Abstract

This study uses a hybrid estimation tool for effective cost data management of building projects, and develops a realistic cost estimation model. The method makes use of newly available information as the project progresses, and project cost and percentage progress are analyzed and used as inputs for the developed system. For model development, case-based reasoning (CBR) is proposed, as it enables complex nonlinear mapping. This study also investigates analytic hierarchy process (AHP) for weight generation and applies them to a real project case. Real case studies are used to demonstrate and validate the benefits of the proposed approach. By using this method, an evaluation of actual project performance can be developed that appropriately considers the natural variability of construction costs.

Keywords

References

  1. Chou JS, O'Connor JT. Internet-based preliminary highway construction cost estimating database. Automation in Construction. 2007 Dec;17(1):65-74. https://doi.org/10.1016/j.autcon.2007.03.001
  2. Barraza GA, Back WE, Mata F. Probabilistic monitoring of project performance using SS-curves. Journal of Construction Engineering and Management. 2000 March;126(2):142-48. https://doi.org/10.1061/(ASCE)0733-9364(2000)126:2(142)
  3. Blyth K, Kaka A. A novel multiple linear regression model for forecasting s-curves. Engineering. Construction and Architectural Management. 2006;13(1):82-95. https://doi.org/10.1108/09699980610646511
  4. Suhanic G. Cost control banana. 30th Annual meeting of the American Association of Cost Engineers (AACE). Chicago (IL):Morgantown, WV;1986. B.1.1-6.
  5. Tam CM, Fang CF. Comparative cost analysis of using high performance concrete in tall building construction by artificial neural networks. ACI Structural Journal. 1999 Nov;96(6):927-36.
  6. Hegazy T, Ayed A. Neural network model for parametric cost estimation of highway projects. Journal of Construction Engineering and Management. 1998 June;124(3):210-8. https://doi.org/10.1061/(ASCE)0733-9364(1998)124:3(210)
  7. Al-Tabtabai H, Alex AP, Tantash M. Preliminary cost estimation of highway construction using neural networks. Cost Engineering. 1999 Mar;41(3):19-24.
  8. Wilmot CG, Mei B. Neural network modeling of highway construction costs. Journal of Construction Engineering and Management. 2005 July;131(7):765-71. https://doi.org/10.1061/(ASCE)0733-9364(2005)131:7(765)
  9. Chao LC, Chien CF. Estimating project s-curves using polynomial function and neural networks. Journal of Construction Engineering and Management. 2009 Mar;135(3):169-77. https://doi.org/10.1061/(ASCE)0733-9364(2009)135:3(169)
  10. Boussabaine AH, Kaka AP. An artificial neural network for predicting duration of construction projects. International Journal of Construction Information Technology. 1996 ;4(1):35-45.
  11. Boussabaine AH, Kaka AP. A neural networks approach for cost flow forecasting. Construction Management and Economics. 1998 Oct;16(4):471-9. https://doi.org/10.1080/014461998372240
  12. Hegazy T, Ayed A. Developing practical neural network applications using back-propagation. Computer-Aided Civil and Infrastructure Engineering. 1998 March;9(2):145-59.
  13. Kolodner J. Case-based reasoning. 1st ed. San Mateo (CA): Morgan Kaufmann; 1993.
  14. Shin KS, Han I. Case-based reasoning supported by genetic algorithms for corporate bond rating. Expert System Application. 1999 Feb;30(7):495-509.
  15. Kim KJ, Kim KM. Preliminary cost estimation model using case-based reasoning and genetic algorithms. Journal of Computing in Civil Engineering. 2010 Nov;24(6):499-505. https://doi.org/10.1061/(ASCE)CP.1943-5487.0000054
  16. Rivard H, Fenves SJ, Gomez N. Case-based reasoning for conceptual building design, 1st International Conference on New Information Technologies for Decision Making in Civil Engineering; 1998 October; University of Quebec, Montreal, Quebec.
  17. Riesbeck CK, Schank RS. Inside case-based reasoning. 1st ed. NJ: Lawrence Erlbaum Associates; 1989.
  18. Yang J, Yau U. Applications of case-based reasoning in construction engineering and management. American Society of Civil Engineers; Proceedings of the 3rd Congress on Computing in Civil Engineering; 1996 July; Anaheim, California. NY: ASCE; 1996. 663-9.
  19. Ardit D, Tokdemir O. Comparison of case-based reasoning and artificial neural networks. Journal of Computing in Civil Engineering. 1999 July;13(3):162-9. https://doi.org/10.1061/(ASCE)0887-3801(1999)13:3(162)
  20. Aamodt A, Plaza E. Case-based reasoning: foundational issues, methodological variations, and system approaches. AI Communications. 1994;7(1):39-59.
  21. Saaty TL. Axiomatic foundation of the analytic hierarchy process. Management Science. 1986;32(7):841-55. https://doi.org/10.1287/mnsc.32.7.841
  22. Saaty TL. Concept, theory, and techniques: rank generation, preservation, and reversal in the analytic hierarchy decision process. Decision Science. 1987;18(2):157-77. https://doi.org/10.1111/j.1540-5915.1987.tb01514.x
  23. Saaty TL. How to make a decision: the analytic hierarchy process. European Journal of Operational Research. 1990;48(1):9-26. https://doi.org/10.1016/0377-2217(90)90057-I
  24. Dyer JS. Remarks on the analytic hierarchy process. Management Science. 1990;36(3):249-58. https://doi.org/10.1287/mnsc.36.3.249
  25. Dyer RF, Forman EH. Group decision support with the analytic hierarchy process. Decision Support Systems. 1992;8(2):99-124. https://doi.org/10.1016/0167-9236(92)90003-8
  26. Al-Harbi KMA. Application of the AHP in project management. International Journal of Project Management. 2007;19(1):19-27.
  27. Chwolka A, Raith MG. Group preference aggregation with the AHP-Implications for multiple-Issues agendas. European Journal of Operational Research. 2001 July;132(1):176-86. https://doi.org/10.1016/S0377-2217(00)00121-1
  28. An SH, Kim GH, Kang KI. A case-base reasoning cost estimating model using experience by analytic hierarchy process. Building and Environment. 2007 July;42(7):2573-9. https://doi.org/10.1016/j.buildenv.2006.06.007
  29. Podvezko V. Application of AHP Technique. Journal of Business Economics and Management. 2009 March;10(2):181-9. https://doi.org/10.3846/1611-1699.2009.10.181-189
  30. edineckiene M, Turskis Z, Zavadskas EK. Sustainable construction taking into account the building impact on the environment. Journal of Environmental Engineering and Landscape Management. 2010 October;18(2):118-27. https://doi.org/10.3846/jeelm.2010.14
  31. Zahedi F. The analytic hierarchy process-A survey of the method and its applications. Interface. 1986;16(4):96-108.
  32. Hacker PT, Vargas LG. The theory of ratio scale estimation: Saaty's analytic hierarchy process. Management Science. 1987 November;33(11):1383-403. https://doi.org/10.1287/mnsc.33.11.1383
  33. Chen WT, Chang PY, Chou K, Mortis LE. Developing a CBR-based adjudication system for fatal construction industry occupational accidents. Expert System with Applications. 2010 July;37(7):4867-80. https://doi.org/10.1016/j.eswa.2009.12.028
  34. Ostwald PF. Construction Cost Analysis and Estimating. 1st ed. NJ: Prentice-Hall, Inc; 2001.
  35. Kim GH, Kang KI. A study on a model for neural networks training using genetic algorithms for predicting cost estimates of apartment projects at the early project stage. Journal of Architectural Institute of Korea. 2003 October;19(10):133-42.
  36. Kim GH, Seo DS, Kang KI. Hybrid models of neural networks and genetic algorithms for predicting preliminary cost estimates. Journal of Computing in Civil Engineering. 2005 April;19(2):208-11. https://doi.org/10.1061/(ASCE)0887-3801(2005)19:2(208)
  37. Huang G. Cost modeling based on support vector regression for complex products during the early design phases [dissertation]. Virginia: Department of Industrial and Systems Engineering, Virginia Polytechnic Institute and State University; 2007. p. 29-34.
  38. Yau NJ, Yang JB. Applying case-based reasoning technique to retaining wall selection. Automation in Construction. 1998 September;7(7):271-83. https://doi.org/10.1016/S0926-5805(97)00072-1
  39. Koo CW, Hong TH, Hyun CT, Koo KJ. A CBR-based hybrid model for predicting a construction duration and cost based on project characteristics in multi-family housing projects. Canadian Journal of Civil Engineering. 2010 May;37(5):739-52. https://doi.org/10.1139/L10-007