• Title/Summary/Keyword: inventory method

Search Result 814, Processing Time 0.024 seconds

A pilot study for restandardization of CDI( Child Development Inventory) in Korea (K-CDI 아동발달검사 표준화를 위한 예비연구)

  • Kim, Jeong-Mee;Shin, Hee-Sun
    • Child Health Nursing Research
    • /
    • v.12 no.2
    • /
    • pp.260-267
    • /
    • 2006
  • Purpose: This pilot study was to develop Korean version of CDI(The Child Development Inventory) and assess the validation and reliability on K-CDI. Method: The K-CDI is assessed by parent-report method that has designed to screen children developmental functioning on 12 months to 6.5 years of age /or older children who are judged to be functioning in the one to six-year range. The inventory assesses areas of child development in the social, self-help, motor, language, letter and number skills. also, it includes various symptoms and behavior problems that young children may have. Participants were 130 children and their mothers who has lived in Seoul or Gyounggi-Do. Data was analyzed on the ratio of item response, Pearson's correlation, and Cronbach alpha. Results: 270 items with 8 sub-developmental realms were confirmed the reliabilities and validity on Korean children. Total 300 items were selected for restandardization. There was a significant correlation between the score of Social Maturity Scale and K-CDI. The corrlation coefficient alpha was .98. Conclusion: This study indicated that CDI is applicable in the clinical and early childhood educational setting for developmental assessment in Korea.

  • PDF

The Research on the Managing Method for Reasonable Amount of Inventory in Construction Site Using Inventory Model and BIM Data. (재고모형과 BIM 데이터를 활용한 건설현장의 적정 재고 관리방안에 대한 연구)

  • Kim, Ban-Seok;Park, Byung Joo;Park, Jung-Lo;Kim, Joo-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.119-120
    • /
    • 2012
  • The management for materials and inventory is one of the factors which are considered the most for profits of a business in almost all industrial fields. Resource procurement which occupies more than 40% of an overall construction cost has a strong relationship with profits of a business but it is regarded as a work for a manager rather than for a technician. It makes the importance of resource procurement relatively low and slows down the development of workings. As the construction project becomes more larger and complicated, effective management for materials are directly affecting the profits of a business. Therefore, this research works on finding an economical managing method for materials according to a characteristic of construction project based on accurately forecasted BIM data. Finding a reorder point by using BIM data which contains an accurate data for schedule and material enables a better management for materials and provides more accurate data on matters which were used to be determined by an intuition of a manager.

  • PDF

A Stochastic Partial Backorder Inventory System with a linear Backorder Ratio (선형 부재고비율(線形 負在庫比率)을 갖는 확률적 부분부재고(確率的 部分負在庫)시스템에 관한 연구(硏究))

  • Lee, Kang-Woo
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.20 no.3
    • /
    • pp.105-116
    • /
    • 1994
  • This paper presents an inventory model with partial backorders for the situation in which demand is deterministic, lead time follows normal distribution and back order ratio during the stockout period varies in proportion to the length of backorder period In this situations, an objective function is formulated to minimize a time-proportional backorder cast and a fixed penalty cost per unit lost. And then the procedure of iterative solution method for the model is developed to find optimal reorder paint and order quantity and a numerical example to illustrate the proposed method is presented.

  • PDF

Application of Dose to Curie Conversion Method using MCNP-4C code for the evaluation of Radionuclide Inventory in a Radioactive Waste Container

  • Sang-hee, Kang;Hwang, Ki-ha;Lee, Sang-chul;Lee, Kun-jai;Kim, Tae-wook;Kim, Kyoung-deok;Herr, Young-hoi;Song, Myung-jae
    • Proceedings of the Korean Radioactive Waste Society Conference
    • /
    • 2004.06a
    • /
    • pp.174-174
    • /
    • 2004
  • It is necessary to perform the radionuclide inventory assessment for the disposal of low and intermediate radioactive waste containers. The $\gamma$ nuclide analyzer can be used for the assessment of containers. However, if the radioactivity in the containers is extremely low or high, radionuclide inventory of the containers can not be evaluated properly. Also, gamma scanning method is time consuming and has economical burden to the utilities.(omitted)

  • PDF

A Study on the Effective Inventory Management by Optimizing Lot Size in Building Construction (건설공사의 적정 Lot Size 결정에 의한 효율적인 재고관리 방안에 관한 연구)

  • Kim, Sang-Hoon;Kim, Gwang-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.2
    • /
    • pp.73-80
    • /
    • 2004
  • The purpose of this study was to look up the proper inventory management system in construction industry. it is important for construction company to improve competitiveness and to reduce construction cost. Lot-sizing techniques were applied to rebar procurement in apartment project. The results of this study were as follows; the method of Groff's marginal cost showed the best performance of other techniques and the method of Norman showed a similar result.

A Methodology for Efficient Portfolio Management Using Inventory Control Technique (재고통제기법을 이용한 효율적 포트폴리오 관리 방안)

  • Ryu, Jae-Pil;Shin, Hyun-Joon
    • IE interfaces
    • /
    • v.25 no.2
    • /
    • pp.163-169
    • /
    • 2012
  • This paper proposes an efficient portfolio management methodology named sSPPM with consideration of risk and required return. sSPPM employs Markowitz's portfolio model to select securities and adopts ($s$, $S$) policy that is a well-known technique in the inventory control area to revise the current portfolio. Computational experiments using virtual stock prices generated by monte carlo simulation method as well as real stock ones of KOSPI for recent 4 years are conducted to show the excellence of the portfolio management under ($s$, $S$) policy framework. The result shows that sSPPM is remarkably superior to both 6 or 12 months based periodic portfolio revision method and market (KOSPI index).

The Method of Determinating the Spare Inventory Level in the Repairable Munition System (수리가능한 군수품의 여유재고수준 결정기법)

  • Yu Hyeong-Geun;Kim Man-Sik;Kim Jong-Su
    • Journal of the military operations research society of Korea
    • /
    • v.16 no.2
    • /
    • pp.96-104
    • /
    • 1990
  • This paper concerns the problem of deciding the rational spare inventory levels for efficient use of a limited defence budget and, at the same time, for enhancing the operation rate of equipement/weapons in the army. The system we are concerned has a finite number of repairmen at each base and the depot. After repair job has completed, the repaired items are returned to the base where they have originated. For the system, we identify the distribution of the total number of failed items which belong to a base and develope a method to find spare inventory levels of repairable items at each base to satisfy a specified minimum fill rate.

  • PDF

A Study on conclusion about inventory survey on cut slope along national roads in Korea (국내 국도변 비탈면 현황 분석 연구)

  • Park, Jae-Young;Shin, Chang-Gun;Jang, Bum-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.09a
    • /
    • pp.722-726
    • /
    • 2010
  • Inventory survey is process collecting data about cut slope. It's different from inspection. It contains not only basic information about cut slope, especially location, GPS positioning, height, length, weathering, joint direction, water conditions but also level of danger and damage. Collected data are being used get at status about cut slope along national roads. And It helps judging about priority of detailed investigation. According to results of analysis, we found better method about maintenance of cut slope. Later on, if inventory research is finished, we will understand characteristics of collapse slopes.

  • PDF

A study on a single production inventory model with decaying items (진부화 제품의 단일 생산 재고 모델에 관한 연구)

  • 소재영;윤덕균
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 1995.04a
    • /
    • pp.476-486
    • /
    • 1995
  • In this paper, an attempt has been made to revise Raafat' s(1985) results on an inventory model for decaying raw materials and the finished product at a constant rate which was based on Goyal's integrated inventory model for a single product system. This paper is concerned with scheduling the frequencies of order quantity of several different raw materials on a production inventory model. The purpose of this paper is to present a simple method of deciding the frequencies of order quantity of raw materials, in the sense of minimizing the average total cost of the system. We describe on iterative procedure for directly determining near optimal frequencies of order quantity for the raw materials and the associated fundamental cycle time which can be used for constructing the production duration of the finished product. In cases where feasible schedules cannot be constructed using the values from the iterative procedure, the procedure provides a basis for changing the order quantity frequencies and the fundamental cycle time to obtain feasible schedules. An example is given to illustrate the derived results.

  • PDF

Integrated Model of Inventory and Waiting Time in EV Battery Switching Stations (배터리 교체식 전기차의 배터리 재고-차량 대기시간 통합모형)

  • Seo, Yong Won
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.37 no.4
    • /
    • pp.51-65
    • /
    • 2012
  • Battery switching EVs are considered to be a promising alternative to overcome long charging time problems in the EV adoption. The purpose of this research is to develop integrated model for battery inventory and battery switching waiting times. Due to complexity of exact analysis, a practical approximation method is developed, which provides close results to exact values. Numerical experiments show that there exist trade-offs between the battery inventory level and the number of switching stations. The proposed model can be applied to evaluate and select the minimum cost alternative in implementing the battery switching stations.