THE FEATURE CONSIDERATION AND PLAN FOR DEFINITION SYSTEMATIZATION OF CLIENT'S REQUIREMENT

  • Su-Kyung Cho;Chang-Hyun Shin;Jea-Sauk Lee;Jae-Youl Chun
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.635-641
    • /
    • 2007
  • The construction starts its business by receiving the order from client and owner. The client presents requirements and related information so that the desired result can come out while the designer and the builder express and implement the building according to set objectives and goals of project based on information on project environment and presented requirements. Because the construction project makes decisions on such objectives at its early stage and previous stage becomes the situation for decision making of next stage as the computation to implement decisions get performed. Accordingly, this study has mentioned necessity of requirement analysis and systematization of construction project, analyzed the work of construction's early stage and resented a plan for objective of construction project requirement definition model in which requirements engineering has been applied and using it while making decisions on designing.

  • PDF

일본 도쿄도의 '하우징 퍼스트' 시책에 대한 평가와 가능성 - "홈리스 지역생활 이행지원 사업" 을 중심으로- (Possibilities and Evaluation of the Tokyo Metropolitan 'Housing First' Program -Focusing on Its "Support Program for Helping the Homeless Reintegrate"-)

  • 전창미;전홍규;이나다나나미;남원석;타지미 사콘
    • 한국주거학회:학술대회논문집
    • /
    • 한국주거학회 2009년도 추계학술발표대회 논문집
    • /
    • pp.126-131
    • /
    • 2009
  • The purpose of this research is to find out The Support Program for Helping the Homeless Reintegrate-a separate program from the homeless supporting system in which Tokyo Metropolitan is emphasizing the existing job-producing support- and its significance and possibility. For this purpose, this research was performed a literature review of the summary of the project and conducted an interview survey for private organizations(social welfare corporation, NPO corporation, etc.) which were involved in the project, and its users. This research looked into the importance and effect of Housing First Policy which is putting emphasis on the necessity of the personally needed support(life support, and work-finding support) after having to secure housing more preferentially than anything else in order for the homeless to keep up a stable living in supporting the homeless. According to Tokyo Metropolitan, 81.6% of the homeless, who were actually involved in this project, were found to make their living continuously at a district based on self-support through finding work and livelihood protection benefits, etc., thus being able to confirm its politic possibility; however, there still remain some issues to be solved in such as, housing level and continuous support of finding work.

  • PDF

Construction Delay Analysis Using Daily Work Report Data for Short Construction Seasons

  • Jamal, Md Shah;Abdelaty, Ahmed;Shrestha, K. Joseph
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.616-623
    • /
    • 2022
  • Some regions and states, such as Wyoming, have harsh weather conditions, forcing most transportation projects to be completed under tight schedules. However, construction projects are not only delayed by weather conditions, but also delayed by other factors such as contractor's competency, resource availability, coordination issues, and safety. Also, the construction method, geographical location of the projects, and inability to follow baseline schedules accurately due to the contractor's resource allocation are also reasons for the delay. This paper discusses the main reasons for the delay in the public transportation projects based on Daily Work Reports (DWRs) from five different transportation projects of the last three years in Wyoming. This paper focuses on the inconsistencies of the contractor's schedules to complete the project according to the baseline schedule. First, the authors collected DWRs and baseline schedules from the Wyoming Department of Transportation (WYDOT). Second, the DWR data are compared against the baseline schedules to determine the reasons for delaying their significance. Finally, the paper presents the recommendations to mitigate the effects of delays on public transportation projects as well as to improve the documentation process of DWR data.

  • PDF

일반농산어촌개발 지역역량강화사업비의 적정요율 산정 (An Estimation of the Standard Cost of Project Management of Empowerment Sector in Comprehensive Rural Village Development Project)

  • 최영완;박현용;김영주
    • 농촌계획
    • /
    • 제19권3호
    • /
    • pp.131-144
    • /
    • 2013
  • The existing standard cost of project management of empowerment sector in general rural development project has problems with standard cost system without considering characteristics of empowerment project and unclear division of works. These problems are a lot of trouble to fulfill the project. Thus, it needs an arrangement of standard cost considering detailed characteristics of project management in the empowerment sector. The contents and results of this study can be summarized as follows. 1) To set accurate standard cost, we carried out three-step processes, such as elicitation of standard works, calculation of workload and determination of standard cost. (1) In an investigation of 30 rural area dividing 8 parts about an workload of empowerment project, an average workload is 1,499 hours. (2) Based on this results, the standard cost is calculated at 15% of project cost in over 600 million won, at 28.75% of project cost in under 500 million won, by standards of empowerment project cost. 2) It set the responsibility management cost to 15% of empowerment project cost considering existing awareness, workload and work professionalism of project management. Based on the results, It suggested the practical use as basis for efficient management of the future empowerment projects. To achieve this, It needs to promote maximizing results on the whole project through the legalization processes including amendment of existing regulations.

Virtual Design and Construction (VDC)-Aided System for Logistics Monitoring: Supply Chains in Liquefied Natural Gas (LNG) Plant Construction

  • Moon, Sungkon;Chi, Hung-Lin;Forlani, John;Wang, Xiangyu
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.195-199
    • /
    • 2015
  • Many conventional management methods have emphasized the minimization of required resources along the supply chain. Accordingly, this paper presents a proposed method called the Virtual Design and Construction (VDC)-aided system. It is based on object-oriented resource control, in order to accomplish a feed-forward control monitoring supply chain logistics. The system is supported by two main parts: (1) IT-based Technologies; and (2) VDC Models. They enable the system to convey proactive information from the detection technology to its linked visualization. The paper includes a field study as the system's pre-test: the Scaffolding Works in a LNG Mega Project. The study demonstrates a system of real-time productivity monitoring by use of the RFIDbased Mobile Information Hub. The on-line 'productivity dashboard' provides an opportunity to display the continuing processes for each work-package. This research project offers the observed opportunities created by the developed system. Future work will entail research experiments aimed towards system validation.

  • PDF

PRODUCTIVITY PREDICTION MODEL BASED ON PRODUCTIVION INFLUENCING FACTORS: FOCUSED ON FORMWORK OF RESIDENTIAL BUILDING

  • Byungki Kwon;Hyun-soo Lee;Moonseo Park;Hyunsoo Kim
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.58-65
    • /
    • 2011
  • Construction Productivity is one of the most important elements in construction management. It is used in construction process scheduling and cost management, which are significant sector in construction management. It is important to make appropriate schedule and monitor how works are done within schedule. But construction project contains uncertainty and inexactitude, modifying construction schedule is being an issue to manage construction works well. Even though prediction and monitoring of productivity can be principal activity, it is hard to predict productivity with manager's experience and a standard of estimate. A large number of factors influencing productivity, such as drawing, construction method, weather, labor, material, equipment, etc. But current calculation of productivity depends on empirical probability, not consider difference of each influencing factor. In this research, the aim is to present a productivity predicting regression model of form work, which includes effectiveness of influences factors. 5 variables existed inside form work are selected by interview and site research based on literature review of existed various productivity influencing factors. The effectiveness and correlation of productivity influencing factors are analyzed by statistical approach, and it is used to make productivity regression model. The finding of this research will improves monitoring and controlling of project schedule in construction phase.

  • PDF

앱을 이용한 프로젝트관리 학습 커뮤니티에 관한 연구 (A Study on Project Management Learning Community using Application)

  • 조도은;김시정
    • 한국항행학회논문지
    • /
    • 제15권6호
    • /
    • pp.1126-1131
    • /
    • 2011
  • 최근 교육의 패러다임이 학습자 중심으로 변화되면서 새로운 수업모델의 하나로 프로젝트 기반 수업에 대한 관심이 증대되고 있다. 대학에서는 이러한 변화를 수용하여 창의적으로 변화를 창출 할 수 있는 차세대 인재를 육성하는데 교육의 목표를 두고, 그에 따른 연구가 활발히 진행되고 있다. 본 연구에서는 대학에서 실시되는 설계 교과목의 주된 교과 내용인 프로젝트를 수행하는데 있어서, 최소화된 교수자의 개입과 주도적인 학습자 중심의 교수학습 모델을 제안하였다. 제안된 모델은 프로젝트 기반 수업의 지원체제, 팀 편성방법, 학습자의 다양한 상호작용 방법, 교수자의 팀워크 모니터링 방식 등을 제시하였으며, 이를 최근 사용이 급증하고 있는 스마트폰을 이용한 프로젝트관리 어플리케이션으로 설계 및 구현하였다.

가상현실을 이용한 건설공사 설계단계의 파라미터기반 3D객체 생성체계 구축방안 (Development of Parameter-based 3D Object Generation System by Using Virtual Reality for Construction Project Design Phase)

  • 강인석;권중희;문진석;문현석;지상복
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 2008년도 정기 학술대회
    • /
    • pp.108-113
    • /
    • 2008
  • Virtual construction (VC) system enables project manager to visually check mistakes in design materials by using virtual reality technology. In using VC system, to make 3D object by each construction element is still tedious work. This study suggests an improved method to make 3D object by using parameter-based 3D generation function. The IDEFO model to organize the process for the function. A VC system by this function was developed in this study and the function was verified by a bridge project in this system.

  • PDF

시나리오 역학 게임을 통한 신속 시스템 설계/검증방법 -패키지 응용시스템을 대상으로- (Rapid System Design/Validation Method through Scenario Based Role Playing Game -for Package Based System Implementation-)

  • 예동경;이용재;강두호;최열현
    • 한국CDE학회지
    • /
    • 제4권2호
    • /
    • pp.30-35
    • /
    • 1998
  • Recently, many enterprises wish to preoccupy competitive positions in the market by motivating themselves towards CALS(Commerce At Light Speed) and try hard to achieve system implementation with the use of new concept-based backbone systems such as ERP(Enterprise Resource Planning) or PDM(Product Data Management). However, unfortunately there is an inevitable discrepancy during implementation period between package vendors and customers due to lack of clear methodology and misunderstanding about system. In some cases, consensus on partially verified system design invokes customers'continuous change demands and often it tends to result in unnecessary project delays. PDM application system implementation project of the company L has been studied here to solve these sorts of problems. The major yields of this work are achievement of a willing approval from customers and rapid system design under a time-limited and conceptually defined project scope and finally, through fully verified system design, we were able to reach successful system implementation.

  • PDF

A Methodology of Open BIM-based Quantity take-off for Schematic Estimation of the Frame Work in Early Design Stage

  • Hansaem Kim;Jungsik Choi;Inhan Kim
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.419-425
    • /
    • 2013
  • Recently AEC industry has required construction automation according to becoming large and complex. Thus BIM-based construction project is increased and used in whole fields of AEC industry. Quantity take-off and estimation fields are important factor for decision-making in conceptual and schematic design stages of construction projects. The purpose of this study improves reliability of the estimation through QTO based on Open BIM. Scope and method to apply QTO is to select conceptual design stage through LoD(Level of Detail) in AEC field and to extract information from BIM model through analysis of IFC structure. This study proceeds three step to make BIM model and check the model quality and calculate QTO. The methodology of QTO using IFC is to verify of result in this study and expects utilizing in design stage of construction projects. The result from this study is expected to decrease the risk factor and time of estimation in the project early phase through improving reliability of schematic estimation.

  • PDF