• Title/Summary/Keyword: railway distribution system

Search Result 174, Processing Time 0.034 seconds

Performance Evaluation on Water-mist Extinguishing System of Railway Vehicles (철도차량 미분무수 소화설비 성능 평가)

  • Park, Won-Hee;Eum, Pu-Reun-Byul;Yoon, Kyung-Beom;Lee, Duck-Hee
    • The KSFM Journal of Fluid Machinery
    • /
    • v.17 no.1
    • /
    • pp.22-27
    • /
    • 2014
  • The test system for the performance of the water-mist extinguishing system in the railway vehicle is equipped and the details of the system are introduced. The three scenarios using different fire sources and performance criteria for the water-mist systems on railway vehicles are also introduced. Three different type of the nozzle at same operating pressure are evaluated. Amount of water-mist distribution is measured by many baskets on the bottom of the test room. Temperature on the ceil and the tree of the test room is measured during the tests that are used for the judgement of the performance on the water-mist extinguishing system.

Study on the maintenance period allocation method for railway signal equipment (철도신호설비 유지보수주기 할당에 관한 연구)

  • Lee, Kang-Mi;Shin, Duck-O;Lee, Jae-Ho
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.647-652
    • /
    • 2008
  • Railway signal system has been more complex, larger and required high reliability. So, maintenance by experience must be changed to optimize maintenance program or introduced systematic method for estabilish new maintenance program. In this paper, we introduced the maintenance period decision method which are Age based method and Block replacement method based on the failure distribution for the equipment. So, we allocated optimum maintenacne period for the railway signal equipment using block replacement method.

  • PDF

Effects of an Overhead Ground Wire and Surge Arrester in the Railway due to Lightning Strokes (전차선로에서의 뇌격에 의한 가공지선과 보안기의 차폐효과)

  • 임성정;김재철;창상훈;정용철
    • Proceedings of the KSR Conference
    • /
    • 2000.05a
    • /
    • pp.93-99
    • /
    • 2000
  • Using the EMTP(Electro Magnetic Transient Program) for the analysis of lightning direct voltage on the railway system, the shielding effects of overhead grounding wire on the railway were studied quantitatively. Installation of overhead ground wire and gap-type arrester such as s-horn Provides a 6.6㎸ HV distribution line with good protection effects. Even severe lightning induced voltage were create, 6.6㎸ HV lines can be withstand.

  • PDF

A Study on the Development of Safety Management Checklist Using Accident Case adjacent to Railway Operation (철도운행선 인접공사 사고분석과 체계적인 체크리스트 개발 등 안전대책 수립에 관한 연구)

  • Ryu, Sang-Hwan;Yum, Byeoung-Soo;Gal, Won-Mo
    • The Journal of Industrial Distribution & Business
    • /
    • v.9 no.10
    • /
    • pp.63-72
    • /
    • 2018
  • Purpose - This thesis is to develop a management plan and checklist by analyzing the prevention of accidents in advance by presenting the management plan for the major causes of railway accidents. Research design, data and methodology - In recent 5 years, we have analyzed the cases of railway accident, presented the management plan for the accident, and made a practical safety checklist focusing on the main measures according to the management plan. Results - The analysis of the cases of near-railway accidents suggests more concrete and practical safety management measures because the similar accidents are continuously occurring due to formal safety management. Conclusions - It is more valuable to apply to the adjacent construction of the railway line by creating a detailed checklist based on cases rather than the existing checklist. This study is written only as a human factor. For future real - time safety management, it is necessary to study more precisely cause analysis and safety equipment as a big data - based safety control system for more systematic safety management.

The Development of the Train Performance Simulation Program for Railway Vehicles equipped with Energy Storage System (에너지 저장장치를 탑재한 철도차량의 소비에너지 시뮬레이션 프로그램 개발)

  • Oh, Yong-Kuk;Lee, Jee-Ho;Kwak, Jae-Ho;Hwang, Hyeon-Cheol
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2336-2341
    • /
    • 2011
  • The studies on railway vehicles equipped with various energy storage system is proceeded actively. These have a lot of advantages like the maximizing reuse of the regeneration energy, the decrease of peak power in catenary and the reduction of infrastructure costs through catenary-free travelling. This paper is focused on the development of the TPS (Train Performance Simulation) program for railway vehicles equipped with energy storage system. The battery and ultra-capacitor system are modeled using Matlab/Simulink among several energy storage systems. And the feasibility of simulation model is evaluated with the basic power distribution algorithm.

  • PDF

A Study on Three Parallel Operation Control Algorithm of Thyristor Dual Converter System for Urban Railway Substation (도시 철도용 사이리스터 듀얼 컨버터 시스템의 3병렬 운전 제어 기법에 관한 연구)

  • Kim, Sung-An;Han, Sung-Woo;Cho, Yun-Hyun
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.66 no.2
    • /
    • pp.459-467
    • /
    • 2017
  • An urban railway power substation consists of three thyristor dual converters. Two converters are connected to up and down trolley line to supply the electric energy or feed the regenerative energy back to the distribution. When the two converters break down, the remaining converter is used in an emergency. One thyristor dual converter system (TDCS) manages the energy of two or three railway stations. If the TDCS fails, the trains stop operating. To solve the problem, this paper proposes the three parallel operation control algorithm of thyristor dual converter system using the emergency converter. The broken TDCS can be replaced by the emergency converter in other TDCS. The effectiveness of this proposed control is verified by simulation.

Verification Efficiency the Trian Depot (성남~여주 복선전철 부발차량기지 배선 효율성 검증)

  • Kim, Byung-Kook;Woo, Sung-Won;Jung, Jae-Hyung;Shin, Hyun-Gon
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.2077-2081
    • /
    • 2011
  • Recently the train indusrty come to the fore because of Punctual, eco-friendly transportation system and becoming the main transportation. The construction plans for the trian depot for train's maintenance and storage increase constantly. For past few years, there were many construction plans, Bubal train depot, Gwangju train depot, Duckha train depot. Proper track distribution plan is important to carry out the design of railway depot for efficient maintenance operation and train storage. Through the proper design of track distribution plan, we can shorten the moving time, train movement distance, waiting time in train depot. In this paper, the verification of the track distribution plan's efficiency and appropriateness for railway depot as Bubal train depot's plan is studied and analyzed with the train depot management simulation program-Posrail(v1.0).

  • PDF

A Study on the Protection System for AT Feeding on the Electric Railway (전기철도 AT급전방식 보호시스템 최적구성 방안 연구)

  • 창상훈;이형수;홍재승;김정훈
    • Proceedings of the KSR Conference
    • /
    • 1999.11a
    • /
    • pp.344-351
    • /
    • 1999
  • The safe operation of electro railways is greatly dependant on its protective systems. The system so-called Fault Protection Wire(FW) is now widely adapted to protect in AT feeding systems. It is connected between the feeder and trolley circuit to return the fault current to autotransfonmers at substation. This paper computed the distribution of fault currents at FW in the system and also evaluated the safety from electric shock when ground fault or flashover occur in the feeding system. The results show FW is useful to protect power supply network from fault in electric railways

  • PDF

Fault Location Estimation Algorithm in the Railway High Voltage Distribution Lines Using Flow Technique (반복계산법을 이용한 철도고압배전계통의 고장점표정 알고리즘)

  • Park, Kye-In;Chang, Sang-Hoon;Choi, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.2
    • /
    • pp.71-79
    • /
    • 2008
  • High voltage distribution lines in the electric railway system placed according track with communication lines and signal equipments. Case of the over head lines is occurrence the many fault because lightning, rainstorm, damage from the sea wind and so on. According this fault caused protection device to wrong operation. One line ground fault that occurs most frequently in railway high voltage distribution lines and sort of faults is line short, three line ground breaking of a wire, and so on. For this reason we need precise maintenance for prevent of the faults. The most important is early detection and fast restoration in time of fault for a safety transit. In order to develop an advanced fault location device for 22.9[kV] distribution power network in electric railway system this paper deals with new fault locating algorithm using flow technique which enable to determine the location of the fault accurately. To demonstrate its superiorities, the case studies with the algorithm and the fault analysis using PSCAD/EMTDC (Power System Computer Aided Design/Electro Magnetic Transients DC Analysis Program) were carried out with the models of direct-grounded 22.9[kV] distribution network which is supposed to be the grounding method for electric railway system in Korea.

Probability Distribution of Track Recording Data (궤도틀림 검측 데이타의 확률분포 검토)

  • Lee, Jee-Ha;Na, Sung-Hoon;Kim, Bag-Jin;Lee, You-Bok
    • Proceedings of the KSR Conference
    • /
    • 2010.06a
    • /
    • pp.310-314
    • /
    • 2010
  • Track geometry changes by traffic loads. The bigger the changes are, the worse the riding comfort and running stability of train. This is so-called track irregularity and is the most important quality parameters of ballasted track. To objectively assess track irregularity, track geometry should be able to be measured. Practically, railway companies in Korea use normal distribution as probability distribution of track irregularity. But some countries use non-normal distribution according to their own track recording system. In this report, reviewed probability distribution of Kyung-Bu high-speed line and tested normality.

  • PDF