Acknowledgement
본 논문은 국토교통부/국토교통과학기술진흥원의 지원으로 수행되었음(과제번호 22ORPS-B158109-03)
Off-Site Construction is being widely adopted as an alternative to solve endemic problems in construction industry such as low productivity and efficiency. However, it is strongly recommended to examine the transportation process to be optimized because it determines the size of a modular and influences the cost of the construction. Therefore, in this study simulation model for optimization of modular construction transportation plan was developed using AnyLogic. As a result of the study, the influence of trailer transport capacity and transport time increases as the number of modular which should be transported from factory to site increases.
본 논문은 국토교통부/국토교통과학기술진흥원의 지원으로 수행되었음(과제번호 22ORPS-B158109-03)