Korea Electric Power Research Institute has being carried out an IEC 61580 based communication service test on domestic IED trial products developed related to power IT project. This paper describes IEC 61850-10 conformance test and testing items established by UCA international Users Group and this study is on the analysis of testing results from IED communication service with selected testing blocks, which consist of Basic association, Dataset, Reporting and GOOSE.
Korea Electric Power Research Institute has carried out verification of communication conformance on IEC 61850 based IEDs related to power IT project "Development of Prototype for Advanced Substation Automation System based on the Digital Control Technology". Owing to IEC 61850 international standard and digital substation automation system, IED testing process should be changed from the conventional way to the new way described in the paper. This paper describes IED testing procedures based on substation automation system using UML.
Kim, Dae-Won;Suh, Yoon-Taek;Yoon, Hak-Dong;Jung, Hee-Jae;Kim, Maeng-Hyun
Proceedings of the KIEE Conference
/
2003.07a
/
pp.543-545
/
2003
한류형 전력퓨즈는 계통의 단락사고로 고장 전류가 흐를 때 퓨즈내부에서 발생하는 저항에 의해 고장전류를 회로 고유의 단락전류보다 아주 적은 값으로 제한하고 최소 시간내에 차단하여 회로를 보호하므로 계통기기의 단락용량를 최소한으로 감소시킬 수 있다. 본 논문에서는 이러한 한류형 전력퓨즈의 단락전류 차단성능 평가를 위해 동작책무에 따른 차단성능을 규명하고자 단락발전기를 사용하여 단락전류차단시험을 실시하고 그 결과를 제시하였으며, 또한 차단과정에 따른 스트레스들이 단락시험 시 차단성능에 미치는 영향을 다루고 있다.
Transactions of the Korean Society of Pressure Vessels and Piping
/
v.9
no.1
/
pp.40-47
/
2013
The capacity factor of nuclear power plant in Korea is the highest level in the world. However, the integrity assessment of nuclear power plant is depended on foreign country. Especially, most eddy current testing systems for inspecting steam generators in nuclear power plant are currently imported from USA, Canada, and so on. Therefore, the eddy current testing system can react more active and adaptive from economic and managerial standpoint for actual nuclear power plants in Korea is required. In this paper, an eddy current testing system for inspecting steam generators in nuclear power plants is introduced. Frequency generator, analog circuit, analog digital converter circuit, and digital control circuit are composed in eddy current testing system. A benchmarking of acquisition system and acquisition software, eddynet 11i made by Zetec, and modifications are carried out based on the test environment of Korea nuclear power plants. Finally, all eddy current apparatus are integrated to inspect steam generator tubes in nuclear power plants.
This paper proposes a prototype IED hardware design and it's real-time experimental results. To evaluate performance of the IED, the study is well constructed power system model including power transformer utilizing the EMTP software and the testing is made through simulation of various cases. The relaying that is well constructed using DSP chip and RISC CPU etc. has been developed and the prototype IED has been verified through on-line testing by LabVIEW simulator. The results show that an advanced relaying based prototype IED never mis-operated.
The installed capacity of wind turbines in KOREA are growing and enlarging by the central government's support program. Thus, the importance of power performance verification and its uncertainty analysis are recognizing rapidly. This paper described the Power testing results of a 1.5MW wind turbine and analysed an uncertainty level of measurements. The measured power curves are very closely coincide with the calculated one and the annual power production under the given Rayleigh wind speed distribution are estimated with the $4.7{\sim}22.0%$ of uncertainty but, in the dominant wind speed region as $7{\sim}8m/s$, the uncertainty are stably decreased to $7{\sim}8%$.
In Korea Electric Power Corporation (or KEPCO), several Demand-Side Management (or DSM) program have been carried out to effectively meet electric power demand at least costs by modifying customers electricity use patterns. As one of them, KEPCO applies low-priced night thermal-storage power service for heat appliances to facilitate efficient use of power facilities by shifting relatively high daytime demands to night hours to build loads during the off-peak periods. In the market of heat-storage type water-heater, electric water-heater has been mostly used, but it has low energy efficiency and needs high capacity electric equipments. So in order to replace these electric water heaters, 15 HP air-source heat pump water heater is developed in Korea Electric Research Institute (or KEPRI). This paper shows that measurement system for performance testing of heat pump water heater is established and heating capacity and performance is analyzed and measured for out-door environmental change.
The installed capacity of wind turbines in KOREA are growing and enlarging by the central government's support program. Thus, the importance of power performance verification and its uncertainty analysis are recognizing rapidly. This paper described the power testing results of a 3MW wind turbine and analysed an uncertainty level of measurements. The measured power curves are very closely coincide with the calculated one and the annual power production under the given Rayleigh wind speed distribution are estimated with the 3.6~12.7% of uncertainty but, in the dominant wind speed region as 7~8m/s, the uncertainty are stably decreased to 6.3~5.3%.
Kim, Young-Sung;Rim, Seong-Jeong;Seo, Woohyun;Jung, Jeong-Il
The Transactions of The Korean Institute of Electrical Engineers
/
v.64
no.1
/
pp.196-200
/
2015
The switching noise in the power electronics of the power conversion equipment (Power Conditioning System) for large energy storage devices are generated. Since the burst-level transient noise from being generated in the power system at a higher power change process influences the control circuit of the low voltage driver circuit. Noise may cause the malfunction of the control device even if no dielectric breakdown leads to a control circuit. To overcome this, this paper proposes the installation of an additional nano-surge protection device on the power supply DC output circuit of the battery management unit.
Solar energy is one of the renewable energy sources. It can respond to expanding energy demand. A solar cell module is designed to have a durability that can be developed over a long period of 25 years to be installed outdoors and perform like a stable power supply. We need Standard Test Condition (STC)-based power output data before and after testing to measure the power output of existing modules. The modules are shown to reduce power output by comparing data before and after outdoor experiments regardless of whether they are indoor or outdoor. It is easy to compare the power output quantities through the module simulator in the indoor. However, it takes a lot of testing time and costs to compare the power output on outdoor in the case of a high number of modules and distance from the module simulator. It can save time and costs if we can check the power output using the data in outdoor. We have used the long-term outdoor test to find the elements out that corresponds to the reductions in power output quantities. We have conducted research that matched the actual and the tests.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.