The purpose of this study is to develop a supporting tool for efficient management, at preconstruction phase, of the schedule risk that is able to generate at construction phase. The main contents of this study to develop a practical tool are as follows. First steel work was selected as a relevant trade and a risk breakdown structure focused on the process of steel work having large effect on total construction process was made. Secondly, the work flow considering schedule risk factor was made and schedule risks that must be managed preferentially through analyzing the grade of importance for risk was selected. Finally, based on above two procedure, the management form for schedule risk was developed It is necessary to accumulate abundant data for schedule risk for other construction process and to develop a manual and a schedule risk management system.
건축공사에서의 리스크 관리자들은 전체 공기에 영향을 미치는 공정리스크 관리에 대한 중요성에 대해 공감하고 있지만 그 에 대한관리 절차 및 도구 등이 체계화되어 있지 않아 공정관리에 어려움을 겪고 있다. 또한 기존의 리스크 관련 연구에서의 리스크 분류체계는 현장업무 중심으로 이루어지지 않아 실용화되기에 한계가 있다. 따라서 본 연구에서는 전체 공정에 많은 영향을 미치는 철골공사를 대상으로 공사 프로세스 중심의 리스크 분류체계와 주요 공정 리스크 요인과 연계한 업무 플로우를 제시하였고, 공정리스크 관리업무의 효율성을 제고하기 위해 공정리스크 중요도를 분석하였으며, 이를 기반으로 공정 리스크 요인별 대응방안 및 세부대책으로 이루어진 공정 리스크 관리 도구를 개발하였다.