• Title/Summary/Keyword: project identification

Search Result 386, Processing Time 0.025 seconds

A Development of the Risk Identification Checklist through the Re-establishment of Risk Breakdown Structure of Construction Project (건설사업 위험분류체계의 재정립을 통한 위험인지 체크리스트 개발)

  • Chu Hae-Keum;Kim Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.4 no.2 s.14
    • /
    • pp.109-117
    • /
    • 2003
  • The construction project is largely exposed to much more risk events over the project life cycle due to its complexity and size than the other industries. Therefore, the construction risk management process to identify and response the risk events is not only performing acutely but also proceeding systematically. The risk identification phase in the risk management process is to identify various risk events and define its characteristics. At this phase, the risk identification system is very useful tool to identify every possible risk events in the project. This study shows some problems of the existing risk identification system and proposes the modified risk identification system based on the project phases and the contract bodies, and also suggests partial but more enough detailed risk checklists to be implemented in the actual risk identification phase than any other existing risk breakdown systems to be examined at this study.

An Improved Multilevel Fuzzy Comprehensive Evaluation to Analyse on Engineering Project Risk

  • LI, Xin;LI, Mufeng;HAN, Xia
    • The Journal of Economics, Marketing and Management
    • /
    • v.10 no.5
    • /
    • pp.1-6
    • /
    • 2022
  • Purpose: To overcome the question that depends too much on expert's subjective judgment in traditional risk identification, this paper structure the multilevel generalized fuzzy comprehensive evaluation mathematics model of the risk identification of project, to research the risk identification of the project. Research design, data and methodology: This paper constructs the multilevel generalized fuzzy comprehensive evaluation mathematics model. Through iterative algorithm of AHP analysis, make sure the important degree of the sub project in risk analysis, then combine expert's subjective judgment with objective quantitative analysis, and distinguish the risk through identification models. Meanwhile, the concrete method of multilevel generalized fuzzy comprehensive evaluation is probed. Using the index weights to analyse project risks is discussed in detail. Results: The improved fuzzy comprehensive evaluation algorithm is proposed in the paper, at first the method of fuzzy sets core is used to optimize the fuzzy relation matrix. It improves the capability of the algorithm. Then, the method of entropy weight is used to establish weight vectors. This makes the computation process fair and open. And thereby, the uncertainty of the evaluation result brought by the subjectivity can be avoided effectively and the evaluation result becomes more objective and more reasonable. Conclusions: In this paper, we use an improved fuzzy comprehensive evaluation method to evaluate a railroad engineering project risk. It can give a more reliable result for a reference of decision making.

Promoting Uncertain Exploration : A Case Study (불확실한 탐험을 촉진하는 방법 : 사례연구)

  • Ha, Seongwook
    • Knowledge Management Research
    • /
    • v.10 no.1
    • /
    • pp.53-70
    • /
    • 2009
  • This study empirically explored what promotes exploration, through a case analysis of a Korean SME (small and medium sized enterprise), based on the research framework which focuses on the identification and the selection of exploratory NPD (new product development) alternatives, and the accumulation of novel capabilities in new technology domains. The learning process of the exploratory NPD project described is as follows. The identification barrier of exploratory NPD project is relatively low. Constructive crisis is germane to selecting exploratory NPD alternatives and to enduring the long payback period. New separated R&D unit is likely to implement the exploratory NPD project. The length of the gestation period of the exploratory NPD project is related with the level of the conflict between old members and new members. This study identified several antecedents of the exploratory NPD project. Prior success promotes the identification process of the exploratory NPD projects. Constructive crisis is related with CEO's personal characteristics such as future oriented and proactive personality. The proactive involvement and persuasion of CEO are germane to reducing the conflict between old and new members and to the success of the exploratory NPD project. Based on the results, this study discusses several implications and future research directions.

  • PDF

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

AI-Based Project Similarity Evaluation Model Using Project Scope Statements

  • Ko, Taewoo;Jeong, H. David;Lee, JeeHee
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.284-291
    • /
    • 2022
  • Historical data from comparable projects can serve as benchmarking data for an ongoing project's planning during the project scoping phase. As project owners typically store substantial amounts of data generated throughout project life cycles in digitized databases, they can capture appropriate data to support various project planning activities by accessing digital databases. One of the most important work tasks in this process is identifying one or more past projects comparable to a new project. The uniqueness and complexity of construction projects along with unorganized data, impede the reliable identification of comparable past projects. A project scope document provides the preliminary overview of a project in terms of the extent of the project and project requirements. However, narratives and free-formatted descriptions of project scopes are a significant and time-consuming barrier if a human needs to review them and determine similar projects. This study proposes an Artificial Intelligence-driven model for analyzing project scope descriptions and evaluating project similarity using natural language processing (NLP) techniques. The proposed algorithm can intelligently a) extract major work activities from unstructured descriptions held in a database and b) quantify similarities by considering the semantic features of texts representing work activities. The proposed model enhances historical comparable project identification by systematically analyzing project scopes.

  • PDF

PROBLEMS AND SOLUTION OF IDENTIFICATION AND APPROVAL OF PRIVATELY FINANCED INFRASTRUCTURE PROJECTS IN CHINA

  • Xiangrong Du;Tsunemi Watanabe
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.731-736
    • /
    • 2005
  • The governmental attitude toward private investment and financing for infrastructure projects has changed from the initial prohibition to the current encouragement in China, which has been embodied in the legal documents and administrative process. However, the problem of identification, bidding, and approval procedure for privately financed infrastructure projects has been observed in policies and administrative measures promulgated by different or even the same government branches, which is prohibitive factors for smooth project implementation. After analysis of the identification, bidding, and approval process of infrastructure projects, the authors proposed a simplified and alternative procedure and clarified the key points of relevant project documents.

  • PDF

IDENTIFICATION OF SIGNIFICANT CRITERIA FOR SELECTION OF CONSTRUCTION PROJECT MANAGERS IN IRAN

  • Abbas Rashidi;Fateme Jazebi;Mohamad Hassan Sebt
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1564-1569
    • /
    • 2009
  • Project managers play a key role in cost, time, and quality of a project. Selection of an appropriate project manager, therefore, is considered as one of the most important decisions in any construction project. It should be noted that most important decision makings are carried out by the project manager throughout the project. Traditionally, project manager selection in construction companies in Iran is through organizing an interview with candidates and selecting the most appropriate choice in accordance with the capabilities, potentials and individual specifications coupled with the requirements of the project. In the same direction, organizing interview on selection of appropriate candidate is usually carried out by senior managers of companies. Determination of the most important criteria for selection of project managers and also identification of significance coefficient of each criterion can highly help senior managers of companies to make sound selection decisions. In this paper, a numerical model has been considered for determination of significance of each criterion, details of which are submitted for selection of project manager in Iranian petrochemical, oil and gas sector companies. For this reason, all criteria- considered by senior managers of the companies under study- are first determined. Then, information obtained through 38 interviews, conducted by senior managers of the mentioned companies while selecting project manager, is analyzed. Significant coefficient of each criterion is calculated through the accumulated data using fuzzy curves method.

  • PDF

A study on the development on project scope management module using rule and case-based reasoning (규칙과 사례기반추론 기법을 이용한 프로젝트 범위관리 모듈 개발에 관한 연구)

  • Shin, Ho-Kun;Jeon, Sung-Ho;Kim, Chang-Ho
    • The Journal of Information Technology
    • /
    • v.7 no.3
    • /
    • pp.127-137
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of a project. Scope management for a project planning is also essential job in system integration project. However project planning is very difficult because lots of factors and their relationships should be considered. Therefore project planning of system integration project has been done by project manager's own knowledge and experience. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study presents a methodology to cope with the limitations of the existing studies that have uniformly been customizing the methodology by only project complexity. We propose PPSM(Project planning support module) based on determination rules regarding route maps and document levels, and CBR(Case-Based Reasoning) for WBS identification.

  • PDF

A Study on Identification System for Abnormally Scanned Cartoon Books (비정상 북스캔 만화 저작물 식별방법에 관한 연구)

  • Kim, Tae-Hyun;Yoon, Hee-Don;Kang, Ho-Gab;Cho, Seong-Hwan
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.3
    • /
    • pp.35-41
    • /
    • 2015
  • In order to solve the problems that fingerprinting technologies and image identification technologies for digital music and videos identification scanned have not yet been enough to identify scanned cartoon books, the copyright project granted from the Korea Copyright Commission(Project title: Identification and Copy Protection Technology of Scanned Text/Comic Books) secured basic solutions for scanned cartoon books. The first result of the research project in 2013 was focused on the identification technology applied to abnormally scanned cartoon books. As subsequent research for the project, studies in the year of 2014 has been to provide solutions to identify cartoon books which abnormally scanned and occurred with transformations and distortions and solutions to protect the system from trials to devitalize functions of the identification system through various attacks. This paper is to propose a model for a system for identifying abnormally scanned cartoon books as a way of enhancing the identification rates for identifying abnormal bookscans and transformation attacks.

Anatomic Description of the Infraorbital Soft Tissues by Three-dimensional Scanning System

  • Peralta, Alonso Andres Hormazabal;Choi, You-Jin;Hu, Hyewon;Hu, Kyung-Seok;Kim, Hee-Jin
    • Journal of Korean Dental Science
    • /
    • v.14 no.2
    • /
    • pp.101-109
    • /
    • 2021
  • Purpose: For minimally invasive procedures, three-dimensional (3D) anatomical knowledge of the structures of the face is essential. This study aimed to describe the thickness of the skin and subcutaneous tissue and depths of the facial muscles located in the infraorbital region using a 3D scanner to provide critical clinical anatomical guidelines for improving minimally invasive cosmetic procedures. Materials and Methods: The 3D scanning images of 38 Korean cadavers (22 males and 16 females; age range: 51~94 years at the time of death) were analyzed. Eight facial landmarks (P1~P8) were marked on the cadaveric faces. The images were scanned in three steps-undissected face, hemiface after skinning, and revealing the facial muscles. Student's t-test was used to identify significant differences. Result: The skin and subcutaneous tissue tended to become thicker from the upper to lower and medial to lateral aspects, and the muscles followed the same pattern as that of the most superficial located muscle and the deepest located muscles. No significant sex-related differences were found in the skin at any landmark. However, the muscles tended to be deeper in the female participants. Conclusion: The study data can serve as a basis for creating or enhancing clinical anatomy-based guidelines or improving procedures in the infraorbital region.