• Title/Summary/Keyword: line balancing

Search Result 209, Processing Time 0.026 seconds

Variable Sampling Inspection with Screening When Lot Quality Follows Mixed Normal Distribution

  • Suzuki, Yuichiro;Takemoto, Yasuhiko;Arizono, Ikuo
    • Industrial Engineering and Management Systems
    • /
    • 제8권3호
    • /
    • pp.131-138
    • /
    • 2009
  • The variable sampling inspection scheme with screening for the purpose of assuring the upper limit of maximum expected surplus loss after inspection has been proposed. In this inspection scheme, it has been assumed that a product lot consists of products manufactured through a single production line and lot quality characteristics follow a normal distribution. In the previous literature with respect to inspection schemes, it has been commonly assumed that lot quality characteristics obey a single normal distribution under the condition that all products are manufactured in the same condition. On the other hand, the production line is designed in order that the workload of respective processes becomes uniform from the viewpoint of line balancing. One of the solutions for the bottleneck process is to arrange the workshops in parallel. The lot quality characteristics from such a production line with the process consisting of some parallel workshops might not follow strictly the single normal distribution. Therefore, we expand an applicable scope of the above mentioned variable sampling inspection scheme with screening in this article. Concretely, we consider the variable sampling inspection with screening for the purpose of assuring the upper limit of average outgoing surplus quality loss in the production lots when the lot quality follows the mixed normal distribution.

정수계획법에 의한 다수 표면실장기의 라인 최적화 (Integer Programming Approach to Line Optimization of Multiple Surface Mounters)

  • 김경민;박태형
    • 한국콘텐츠학회논문지
    • /
    • 제6권4호
    • /
    • pp.46-54
    • /
    • 2006
  • 다수 대의 표면실장기를 포함한 PCB조립라인의 생산성 향상을 위한 방법을 제시한다. PCB조립시간의 단축을 위하여 각 실장기 별로 부품공급 피더의 배치 및 실장순서가 최적화 되어야 하며, 표면실장기들의 라인 밸런스를 위하여 부품 할당이 최적화 되어야 한다. 전체의 최적화 문제를 정수계획문제로 수식화하며, 전향경로문제와 후향경로 문제로 분할하여 구성한다. 클러스터링 알고리즘과 branch-and-bound 알고리즘을 사용하여 전향경로문제의 해를 구하며, 할당 알고리즘과 연결 알고리즘을 사용하여 후향경로 문제의 해를 구한다. 시뮬레이션 결과를 통하여 제안된 방법의 성능을 평가한다.

  • PDF

흐름생산 공정에서의 작업 대기시간을 고려한 공정 개선 상한선 도출 : H사의 공정 개선 계획안 시뮬레이션 사례를 중심으로 (A Simulation Study for Evaluation of Alternative Plans and Making the Upper-limit for Improvement in Productivity of Flow-shop with Considering a Work-wait Time)

  • 송영주;우종훈;이동건;신종계
    • 한국시뮬레이션학회논문지
    • /
    • 제17권2호
    • /
    • pp.63-74
    • /
    • 2008
  • 공정 개선의 문제는 원가 절감, 수익구조 개선을 목표로 하는 생산 전략부서, 생산 계획에 의해 제시된 제품의 목적 생산량을 달성할 수 있는 공정 설계하고자 하는(설계 공정 능력, Tact time) 공정 설계 부서의 공통 요구사항이다. 목표하는 생산량을 달성하기 위해 작게는 라인밸런싱(Line-Balancing), 병목공정 제거를 수행하고 있으며, 크게는 설비 증설, 작업자 증원 등의 공정 개선을 시도한다. 문제는 대부분의 경우, 공정 개선 프로세스가 정적 예측 기반의 수리적인 방식에 기인하고 있다는 점이며, 특히 라인 생산 기반의 컨베이어 공정의 경우, 컨베이어의 이송 능력에 따른 대기시간 부분이 배제되고 있다는 것이다. 공정 대기시간은 설비의 정미시간과는 별개의 문제로 설비의 싸이클 타임(Cycle Time)의 수치에 따라 변동하는 변수로서 중요하다. 이에 본 논문에서는 H 사의 컨베이어 라인 공정을 대상으로 이산 사건 기반의 시뮬레이션을 수행하여 일련의 공정 개선 프로세스를 밟아가며, 컨베이어에 의해 발생하는 공정 대기시간의 공정 개선에의 기여도를 측정하여 공정 개선의 주요 변수로서 제시하고자 한다.

  • PDF

Decoupled Neural Network Reference Compensation Technique for a PD Controlled Two Degrees-of-Freedom Inverted Pendulum

  • Seul Jung;Cho, Hyun-Taek
    • International Journal of Control, Automation, and Systems
    • /
    • 제2권1호
    • /
    • pp.92-99
    • /
    • 2004
  • In this paper, the decoupled neural network reference compensation technique (DRCT) is applied to the control of a two degrees-of-freedom inverted pendulum mounted on an x-y table. Neural networks are used as auxiliary controllers for both the x axis and y axis of the PD controlled inverted pendulum. The DRCT method known to compensate for uncertainties at the trajectory level is used to control both the angle of a pendulum and the position of a cart simultaneously. Implementation of an on-line neural network learning algorithm has been implemented on the DSP board of the dSpace DSP system. Experimental studies have shown successful balancing of a pendulum on an x-y plane and good position control under external disturbances as well.

Bucket Brigade를 기반으로 한 분산자율형 조립셀 운영전략 (A Decentralized Self-Control Strategy for Assembly Cell Using Bucket Brigade)

  • 구평회
    • 대한산업공학회지
    • /
    • 제41권4호
    • /
    • pp.330-337
    • /
    • 2015
  • A bucket-brigade is a way of transporting items where items are passed from one person to the next. The operation of the bucket brigade imitates the cooperative behavior of ants when brood, food or other resources are moved. Koo (2009) presented a bucket brigade-based assembly cell where each worker follows a simple rule: perform assembly operations on a product until the next worker downstream takes it over; then go back to the previous worker upstream to take over a new assembly job. In this way, the flow line is self-balanced without any predetermined job assignment. However, there are some productivity losses related to hand-off and blocking. This paper examines the hand-off and blocking losses and presents a new bucket brigade-based assembly cell where working areas for each assembler is restricted with the help of buffer interfaces. Simulation experiments are used to validate the performance of the new assembly system.

시뮬레이션 기법을 이용한 유압생산부 설비배치 계획의 분석 (An Analysis of Hyd-Cylinder Shop Facilities Planning by Simulation)

  • 정귀훈;정수원;박동환;김중철;권경열
    • 산업공학
    • /
    • 제5권2호
    • /
    • pp.39-52
    • /
    • 1992
  • This paper presents alternatives for facilities planning and analyses them using simulation approach. For this purpose, hydro-cylinder production line was sampled as a case study. Several facilities planning alternatives are evaluated based on the several factors such as line balancing, equipment utilization, optimum number of equipments, inventory size, flow time, bottleneck machine, and productive capacity. An optimal facilities planning is proposed based on the degree of meeting with the all factors evaluated. The simulation language employed in this study is SIMAN and the data used for simulation are provided by hydro-cylinder shop.

  • PDF

다기능 표면실장기의 공정계획 프로그램 개발 (Development of the Process Planning Program for a Multi-functional Surface Mounting Device)

  • 손진현;유성열;강장하;박성수;오병준;성필영
    • 산업공학
    • /
    • 제10권1호
    • /
    • pp.155-167
    • /
    • 1997
  • The purpose of this study is to develop the program for efficient operation of a multi-functional surface mounting device(SMD) which mount various components on a printed circuit board(PCB). These components are provided by diverse types of feeders such as cassette, stick and tray feeders. The SMD has one or two heads. In the SMD, the positions of PCB and feeders and fixed, and the head moves to pick up a component from a feeder and to mount it on the PCB. The number of lanes occupied by each feeder and the nozzle used for each component can be different. We develop an off-line program to minimize the cycle-time of the SMD by studying the optimal assignment of feeders and the optimal mounting sequence of components. Graphical User Interface(GUI) is also developed. Additionally, we consider the line balancing problem which appears when two SMDs are used sequentially.

  • PDF

다양한 형태의 멀티미디어 데이터를 위한 통신 프로세서의 효율적 관리 방법에 대한 연구 (Adaptive Online Processor Management Algorithms for QoS sensitive Multimedia Data Communication)

  • 김승욱;김성천
    • 한국통신학회논문지
    • /
    • 제32권1B호
    • /
    • pp.17-21
    • /
    • 2007
  • 본 논문에서는 멀티미디어 네트워크상에서 우선순위가 높은 서비스의 QoS를 보장하며 동시에 프로세서의 에너지 효율을 최대화하는 적응적 온라인 프로세서 관리기법을 제안하였다. 이 기법은 현재 네트워크의 트래픽 상황을 기반으로 하여 실시간으로 프로세서를 관리한다. 제안된 방법의 가장 큰 특징은 상호 상충하는 다양한 성능 메트릭들 사이에 적정한 균형을 이루어 안정적으로 시스템을 운영하는데 있다. 컴퓨터 시뮬레이션을 통하여 기존에 제안된 프로세서 관리기법에 비해 본 논문에서 제안된 방법이 다양한 트래픽 상황에서 우수한 성능을 가지는 것을 확인할 수 있었다.

3D 모델링 기법을 이용한 작업자효율 및 생산성 분석 (Worker utilization and productivity analysis using a 3D modeling technique)

  • 윤영수;양승렬;이수철;서승록
    • 한국산업정보학회논문지
    • /
    • 제5권1호
    • /
    • pp.37-46
    • /
    • 2000
  • 본 연구는 작업자 효율 균형화, 생산성 향상등과 같은 시스템 수행도를 개선하기 위해 자동차 부품 조립라인의 시뮬레이션 모델을 개발하였다. 시뮬레이션 모델은 완벽한 3D환경을 제공하는 이산사건모델링 도구인 QUEST를 이용하였으며, 이를 이용하여 현재의 생산라인의 수행도를 분석하였으며, 작업자효율을 균형화시키면서 생산성을 향상시킬 수 있는 방안을 제시하였다.

  • PDF

측음평형회로를 삽입한 수화음 증폭전화기 (A New Telephone with R-C Coupled Neutralizing Circuit and Amplifier in the Receiver)

  • 현경호;오명환;이광원
    • 전기의세계
    • /
    • 제19권3호
    • /
    • pp.18-25
    • /
    • 1970
  • Chesin-1 telephone currently used in Korea is quite similar in design to early Japanese model of Type-4 telephone which is now being replaced by Type-600 having much improved characteristics. Chesin-1 telephone has a relatively high side-tone level, since the line impedance was taken as a purely resistive component for simplicity in the design of its transmission networks. To meet a current trend of using a smaller diameter of wire for telephone line, it is necessary to improve the present type which has a limited receiving efficiency. A new telephone set has been designed to have an amplifier and a R-C coupled side-tone balancing network. The set offers 8dB gain in the overall performance of transmitting and receiving without any unbearable side-tone disturbances. The paper describes both theoretical and experimental characteristics of the new set.

  • PDF