• Title/Summary/Keyword: process risk

Search Result 2,872, Processing Time 0.032 seconds

Effective Customer Risk Management at the Nuclear Medicine Department: Risk Managemont MOT Development Application and Producing Public Relations Film (핵의학과 내에서의 효과적인 고객위험관리: 위험관리 응대 MOT 개발적용 및 홍보동영상 제작)

  • Ham, Jong-Hum;Hwang, Jae-Bong;Kim, Joon-Ho;Lee, Gui-Won
    • The Korean Journal of Nuclear Medicine Technology
    • /
    • v.13 no.3
    • /
    • pp.110-122
    • /
    • 2009
  • Purpose: Nowadays, A medical institution assesment could get more interest about a quality of medical services from many hospitals that developed the active activities for improving medical services. Also, there is an other additional issue which is the patients risk management. Uijeongbu ST. Mary's hospital Nuclear Medicine department has been changed many work process after PET-CT introduction and renovation of its place since 2008. Therefore, modified structure and the way of existing work process have contained risk factors. The purpose of this study would be the appropriate risk management process while imaging examination process, the removal risk factors and improved activities through the analysis risk factors. Materials and Methods: Nuclear Medicine department new process should analysis through many-sided, Firstly, make and trained risk management manual after then apply an actual work. Result analysis showed the number of risk accident occurrence that comparing the last year and after the improved activities. Secondly, producing risk management public relations film has been showed an applicable patient after then the customer service measurement checked for a hundred patient by questionnaire. Lastly, Risk factors were eliminated through the facilities participation improving activities which could change for the better risk factors. Results: The number of safety accident occurrence(medication error, fall and collision) were checked as zero after the improving activities both PET-CT and gamma camera examination. The results of questionnaire showed as follows; 74% marked as understanding of the test process and 81% checked "satisfaction" after the public relations film showing. The question "Did you consider about the risk factors?", both PET-CT and gamma camera checked as 94% and 89% respectively. Customer risk management could be accomplished effectively through the improving activities at the nuclear medicine department. Conclusions: The study would be an opportunity that spread risk factors were systematically showed and analyzied. Also, It showed the possibility of the minimized safety accident and its feedback, if application of the response manuel that could be a standard of radiology technician's work method to react safety accident. It was the more effective that visual material could be easy to approach as a methodology of risk factors. As far as I have concerned that It could help the safety and convenience through continuous and detailed activities that offer to patients.

  • PDF

On the Risk Management System in Construction Industries (건설 분야 리스크 경영 시스템 구축)

  • 김종걸;박용수
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.05a
    • /
    • pp.277-281
    • /
    • 2004
  • The establishment and application of risk management system is one of the current issues in world-wide leading companies. Poor risk management might bring large-scale accident in construction industry by its features(large scale, diversity). Standardization system and standard for risk should be managed timely. In this paper, we do comparative analysis of standardization systems and standards concerned on risk, so thus present basic data for safety reinforcement and risk zero in the construction life cycle process.

  • PDF

Risk Management Qualitatively on Railway Signal System

  • Zhang, Ya-Dong;Guo, Jin
    • International Journal of Railway
    • /
    • v.2 no.3
    • /
    • pp.113-117
    • /
    • 2009
  • Risk management is an important part of system assurance and it is widely used in safety-related system. Railway signal system is one kind of safety-related system and its most important goal is to guarantee the safety of railway system. The method based on risk management can find and solve the security issues of railway signal system more effectively. This paper introduces the basic conception of risk management, studies the whole process of risk management and related tools and techniques and discusses some key points qualitatively combining with the particularity of railway signal system.

  • PDF

A Study on the Risk Identification Methods for Initial and Mass Production Stage of Military Products Using FMEA (FMEA를 활용한 군수품 초도 생산 및 양산 단계의 위험 식별 방안 연구)

  • Lee, Chang Hee;Yang, Kyung Woo;Park, Du Il;Lee, Il Lang;Kwon, Jun Sig;Choe, Il Hong;Kim, Sang Boo
    • Journal of Korean Society for Quality Management
    • /
    • v.42 no.3
    • /
    • pp.311-324
    • /
    • 2014
  • Purpose: It can deduce improvement plan that recognizes any risk factors in initial production and mass production by using FMEA and through this process, the appropriate criteria for defence items can be established. Methods: It proposes two methodology - Apply DT/OT data achieved from the beginning mass production stage based on FMECA data of the design stage, to risk management, and risk management plan that reflected line and field faliure data in case of is offered. Results: It proposes the risk management plan through Bayesian method and the risk identification that considered MTTF estimated value in case of initial production process. In case of mass production process, both risk identification by using fault occurrence frequency scores and Byaesian method, In case of the Initial production and mass production, it proposes use both two methods. Conclusion: A more realistic risk identification method can be applied, and by this method the quality improvement effect is expected.

An Exploratory Study on Risk Factor in Supply Chain (공급사슬상의 리스크 요인에 관한 탐색적 연구)

  • Shin Chang-Hoon;Jeaung Dong-Hun;Choi Min-Seung
    • Journal of Navigation and Port Research
    • /
    • v.30 no.1 s.107
    • /
    • pp.67-71
    • /
    • 2006
  • This study gathered the factors of supply chain risk through literature review, and measured the importance of risk factors recognized by domestic companies. The purpose and necessity of this study are as follows. First, supply risk factors were classified and explored through empirical studies about supply chain risk. Most of the previous studies concentrated on the meaning of supply chain risk, but only in terms of concept approach Second, to evaluate the importance of supply-chain risk recognized by the companies, AHP(Analytic Hierarchy Process} method was proposed in this paper. Finally, this study suggests implications for companies' efficient supply activity by measuring the importance of supply-chain through AHP(Analytic Hierarchy Process).

Risk Assessment of Agricultural Construction Works using Accident Analysis and Analytic Hierarchy Process (재해분석을 통한 농업토목공사의 공종별 위험성 평가)

  • Yang, Young Jin;Oh, Sue Hoon;Noh, Jae Kyoung
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.60 no.4
    • /
    • pp.15-25
    • /
    • 2018
  • The accident risk at the construction workplace associated with agricultural engineering is comparatively higher than those of other fields due mainly to its complex work types and processes. Agricultural engineering deals with a variety of agricultural infrastructures from irrigation and drainage facilities to giant-scale coastal reclamation land infrastructures. The characteristics that most agricultural projects have conducted on a small-scale even worsen the situation drawing low attentions to risk management. Therefore, systematical risk assessment that focuses on details of agricultural construction work process is required in order to enhance safety management capacity and to prevent repetitive accidents ultimately. This study aims to categorize construction work types and processes of agricultural construction works, and to quantitatively assess the accident risk of them based on accident analysis. Regarding classification of construction works, actual 827 accident cases were thoroughly reviewed and coded by their construction site, facility and work type, project scale and so on. Most accidents (71.8 % of total cases) occurred in small-scale construction workplaces with less than 5 billion Korean won project budget. And those accidents related to agricultural infrastructure project (37.4%) and agricultural water development project (22.4%). In terms of work types, accidents frequently took place in form-work followed by pipe installation work, steel bar work and concrete work. The potential risks were compared with actual outbreak of accidents based on Analytic Hierarchy Process (AHP). The results show that the potential conditions of accident expected to be took place is somewhat different from the actual conditions where accidents actually happened. This implicates that risk management manuals or education needs to be adjusted by reflecting unexpected circumstances. Overall, this study is meaningful in that the results could be foundations as to strengthen risk management capacity for agricultural engineering projects.

The Development of Schedule Risk Management Tools at the Preconstruction Phase in Building Construction - Focused on the Steel Work - (건축공사 착공 전 단계의 공정리스크 관리도구 개발 - 철골공사 중심으로 -)

  • Suh Sang-Wook;Yoon You-Sang;Kim Sun-Kook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.1 s.23
    • /
    • pp.177-185
    • /
    • 2005
  • The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.

Risk Assessment of Submerged Floating Tunnels based on Fuzzy AHP (퍼지 AHP를 이용한 수중터널의 재해위험도 분석)

  • Han, Sang-Hun
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.13 no.7
    • /
    • pp.3244-3251
    • /
    • 2012
  • In the construction and operation of large marine structure, hazard risk analysis is one of important factors. Therefore, this paper investigates the hazard risk indexes and evaluates the risk level in the construction and operation of SFT on the basis of expert survey and Fuzzy analytic hierarchy process. Hazard risk is divided into natural hazard risk (earthquake, typhoon, tsunami, and ice collision) and human factor hazard risk (fire, explosion, traffic accident, ship or submarine collision). Also, the influence of hazard risk indexes on SFT was evaluated in tunnel tube, supporting system, ventilation tower, foundation, and connection part. As the hazard risk level of SFT is compared with those of bridge, underwater tunnel, and immersed tunnel, the intrinsic risk level of SFT was evaluated. Tsunami and earthquake had higher risk level in natural hazard risk, and the risk levels of fire and explosion were higher in human factor hazard risk. Hazard risk level of SFT was 1.4 times higher than immersed tunnel, and 3.2 times higher than bridge.

Decision-making system for the resource forecasting and risk management using regression algorithms (회귀알고리즘을 이용한 자원예측 및 위험관리를 위한 의사결정 시스템)

  • Han, Hyung-Chul;Jung, Jae-Hun;Kim, Sin-Ryeong;Kim, Young-Gon
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.15 no.6
    • /
    • pp.311-319
    • /
    • 2015
  • In this paper, in order to increase the production efficiency of the industrial plant, and predicts the resources of the manufacturing process, we have proposed a decision-making system for resource implementing the risk management effectively forecasting and risk management. A variety of information that occurs at each step efficiently difficult the creation of detailed process steps in the scenario you want to manage, is a frequent condition change of manufacturing facilities for the production of various products even within the same process. The data that is not contiguous products production cycle also not constant occurs, there is a problem that needs to check the variation in the small amount of data. In order to solve these problems, data centralized manufacturing processes, process resource prediction, risk prediction, through a process current status monitoring, must allow action immediately when a problem occurs. In this paper, the range of change in the design drawing, resource prediction, a process completion date using a regression algorithm to derive the formula, classification tree technique was proposed decision system in three stages through the boundary value analysis.

The Risk Assessment Effects of SCM and the Strategy of Risk Management on Supply Chain Performance (공급사슬 위험평가 및 위험관리전략이 공급사슬 운영성과에 미치는 영향)

  • Kim, Dong Jeong;Lee, Young Jai
    • Journal of Information Technology Applications and Management
    • /
    • v.21 no.4
    • /
    • pp.173-186
    • /
    • 2014
  • This study outlines possible risk factors in the SCM of a company and correlates risk assessment, the strategy of risk management, and the supply chain performance. The data is surveyed from an international Korean company and is analyzed by the structure equation model of actual proof. The research model verifies the correlation between the risk assessment, the strategy of risk management, and the supply chain performance as dependent variables after the risk factors of the SCM are defined as independent variables. The research shows that there are consecutive links among the risk factors of the SCM, the risk assessment, and the strategy of risk management. The strategy of risk management was conclusively determined to have an effect on supply chain performance. Therefore, improving the supply chain performance of a company requires the constructive process for risk management based on a correlation between risk assessment and the strategy of risk management.