Journal of Construction Engineering and Project Management
/
제6권4호
/
pp.24-34
/
2016
Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.
Gu Taek Kim;Ji Woong Yeom;Kyong Hoon Kim;Choong Hee Han;Jae Jun Kim
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.499-505
/
2009
Along with the changing pattern that the construction project is getting complicated, large-scaled and up-to-dated, necessity of efficient management of manpower and resources of the construction site is being increased. In particular, considering that the construction site requires a lot of labor force and in terms of the construction cost, labor cost shares 30-40%, labor management has become a very important factor. In this study, in order to support a stable and successful construction project implementation and supplement the existing system being utilized at the current site, construction site access management automation system based on hand vascular pattern, a biometrics system, is intended to be developed. Relevant theory for the system development and the problem of existing RFID system were evaluated and based on this findings, a system design and DB composition chart were envisaged. In addition, by applying this developed system to a number of sites, its result was analyzed
Stakeholder management in construction projects is an important factor in project performance creation. The purpose of this study is to verify the effect of the recognition of the importance of the quality influence factors among the stakeholders of the construction project on the perceived quality and the project performance. The impact of the project management methodology on the project performance has been actively researched, but there is little research result on the project stakeholders. The projects to be researched are apartments and buildings that have been completed within the last five years of domestic large construction company. The method of survey is to measure the consensus of the importance of the quality influential factors among the three parties such as the ordering party, the design supervisor and the constructor, and confirm whether the agreement affects the quality of the actual project. Finally, the research model was verified by surveying the satisfaction of the client on the final product. The results are as follow. The degree of agreement on the importance of quality influential factors among stakeholders has a significant effect on perceived quality. In the relationship between perceived quality of influence factors, organizational (support) quality influenced technological quality and managerial quality, and technological quality and managerial quality also have significant influence on resource quality. The results of analysis showed that perceived quality of resources strongly influenced project performance. The remaining three experienced qualities also significantly affect project performance.
As characteristic of construction industries, the Issues of construction management have been pointed out because of time and space limit among construction project participants (owner, supervisor, builder, experiment specialty institute, specialty construction company, material supplier and equipment supplier). To improve these issues, procurement system has been introduced by using internet and intranet. Procurement system that was developed by some of large construction companies was considered only internal supply on closed system method. They also restricted to article supply as supply concept. In this paper, we suggest a plan to establish integrated construction procurement system that expands to the article, service and construction work supplies by utilizing the bi-directional and real-time contact system and presents related following research program.
Ju-Yeoun Han;Dong-Woo Shin ;Kyung-Rai Kim ;Sang-yoon Chin;Hee-Sung Cha
국제학술발표논문집
/
The 1th International Conference on Construction Engineering and Project Management
/
pp.1100-1105
/
2005
To compete with large construction companies whose dominance in market share is deepening recently, the needs for improving field production system of mid-size construction companies have increased rapidly. The development of an adequate model that focuses on the organizational size and work process of the mid-size construction companies are needed to increase productivity through the informatization in the construction industry[0]. The authors of this study used case studies on the problems of the mid-size construction companies in procuring work and presented a method to solve such problems so that the managers in head office of those mid-size construction companies can effecitively deal with multiple sites[0].
실시설계도서의 품질은 시공, 그리고 운영 및 관리단계에도 큰 영향을 미친다. 그리고 적절한 실시설계기간의 확보는 실시설계도서의 품질을 위해 중요한 요소이다. 따라서 이 연구는 2009년부터 2014년까지 조달청 맞춤형 서비스를 통해 발주된 총 42개의 건설프로젝트의 실시설계단계의 기간을 분석하였다. 분석에 의하면, 실제 실시설계기간은 계획 실시설계기간보다 1.33배에서 1.79배가 소요되었다. 계획 실시설계기간은 건설교통부 제2000-235호에서 고시하고 있는 방식대로 공사금액에 의해 산정하고 있었지만, 실제 실시설계기간은 공사금액과 아주 낮은 상관관계를 보였다. 이 결과를 토대로 실무자들과 인터뷰를 진행하였고, 공사금액이 실시설계기간과 낮은 상관관계를 보인 것은 이들에게 아주 잘 알려진 사실이었다. 그들은 공사의 복잡도, 설계변경의 정도, 그리고 발주처의 성향에 따라서 실시설계기간이 크게 좌우된다는 점을 언급하였다. 따라서, 실시설계도서의 품질을 향상시키기 위해서는 다양한 요소들을 실시설계기간 산정에 적용하여 적절한 기간을 산정해야하며, 고품질의 실시설계도서는 건설산업에 긍정적 효과를 불러일으킬 것으로 보인다.
Woo-Sik Jang;Heedae Park;Sungmin Kim;Seung Heon Han;Jong Seo Jeon
국제학술발표논문집
/
The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
/
pp.273-279
/
2011
Concerns over the environment have spawned a number of research studies in the construction industry, as the construction of built environments and large infrastructures involves diverse environmental impacts and loads of hazardous emissions. Many researchers have attempted to quantify these environmental loads, including greenhouse gases, carbon dioxide, nitrogen dioxide, and sulfur dioxide, to name a few. However, little research has been conducted regarding integrating the life-cycle assessment (LCA) of environmental loads with the current life-cycle cost analysis (LCCA) approach. This study aims to estimate the environmental loads as a monetary value using the European Climate Exchange (ECX) rate and, then, to integrate those impacts with the pure construction cost. Toward this end, this study suggests an integrated approach that takes into account the environmental effect on the evaluation of the life-cycle cost (LCC). The bill of quantity (BOQ) data of a real highway project are collected and analyzed for this purpose. As a result, considering the environmental loads in the pavement process, the total LCC increased 16% from the traditional LCC cost. This study suggests an integrated approach that will account the environmental effect on the LCC. Additionally, this study is expected to contribute to better decision-making, from the perspective of more sustainable development, for government as well as for contractors.
건설프로젝트 특성은 기획단계에서부터 목적물이 완공될 때까지 다양한 이해관계자의 참여가 수반되며, 이러한 특성은 불확실성을 높이는 원인이 된다. 건설프로젝트 성공을 위해서는 리스크에 대한 분석과 적절한 대응이 필요하다. 따라서 본 연구는 건설프로젝트 중 하천재해예방사업의 성공을 위한 리스크 관리요인의 영향력과 시공과정에서 관련된 이해관계자 간의 커뮤니케이션 조절효과를 확인하고자 하였다. 시공과정의 리스크 관리요인의 도출은 델파이기법과 설문조사는 스노우볼 샘플링 방법을 그리고 분석은 SPSS Statistic 20과 SmartPLS 2.0을 이용하였다. 연구결과, 프로젝트 성과에 대한 리스크 관리 요소의 영향력은 공기리스크, 품질리스크, 원가리스크, 안전리스크, 건설환경리스크 순으로 나타났다. 또한, 커뮤니케이션 조절효과의 영향력은 원가리스크, 품질리스크, 건설환경리스크, 공기리스크, 안전리스크 순으로 나타났다. 본 연구에서 하천재해예방사업 관련 이해관계자 간의 커뮤니케이션은 프로젝트성과에 미치는 영향력의 순위를 바꿀 만큼 조절효과가 있다는 것을 확인할 수 있었다. 이는 하천재해예방사업 시공과정에서 커뮤니케이션의 중요성을 보여주는 결과이다. 본 연구는 하천재해예방사업의 리스크 관리요인과 커뮤니케이션의 중요성을 규명했다는 점에서 중요한 의의를 가진다.
최근 국내 건설공사에서 공기관련 클레임과 분쟁의 발생건수가 급격한 증가세를 보이고 있다. 이러한 현상은 전통적으로 발주자 우위의 국내 건설 계약관행이 계약당사자간 상호적이며 균형적인 관계로 변화되고 있음을 시사하는 것이다. 공기지연 분석은 건설공사 착공시 승인된 공정표의 종류, 공사진행 과정에서 공정표 실적관리를 어떻게 했는지에 따라 적용 방법을 선정하게 된다. 그리고 공기지연 분석에서 가장 중요한 전제조건은 공사초기에 합의된 완전한 CPM공정표가 준비되어 있고, 그러한 공정표의 실적관리가 제대로 기록되어 있는 것이다. 본 연구는 국내 민간 발주자의 대형신축건물을 공사하는 과정에서 시공자가 손해를 보았다며 발주자를 상대로 손해배상을 청구한 사건의 공기지연 분석 방법론을 적용에 관한 것이다. 본 연구에서는 불완전한 CPM공정표에 계획공정 분석법 적용이 적절한 지 판단하고, 이에 대한 대안으로 새로운 기준의 계획공정 대비 완료공정법을 제안한다. 그리고 사례 프로젝트에 계획공정 대비 완료공정법을 적용한 다음, 계획공정 분석법 결과와 비교분석한다. 본 연구의 목적은 국내 건설공사의 공정관리 현실에 적합한 공기지연 분석방법을 제시함으로써, 향후 국내 건설공사의 공기지연관련 분쟁과 소송에서 의미 있는 참고자료로 활용될 수 있도록 하는 것이다.
건설사업의 관리는 정보화 환경에서 이뤄지고 있으며, 건설업무 추진 중 많은 양의 건설정보가 생성된다. 사업종료 후 건설정보는 성과물 형태로 정리되어서 발주자에게 이관된다. 정보화의 발전에도 불구하고 성과물은 문서, 자료 등 파일을 CD로 작성하여 제출하는 방법을 현재 따르고 있다. 기업의 관점에서 다수의 프로젝트가 존재할 경우 파일형태의 성과물 관리는 데이터 관리에 있어서 비효과적이다. 본 논문은 XML 데이터베이스를 기반으로 하는 성과물 관리 프로세스를 제시하여 프로젝트 성과물의 활용성을 높이는 것을 목적으로 한다. 새롭게 제시된 프로세스에서는 건설 프로젝트의 성과물을 단순한 파일 형태로 제공하는 것이 아니라 데이터베이스 형태로 제공한다. 본 연구의 효과를 검증하기 위해서 개발된 XML 데이터 베이스 기반의 성과물관리시스템 파일럿은 성과물 자료의 이관을 편리하게 할 뿐만 아니라, 데이터의 저장과 검색, 수정을 용이하게 하여 성과물의 활용성을 높인다는 것을 보여준다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.