• Title/Summary/Keyword: project approach

Search Result 1,370, Processing Time 0.027 seconds

Knowledge-Based Model for Forecasting Percentage Progress Costs

  • Kim, Sang-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.5
    • /
    • pp.518-527
    • /
    • 2012
  • This study uses a hybrid estimation tool for effective cost data management of building projects, and develops a realistic cost estimation model. The method makes use of newly available information as the project progresses, and project cost and percentage progress are analyzed and used as inputs for the developed system. For model development, case-based reasoning (CBR) is proposed, as it enables complex nonlinear mapping. This study also investigates analytic hierarchy process (AHP) for weight generation and applies them to a real project case. Real case studies are used to demonstrate and validate the benefits of the proposed approach. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs.

Path-Analysis for Minimize a Conflict on Urban Regeneration Project (도시재생사업의 갈등 최소화를 위한 경로분석)

  • Kim, Ka-Ram;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.181-184
    • /
    • 2011
  • The earlier studies which are related to conflict management for urban regeneration project were based on limited case-studies on a specific phase. In addition, those studies did not considered a multidisciplinary approach for critical factor of conflict occurrence. In this reason, to establish a practical management or a policy is limited. In this paper, 'Good communication and information sharing' and 'Cooperativeness of stakeholders on project' are defined by critical factors for minimization of conflict between stakeholders. Furthermore we analysis the influence of those factors to minimization of conflict using path-analysis. This paper contributes to increase the efficiency of conflict management through understanding influence of each factors.

  • PDF

A multi-objective decision making model based on TLBO for the time - cost trade-off problems

  • Eirgash, Mohammad A.;Togan, Vedat;Dede, Tayfun
    • Structural Engineering and Mechanics
    • /
    • v.71 no.2
    • /
    • pp.139-151
    • /
    • 2019
  • In a project schedule, it is possible to reduce the time required to complete a project by allocating extra resources for critical activities. However, accelerating a project causes additional expense. This issue is addressed by finding optimal set of time-cost alternatives and is known as the time-cost trade-off problem in the literature. The aim of this study is to identify the optimal set of time-cost alternatives using a multiobjective teaching-learning-based optimization (TLBO) algorithm integrated with the non-dominated sorting concept and is applied to successfully optimize the projects ranging from a small to medium large projects. Numerical simulations indicate that the utilized model searches and identifies optimal / near optimal trade-offs between project time and cost in construction engineering and management. Therefore, it is concluded that the developed TLBO-based multiobjective approach offers satisfactorily solutions for time-cost trade-off optimization problems.

THE PRICE OF RISK IN CONSTRUCTION PROJECTS: CONTINGENCY APPROXIMATION MODEL (CAM)

  • S. Laryea;E. Badu;I. K. Dontwi
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.106-118
    • /
    • 2007
  • Little attention has been focussed on a precise definition and evaluation mechanism for project management risk specifically related to contractors. When bidding, contractors traditionally price risks using unsystematic approaches. The high business failure rate our industry records may indicate that the current unsystematic mechanisms contractors use for building up contingencies may be inadequate. The reluctance of some contractors to include a price for risk in their tenders when bidding for work competitively may also not be a useful approach. Here, instead, we first define the meaning of contractor contingency, and then we develop a facile quantitative technique that contractors can use to estimate a price for project risk. This model will help contractors analyse their exposure to project risks; and also help them express the risk in monetary terms for management action. When bidding for work, they can decide how to allocate contingencies strategically in a way that balances risk and reward.

  • PDF

OPTION DESIGN STRATEGIES FOR INFRASTRUCTURE PROJECTS

  • Charles Y. J. Cheah;Jicai Liu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.980-985
    • /
    • 2005
  • Since the 1980s, Build-Operate-Transfer and its variations have become a common approach to develop large-scale infrastructure projects. Despite the slight variations in contractual settings, the key issue for all parties concerned is to assess the risks and uncertainties inherent in a project. The risk factors studied and highlighted by past researchers are very diverse. This paper starts with an objective to compare the risk factors in different sectors of infrastructure, and then categorize them into two kinds: general and specific. Following this classification, risk mitigation strategies should be adopted differently at the corporate and project levels. A few short cases have also been used to illustrate the flexible measures or "options" that some project participants have designed to address risks and uncertainties at the two levels.

  • PDF

A Study for Conflict in Public Construction Projects Based on Online News (온라인 뉴스 기반 공공건설사업 갈등지수 산정에 관한 기초연구)

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Lim, Jonglok;Nam, Jihyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.277-278
    • /
    • 2021
  • Conflict in public construction projects has increased for the last decades. It not only entails enormous social and economic costs but also makes stakeholders suffer from unnecessary expense and time waste. This study defines the the conflict index for public construction projects based on news data, and calculates conflict index for representative past and current public construction projects that has been deepened conflicts at the national level. The result indicates that the major conflict issue of the 2nd Jeju Airport Project are the environment and location whereas that of the Gaduk New Airport Project are the safety, location and necessity. This approach is expected to enable construction project managers to manage conflicts quantitatively based on comparing with past cases.

  • PDF

Exploring the adoption of IPD practices in Chinese construction industry

  • Li, Shan;Ma, Qiuwen
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.245-251
    • /
    • 2017
  • Integrated Project Delivery (IPD) is a procurement method that has been proved to improve construction project performance. However, in China implementation of IPD practices in construction projects is unknown though some researchers have studied the problems and constraints in adoption IPD. The purpose of this study was to explore IPD adoption in Chinese construction industry. Critical components of IPD implementation were reviewed, and questionnaires were distributed to collect industry views. The results revealed that IPD uptake is still low. In particular, the liability waiver and shared risks and rewards have been rarely used. In addition, co-location, value engineering method and the new compensation approach have also been hardly adopted. Some practices related to early involvement of key parties were adopted. Surprisingly, the findings indicate that the client has been continuously involved in the projects. The findings may imply that the legal issues and problems of contractual frameworks are still constraining IPD implementation in Chinese construction industry.

  • PDF

Review of Construction Business Intelligence Research

  • Baek, Seungwon;Han, Seung Heon;Yun, Sungmin;Jung, Wooyong
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.371-380
    • /
    • 2020
  • With the 4th industrial revolution, many advanced information technologies are being applied to the area of construction engineering and project management. These applications are usually focusing on design, construction and operation stage and are producing many meaningful fruits. Even though these studies are very important for the development of the construction industry, this study insists that the other stage perspective such as construction business also should be emphasized. Because business phase has significant impacts on the success of a construction project as well as design, construction and operation phase. So, this study reviewed the intelligent-approach papers in planning and marketing, estimation and bid, contract and claim, and project financing fields. This study provides some insights such as values, difficulties, limitations and future directions of business intelligence application.

  • PDF

Policy Implications of Performance Sharing through E-Government ODA Project - Focusing on the Nigerian e-government master plan project - (전자정부 ODA사업을 통해 본 성과공유의 정책적 함의 - 나이지리아 전자정부 마스터 플랜 사업을 중심으로-)

  • Kim, Young Mi
    • Journal of Convergence for Information Technology
    • /
    • v.10 no.4
    • /
    • pp.11-17
    • /
    • 2020
  • South Korea started to actively participate in the ODA project across Asia, Africa, the Middle East, CIS countries, and Latin America as it transitioned from a country receiving developmental aid to a donor country. As more and more recipient countries are looking into the e-government model of South Korea, a new approach to the Korean model is being investigated. Various promotions were made, ranging from the implementation of the e-government ODA project, review of its feasibility to evaluation of the results. In order to improve and maximize performance management OD projects, it is necessary to look into the analysis of its follow-up results. In this study, practical performance management and policy implications were explored, focusing on the e-government ODA project. In particular, a case study analysis was attempted with focus on the Nigerian e-government project promoted as part of the project. It focused on Korea's e-government linkage process, implementation procedures and strategies applied when establishing the e-government master plan and suggested the necessity of an approach suitable for new environmental changes. In terms of sustainability of the ODA project, it is necessary to build a Korean e-government model that reflects the new intelligence information technology.

Web-based Three-step Project Management Model and Its Software Development

  • Hwang Heung-Suk;Cho Gyu-Sung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2006.05a
    • /
    • pp.373-378
    • /
    • 2006
  • Recently the technical advances and complexities have generated much of the difficulties in managing the project resources, for both scheduling and costing to accomplish the project in the most efficient manner. The project manager is frequently required to render judgments concerning the schedule and resource adjustments. This research develops an analytical model for a schedule-cost and risk analysis based on visual PERT/CPM. We used a three-step approach: 1) in the first step, a deterministic PERT/CPM model for the critical path and estimating the project time schedule and related resource planning and we developed a heuristic model for crash and stretch out analysis based upon a time-cost trade-off associated with the crash and stretch out of the project. 2) In second step, we developed web-based risk evaluation model for project analysis. Major technologies used for this step are AHP (analytic hierarchy process, fuzzy-AHP, multi-attribute analysis, stochastic network simulation, and web based decision support system. Also we have developed computer programs and have shown the results of sample runs for an R&D project risk analysis. 3) We developed an optimization model for project resource allocation. We used AHP weighted values and optimization methods. Computer implementation for this model is provided based on GUI-Type objective-oriented programming for the users and provided displays of all the inputs and outputs in the form of GUI-Type. The results of this research will provide the project managers with efficient management tools.

  • PDF