A Basic Analysis of the Management Factors the Application of Modular Construction Method in Buildings (건축물 모듈러 공법 적용을 위한 단계별 관리요인 기초적 분석)

  • Kim, Sung-Eun;Lee, Shin-Ja;Lim, Hyoung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.373-374
    • /
    • 2023
  • Modular construction is a cost-effective and time-saving method of building that involves prefabricating modules in a factory and assembling them on-site. However, effective management factors must be considered at each stage of the process to ensure quality and stability. This study analyzes these management factors and proposes systematic ways to manage them, including construction planning, data management, and quality assurance. Proper management can improve construction quality, shorten construction time, and reduce costs. These stage-specific management factors are crucial for the success of modular construction projects, and further research and efforts are needed to promote its widespread use in the construction market.

  • PDF

Application of BLE-based Beacon in Modular Construction Process (BLE 기술 기반 비콘을 활용한 모듈러 건축 현장 프로세스 제안)

  • Kim, Changjae;Kang, Namwoo;Kwon, Woobin;Kim, Harim;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.36-37
    • /
    • 2021
  • OSC(Off-Site Construction) is regarded as a faster and more economical method in the construction industry, and the attention towards the OSC is growing. In the modular construction process, which is one type of OSC, accurate identification of a module is essential. Because the installation position and the MEP(Mechanical, Electrical, and Plumbing) composition are distinct between modules, a defect in the finishing or junction area is likely to happen during the construction process. This study suggested the modular construction process by applying a beacon receiver using BLE(Bluetooth Low Energy) technology on each module. Construction quality management would be improved using the location and assembly data, particularly for a different module in modular construction.

  • PDF

Development of a Korean Modular Housing Construction Scenario (한국형 모듈러 주택 시공의 시나리오 개발)

  • Kim, Kyoon-Tai;Kim, Chang-Han;Lee, Du-Heon;Lee, Young-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05b
    • /
    • pp.81-83
    • /
    • 2011
  • A modular house is a house that is assembled on-site from modularized units. As such units are manufactured in a factory, the construction period is reduced, resources are recycled, and quality is improved. However, the construction technique applied to conventional modular houses has not overcome certain structural restrictions, as it is currently used to build houses less than 4 stories in height, which means that it lacks economic feasibility. For this reason, this research aims to develop a scenario of a construction method for Korean modular housing that can be applied to urban-type housing higher than 12 stories. This research is expected to provide fundamental data necessary for the future development of a construction method for Korean modular housing.

  • PDF

Risk Analysis of Lifting Work for Risk Assessment of Modular Construction (모듈러 건축 현장의 위험성평가를 위한 양중작업 위험요소 분석)

  • Jun, Young-HUN;Kim, Kyoon-Tai;Jeon, Eun-Bi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.291-292
    • /
    • 2021
  • In modular construction, it is insufficient for safety management of workers, and workers are still exposed to the risk of accidents due to work at high places for lifting and assembly work in modular construction sites. Therefore, it is necessary when preventive safety management through risk management of workers on modular construction sites. This study is a basic study for the risk assessment(checklist) of modular construction, and the purpose of this study is to analyze the risk factors of the module lifting work at the modular construction site. It is intended to identify the hazard risk factors and improvement measures of the existing lifting operation, by analyzing the case of the risk assessment of the existing RC method, and to identify the risk factors for each work process when lifting the module. In the future, the results of this study are expected to be utilized in the development of checklists for risk assessment as safety management plan for modular construction sites.

  • PDF

A Study on the Proposal of Passive Precast Concrete Modular Housing Development Plan in the Middle East such as Saudi Arabia (사우디 등 중동지역의 패시브형 PC모듈러 주택개발 방안 제안)

  • Lim, Seok-Ho;Chung, Joon-Soo;Yang, Hyeon-Jeong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.121-122
    • /
    • 2023
  • Existing modular research has been mainly focused on S (shelter structure) and I (infill interior finishing material), and considerable research has been conducted, and the results are being proposed. However, in the case of the rest (exterior materials and windows, etc.), existing construction methods and materials are borrowed, and supporting hardware members and insulation materials are constructed on site, which acts as a factor hindering overall shortening of the construction period. That is, since the advantages and characteristics of modularity cannot be utilized in the absence of modular cladding, manufacturing of cladding is required. Therefore, it is necessary to develop a cladding system that can drastically reduce the construction period in factories while considering the structural characteristics of PC modulars.

  • PDF

Classification problems of the unit modular housing through reviewing design drawings (도면검토를 통한 유닛 모듈러 주택의 문제점 유형분류)

  • Lee, Yu-ri;Kim, Kyoon-tai;Park, Nam-cheon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.160-161
    • /
    • 2014
  • This paper describes the classification problems of the unit modular housing through reviewing design drawings. Modular construction is a new industrialized homebuilding technology that uses large, factory produced modules. In general, more than 70% of construction processes in unit modular construction method are produced in factory after that the modular, which is completed is lifted on site and assembled. This research considers categorization in which the design drawing of the unit module housing can have problems. There are 17 types of construction method and 14 types of design approach as a result of the classification.

  • PDF

A Study on the Unit Modular System Process Application Plan (모듈러공법의 국내 적용 활성화 방안에 대한 연구)

  • Kim, Do-Min;Lim, Jae-Bok;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.113-114
    • /
    • 2012
  • The productivity of the construction industry is lower than other industries. Modular system is suggested to enhance the productivity of the construction industry. Modular system is a construction method which installs units manufactured in factory on site. It enables to reduce the duration and improve the quality of the constructions. However, the construction technique applied to modular system has not overcome certain structural problems. To solve the problems and motivate the application of modular system, this study propose the hybrid system which use core to resist a lateral force.

  • PDF

Development of manual framework for unit modular construction method (유닛모듈러 공법의 시공매뉴얼 체계 개발)

  • Kim, Kyoon-tai;Kim, Tae-Yeong;Jun, Young-Hun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.198-199
    • /
    • 2015
  • In Korea, it raised the need of the specification of unit modular construction, because there are no standard or manual. And it is urgent that the specification of unit modular construction is needed to develop in the domestic. Therefore, this study aims to propose the manual framework of the construction method. In the future, this framework will be based on the development of the manual on the unit modular construction method.

  • PDF

Development of Simulation Model for Optimization of Modular Construction Transportation Plan (모듈러 건설의 운송계획 최적화를 위한 시뮬레이션 모델 개발)

  • Kim, Hyeonmin;Kwon, Woobin;Ahn, Heejae;Cho, HunHee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.200-201
    • /
    • 2022
  • Off-Site Construction is being widely adopted as an alternative to solve endemic problems in construction industry such as low productivity and efficiency. However, it is strongly recommended to examine the transportation process to be optimized because it determines the size of a modular and influences the cost of the construction. Therefore, in this study simulation model for optimization of modular construction transportation plan was developed using AnyLogic. As a result of the study, the influence of trailer transport capacity and transport time increases as the number of modular which should be transported from factory to site increases.

  • PDF

A Study on the Analysis of Function for the Enhancement of the Tool for Assemble of Unit Modular (유닛모듈러 조립공구 개선을 위한 기능분석 연구)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Park, Su-Yeul;Jung, In-Su
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.239-241
    • /
    • 2012
  • The major industrialized nations have continued to develop industrialized construction techniques based on automated production processes in factories, and are applying them to a wide range of building. However, the unit modular construction system has had a shorter history of development and application in Korea compared to advanced countries, and consequently, Korean modular builders have a relatively poor technical capacity. So this study is draw a conclusion on the target of priority improvement for idea creation. It study on the enhancement of the functionality of the tool for assemble of Unit Modular that choose the enhancement of the functionality through the analysis of function on the three-level of functional definition and classification, functional arrangement, functional appraisal.

  • PDF