• Title/Summary/Keyword: planning phase

Search Result 746, Processing Time 0.029 seconds

Development of framework to estimate environmental loads of PSC beam bridges based on LCA

  • Lee, Wan Ryul;Kim, Kyong Ju;Yun, Won Gun;Kim, In Kyum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.730-731
    • /
    • 2015
  • This study aims at giving the framework to estimate the environmental load at planning and schematic phase. With increasing awareness of environmental issues, the effort to reduce the environmental impacts caused by human activity has been increasingly enlarged. So far most of researches estimating CO2 emissions have analyzed energy consumption based on BOQ (Bills of Quantity) acquired after detailed design. There is also lack of reliability in the estimated environmental impact using the basic unit of a facility at the planning stage, because it uses a limited specific section of historical data. Thus, this study is targeted at developing framework to assess reliable environmental loads based on information available at project early phases by making case-bases from historical design information on PSC Beam Bridge. Historical database is built on the basis of the LCA (Life Cycle Assessment) and in order to set input information for estimating model, the literature about information in an early project phase are reviewed. Using the information available in the planning and schematic design stage, the Framework is presented to estimate the environmental load in an early stage in the project. Developing an environmental load estimation model in accordance with the Framework presented in this study, it is expected that the environmental load in the initial project phase can be estimated more quickly and accurately.

  • PDF

R&D Project Selection Models in the Public Sector (중점연구개발과제 도출을 위한 기술기획 모델-공공부문의 정보통신기술개발계획을 중심으로-)

  • 임명환
    • Journal of Technology Innovation
    • /
    • v.5 no.1
    • /
    • pp.266-287
    • /
    • 1997
  • The purpose of this paper is to purpose methods and procedures by which we can set up technology planning scheme essential for R'||'&'||'D(or technology) planning in public sector (governmental and government-sponsored institutions), and can develop and select "main R'||'&'||'D projects" which are crucial to R'||'&'||'D planning, were quite specifically discussed in case of I'||'&'||'T(Information '||'&'||' Telecommunications) sector, so that they may not remain theoretical but may be practically applicable to real R'||'&'||'D programs. In this paper, the concept of technology planning was defined as a procedure for establishing nominal planning to acquire technologies efficiently for a specific sector. More detailed definition optimal technology-acquisition strategy, i.e., analyzing technological development '||'&'||' environ-ment, establishing R'||'&'||'D objectives as promising technology opportunities, selecting main R'||'&'||'D projects, allocating resources and so on."The"main R'||'&'||'D projects by technology sectors and by planning phases and then deciding on priority. Scoring method was rsed in assessment phase. Summing up, this paper suggested technology planning scheme of methods and procedures for sorting out required technologies, developing and assessing public R'||'&'||'D projects, and finally selecting main R'||'&'||'D projects.

  • PDF

Change in Western Pacific Tropical Cyclone Activity by Western North Pacific Teleconnection Pattern (북서태평양 원격패턴에 의한 북서태평양 태풍활동에서의 변화)

  • Choi, Jae-Won;Kim, Jeoung-Yun;Lee, Seung-Wook
    • Journal of Environmental Science International
    • /
    • v.24 no.11
    • /
    • pp.1371-1384
    • /
    • 2015
  • This study analyzes the characteristics of Western North Pacific (WNP) tropical cyclone (TC) activity and large-scale environments according to the Western Pacific (WP) teleconnection pattern in summer. In the positive WP phase, an anomalous cyclone and an anomalous anticyclone develop in the low and middle latitudes of the East Asia, respectively. As a result, southeasterlies are reinforced in the northeast area of the East Asia including Korea and Japan which facilitates the movement of TC to this area, whereas northwesterlies are reinforced in the southwest area of the East Asia including South China and Indochina Peninsula which blocks the movement of TC to this area. Due to the spatial distribution of this reinforced pressure system, TCs develop, move, and turn more to the northeast of WNP than those in the negative WP phase. Consequently, the characteristics of this TC activity in the positive WP phase are associated with the location of upper tropospheric jet further to the northeast. Meanwhile, TCs in the negative WP phase mainly move to the west from Philippines toward south China and Indochina Peninsula. Furthermore, due to the terrain effect caused by the high passage frequency of TCs in the mainland China, the intensity of TCs are weaker than those in the positive WP phase.

A method of minimum-time trajectory planning ensuring collision-free motion for two robot arms

  • Lee, Jihong;Bien, Zeungnam
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1990.10b
    • /
    • pp.990-995
    • /
    • 1990
  • A minimum-time trajectory planning for two robot arms with designated paths and coordination is proposed. The problem considered in this paper is a subproblem of hierarchically decomposed trajectory planning approach for multiple robots : i) path planning, ii) coordination planning, iii) velocity planning. In coordination planning stage, coordination space, a specific form of configuration space, is constructed to determine collision region and collision-free region, and a collision-free coordination curve (CFCC) passing collision-free region is selected. In velocity planning stage, normal dynamic equations of the robots, described by joint angles, velocities and accelerations, are converted into simpler forms which are described by traveling distance along collision-free coordination curve. By utilizing maximum allowable torques and joint velocity limits, admissible range of velocity and acceleration along CFCC is derived, and a minimum-time velocity planning is calculated in phase plane. Also the planning algorithm itself is converted to simple numerical iterative calculation form based on the concept of neural optimization network, which gives a feasible approximate solution to this planning problem. To show the usefulness of proposed method, an example of trajectory planning for 2 SCARA type robots in common workspace is illustrated.

  • PDF

A Case Study on Value Improvement through applying VE Method in Stage of Railway Construction (시공 VE기법을 적용한 철도구조물의 가치향상 사례 연구)

  • Cho, Ki-Yon;Park, Mi-Yun;Kim, Sung-Hun;Seo, Jong-Won
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.23-29
    • /
    • 2008
  • Most VE operation related to construction project is progressed in stage of planing or design phase, especially in case of domestic. It is encouraging fact and if you have VE process in stage of planning and design, you'll have experience a reduction of about 70% of total saving cost in which total construction process may occurred. However, recently the work of construction in overseas increase and almost is only construction-work, except planning and design process. As this reason, VE process for construction-work phase only is demanded in high necessity. VE in construction phase comes to accomplish intensively in the part which the design change does not follow, through know-how, equipment operating method and method of temporary-structure erection at the established construction-site learned, builders will be the possibility of reduction from 3% to 10% in constructive expense. This paper describes VE performing example in OO company's construction-work phase, and propose the methodology of VE performance in the phase of construction. And also it is aimed to extending VE applications into the overseas construction enterprise.

  • PDF

Automated Composition of Semantic Web Services Based on Reactive Planning (반응형 계획에 기초한 자동화된 시맨틱 웹서비스의 조합)

  • Jin, Hoon;Kim, In-Cheol
    • The KIPS Transactions:PartB
    • /
    • v.14B no.3 s.113
    • /
    • pp.199-214
    • /
    • 2007
  • Recently, there have been a lot of works trying to realize automated composition of semantic web services though application of AI planning techniques. The traditional AI planning techniques, however, have some limitations: it is not easy to represent a web service process with complex control constructs as an action or a plan; it is hardly possible to consider enough the rich information contained in domain ontologies during the planning process; it is impossible to model directly the data flow from the outputs of a web service to the inputs of another web service; it is difficult to predict and deal with uncertainty and dynamics of the environment because the plan generation phase is supposed to be separated from the plan execution phase. In order to overcome some of these limitations, this paper suggests a reactive planning approach to automated composition of semantic web services. Through some experiments using several e-commerce web services, we found that the reactive planning is an effective way to realize automated composition of semantic web services.

Multi-dimensional Quality Model for Value Engineering in Planning Phase of Public Construction Program (공공 건설 프로그램의 기획단계 VE를 위한 다차원 품질모델)

  • Hyun, Chang-Taek;Kim, Jong-Hyeob;Son, Myung-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.6
    • /
    • pp.61-69
    • /
    • 2013
  • In the mixed-use development program, several conflicts occur due to the characteristics of construction program, such as large-scale, variety of stakeholders, long periods of time, etc. In particular, since the characteristics of the construction program having various complex projects lead to different requirements depending on stakeholders, it is crucial to plan the appropriate type and size of facilities. Therefore, it is necessary to derive solutions suitable for the needs of owner by conducting VE in the planning phase. In this study, a multi-dimensional quality model is developed to present proper facilities necessary for the construction program by clearly identifying the owner's requirements in performing VE in the planning phase. Through the development of the multi-dimensional quality model, the characteristics distribution of 15 major facilities by 12 performance indicators for mixed-use development programs is presented. The deduction method of appropriate facilities based on the requirements of owner and the multi-dimensional synthesis method among the performance indicators are also suggested. This study is significant as a basic research for the application of VE in the planning phase of construction program. It is expected that the multi-dimensional quality model proposed in this study could facilitate presentation and review of appropriate facilities based on the analysis of requirements of various stakeholders in the early stage of the construction program.

Orbit Determination and Maneuver Planning for the KOMPSAT Spacecraft in Launch and Early Orbit Phase Operation

  • Lee, Byung-sun;Lee, Jeong-Sook;Won, Chang-Hee;Eun, Jong-Won;Lee, Ho-Jin
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1999.10a
    • /
    • pp.29-32
    • /
    • 1999
  • Korea Multi-Purpose SATellite(KOMPSAT) is scheduled to be launched by TAURUS launch vehicle in November, 1999. Tracking, Telemetry and Command(TT&C) operation and the flight dynamics support should be performed for the successful Launch and Early Orbit Phase(LEOP) operation. After the first contact of the KOMPSAT spacecraft, initial orbit determination using ground based tracking data should be performed for the acquisition of the orbit. Although the KOMPSAT is planned to be directly inserted into the Sun- synchronous orbit of 685 km altitude, the orbit maneuvers are required fur the correction of the launch vehicle dispersion. Flight dynamics support such as orbit determination and maneuver planning will be performed by using KOMPSAT Mission Analysis and Planning Subsystem(MAPS) in KOMPSAT Mission Control Element(MCE). The KOMPSAT MAPS have been jointly developed by Electronics and Telecommunications Research Institute(ETRI) and Hyundai Space & Aircraft Company(HYSA). The KOMPSAT MCE was installed in Korea Aerospace Research Institute(KARI) site for the KOMPSAT operation. In this paper, the orbit determination and maneuver planning are introduced and simulated for the KOMPSAT spacecraft in LEOP operation. Initial orbit determination using short arc tracking data and definitive orbit determination using multiple passes tracking data are performed. Orbit maneuvers for the altitude correction and inclination correction are planned for achieving the final mission orbit of the KOMPSAT.

  • PDF

Technical Papers : Implementaion of KSR-3 Range Safety System (기술논문 : KSR-Ⅲ 비행안전 시스템 구현)

  • Kim,Ju-Nyeon;Go,Jeong-Hwan;Lee,Jae-Deuk;Park,Jeong-Ju
    • Journal of the Korean Society for Aeronautical & Space Sciences
    • /
    • v.30 no.1
    • /
    • pp.147-154
    • /
    • 2002
  • This paper describes the devlopment and implementation for the KOMPSAT-1 scheduling & automatic command plan generator(KSCG). Some problems in mission planning and command planning had occurred using the mission & command planning s/w in MAPS(Missin Analysis and Planning Subsystem) during the LEOP(Launch & Early Orbit Phase) & early normal mission phase due to lots of manual input process and non-automatic process. Therefore, the more mission operations for KOMPSAT-1. In order to prevent the development of new one(KSCG) which should reduce the manual process and generate automatically the command plan has been needed. As a result, the mission operations of KOMPSAT-1 has greatly became stable and more effient.

A Study on the Variation Process of Commercial Gentrification Phase in Residential Area in Seoul - Focused on Business Type of Commercial Characteristics - (서울시 주거지역 내 상업 젠트리피케이션의 단계별 변이과정 분석 연구 - 상업 업종의 변화를 중심으로 -)

  • Ryu, Hwa-Yeon;Park, Jin-a
    • Journal of Korea Planning Association
    • /
    • v.54 no.1
    • /
    • pp.40-51
    • /
    • 2019
  • The ultimate aim of this study is to diagnose the process stage and look at the step change of transition process to see how the step changes. Therefore, in this study, cluster analysis was conducted by examining four types of commercial characteristics such as Retail Homogeneity, Share of Neighbourhood store, Share of chain store, and Share of cafe & Western food store. Through the cluster analysis, three types have been identified. Type1 is the first step which can explain the time before gentrification occurs and when the ratio of neighborhood facilities is the highest. Type2 is the second step that can explain boutique stage where the gentrification occurs. At this time, the ratio of Cafes & Western food restaurant increased and the proportion of neighborhood shops decreased. And Type3, third step is when the mature gentrification occurs. In the analysis of the transition period, it is necessary to monitor the change of the industry in the period from the first stage to the second stage. In the transition period from the second stage to the third stage, It is necessary to constantly monitor such factors as the increase of shops.