride comfort, and conforms that designed TTX is stable enough to satisfy the safety standards. It would be useful to recommend proper normal operating speed and determine the maximum safety speed, according to the result. Furthermore, it would be possible to provide basic reference data when analyzing the dynamic effect of the catenary system and the fatigue of the bogie.

Crane Scheduling Considering Tenant Service Time in a Rail-Road Transshipment Yard : Case of the Uiwang ICD (철도-육상트럭 환적지에서의 입주사 작업시간을 고려한 크레인 적하작업 스케줄링 : 의왕ICD 사례)

  • Kim, Kwang-Tae;Kim, Hyo-Jeong;Son, Dong-Hoon;Jang, Jin-Myeong;Kim, Hwa-Joong
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.4
    • /
    • pp.238-247
    • /
    • 2018
  • This paper considers the problem of scheduling loading and unloading operations of a crane in a railway terminal motivated from rail-road container transshipment operations at Uiwang Inland Container Depot (ICD). Unlike previous studies only considering the total handling time of containers, this paper considers a bi-criteria objective of minimizing the weighted sum of the total handling time and tenant service time. The tenant service time is an important criterion in terms of terminal tenants who are private logistics companies in charge of moving containers from/to the terminal using their trucks. In the rail-road container shipment yard, the tenant service time of a tenant can be defined by a time difference between beginning and finishing loading and unloading operations of a crane. Thus, finding a set of sequences and time of the crane operations becomes a crucial decision issue in the problem. The problem is formulated as a nonlinear program which is improved by linearizing a nonlinear constraint in the model. This paper develops a genetic algorithm to solve the problem and performs a case study on the Uiwang ICD terminal. Computational experiment results show that the genetic algorithm shows better performance than commercial optimization solvers. Operational implications in terms of tenants are drawn through sensitivity analyses.

An Experimental Study on the Stress Behavior of Coped Stringers in Steel Railway Bridge - II : Repair · Strengthening Method (철도교 세로보 절취부에서의 응력거동에 관한 실험적 연구 - II : 보수·보강 방법)

  • Li, Guang Ri;Park, Young Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.29 no.4A
    • /
    • pp.307-313
    • /
    • 2009
  • In this study, in order to research the repair-strengthening methods, when fatigue crack occurs in the coped stringers of a steel railway bridge, we manufacture the full size of crossbeam-stringer and floor system model. Also the experimental test is performed on the coped stringers applying the repair-strengthening methods using the stop hole, combination plate, connection plate, bracket, and so on. The results indicate that, the most effective method is to set up connection plate and bracket in the top flange and bottom flange of the stringers, while we can consider the method of punching stop holes in the end of the crack as a subsidiary method. It is necessary to set up the combination plate when the length of crack is quite long.

Development Process of Systems Engineering Management Plan(SEMP) for Large-Scale Complex System Programs (대형 복합 시스템 개발을 위한 효과적인 시스템공학 관리계획 개발 프로세스)

  • 유일상;박영원
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.26 no.4
    • /
    • pp.82-90
    • /
    • 2003
  • The Systems Engineering, as a methodology for engineering and management of today's ever-growing complex system, is a comprehensive and iterative problem-solving process. The process centers on the analysis and management of the stakeholders' needs throughout the entire life-cycle of a system and searches for an optimized system architecture. There are many essential needs and requirements to be met when a system development task is carried out. Systems Engineering Management Plan(SEMP), as a specification for system development process, must be established to satisfy constraints and requirements of stakeholders successfully and to prevent cost overrun and schedule delay. SEMP defines technical management functions and comprehensive plans for managing and controlling the entire system development process, specialty engineering processes, etc. Especially. in the case of a large-scale complex system development program where various disciplinary engineering such as mechanical; electrical; electronics; control; telecommunication; material; civil engineering etc. must be synthesized, it Is essential to develop SEMP to ensure systematic and continuous process improvements for quality and to prevent cost/schedule overruns. This study will enable the process knowledge management on the subject of SEMP as a core systems engineering management effort, that is, definitely defining and continuously managing specification of development process about requirements, functions, and process realization of it using a computer-aided systems engineering software. The paper suggests a systematic SEMP development process and demonstrates a data model and schema for computer-aided systems engineering software, RDD-100, for use in the development and management of SEMP. These are being applied to the systems engineering technology development task for the next-generation high-speed railway systems in progress.

Evaluation of SWMM Model Adjustment for Rubber-tired Tram Disaster Management System against the Snow-melt during the Winter (겨울철 융설을 대비한 바이모달 트램 재해관리 시스템의 SWMM 모형 적용성 평가)

  • Kim, Jong-Gun;Park, Young-Kon;Yoon, Hee-Taek;Park, Youn-Shik;Jang, Won-Seok;Yoo, Dong-Seon;Lim, Kyoung-Jae
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.56-60
    • /
    • 2008
  • Increasing urban sprawl and climate changes have been causing unexpected high-intensity rainfall events. Thus there are needs to enhance conventional disaster management system for comprehensive actions to secure safety. Therefore long-term and comprehensive flood management plans need to be well established. Recently torrential snowfall are occurring frequently, causing have snow traffic jams on the road. To secure safety and on-time operation of the Bi-modal tram system, well-structured disaster management system capable of analyzing the urban flash flooding and snow pack melt/freezing due to unexpected rainfall event and snowfall are needed. To secure safety of the Bi-modal tram system due to torrential snowfall, the snow melt simulation capability was investigated. The snow accumulation and snow melt were measured to validate the SWMM snow melt component. It showed that there was a good agreement between measured snow melt data and the simulated ones. Therefore, the Bi-modal tram disaster management system will be able to predict snow melt reasonably well to secure safety of the Bi-modal tram system during the winter. The Bi-modal tram disaster management system can be used to identify top priority area for snow removal within the tram route in case of torrential snowfall to secure on-time operation of the tram. Also it can be used for detour route in the tram networks based on the disaster management system predicted data.

  • PDF

A Study of Interference on Underground Tunnel in Radio Frequency-Communication Based Train Control System (무선 통신기반 열차제어시스템의 지하구간 전파간섭에 대한 연구)

  • Noh, Young-Un;Lee, Jong-Woo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.1370-1378
    • /
    • 2008
  • In the system necessary for safety such as the train control system, to make train control information be sent correctly is very important. In the case of the system such as RF-CBTC(Radio Frequency-Communication Based Train Control), sometimes failure in correctness of train controlling information may happen because the information is sent throughout wireless transmission between on-board system of a train and wayside transmitter, and then, it is exposed to noises. Of RF-channel interference, there are various forms. Under the environment of mobile telecommunications, adjacent-channel interference and Co-channel interference are in trouble, and under the environment of the wireless LAN, inter-symbol interference is in trouble. Also, the system of the cellular CDMA mobile telecommunication is affected on the RF-channel interference such as Doppler effect, multi-cell interference, and other users' intervention. In this paper, we analyzed the effect of the train control information related to fading, intervention and other noises made in the underground interval and explained the transmission characteristics numerically. Furthermore, we calculated the mean of the error terms by increasing users in the system of the cellular CDMA. As the method for decrease the error term of sent information, we represented the way adjusting the arrangement of antennas, and we did the model related to the system of RF-CBTC in which the location of an antenna is calculated with really measured value of the transmission characteristics and the way confirming reliability of the wireless transmission.

  • PDF

A Study on the Risk based RAMS Assessment for Railway Rolling Stock Systems (철도차량시스템의 위험기반 RAMS 평가에 관한 연구)

  • Park, Mun-Gyu;Han, Seong-Ho
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.64 no.4
    • /
    • pp.220-230
    • /
    • 2015
  • Rolling stock RAMS is a field of engineering which integrates reliability, availability, maintainability and safety (RAMS) characteristics into an inherent product design property through rolling stock system engineering process. It is implemented to achieve operational objectives successfully, and recently the RAMS has become a rapidly growing engineering discipline because it has a great potential to ensure safety and improve cost effectiveness. However, the Korean rolling stock industry has not yet implemented RAMS management in the rolling stock engineering process, despite the issue having been addressed since the introduction of the KTX. Thus, this paper discusses the processes, methods and techniques for RAMS assessment in three parts. Firstly, it outlines a process of the overall RAMS performance assessment for achieving technical RAMS design criteria. Secondly, it discusses a process for assessing the operational RAM and allocating the RAM. This paper also proposes a model for assessing safety-based risk management, which includes five analytic techniques for identifying the causes and consequences of a system failure. Finally, a case example is provided for the risk assessment of the pneumatic braking device.