• Title/Summary/Keyword: interruption system

Search Result 386, Processing Time 0.031 seconds

DISCRETE-TIME BULK-SERVICE QUEUE WITH MARKOVIAN SERVICE INTERRUPTION AND PROBABILISTIC BULK SIZE

  • Lee, Yu-Tae
    • Journal of applied mathematics & informatics
    • /
    • v.28 no.1_2
    • /
    • pp.275-282
    • /
    • 2010
  • This paper analyzes a discrete-time bulk-service queue with probabilistic bulk size, where the service process is interrupted by a Markov chain. We study the joint probability generating function of system occupancy and the state of the Markov chain. We derive several performance measures of interest, including average system occupancy and delay distribution.

A Study on Plan of Distribution System considering Customer Interruption Cost (공급지장비를 고려한 배전계통 계획수립)

  • Kim, Yong-Ha;Woo, Sung-Min;Park, Chang-Gyu;Park, Chang-Gyu;You, Jung-Huy
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.159-160
    • /
    • 2008
  • This paper analyzes customer interruption cost for out industrial customer through data survey. And CIC calculated SCDF using regression function. That is, it extract optimal SCDF from AHP. And then to calculate VBDRA applied This algorithm to the distribution system. We proved the adequacy and usefulness of the result.

  • PDF

A study Improvement Direction for Arc Interruption Equipment and On-line Monitoring System of Consumer Low Voltage Facilities (수용가 저압 전기설비의 원격 감시시스템 및 아크차단 장치 활성화 방안에 관한 연구)

  • Kim, Gi-Hyun;Park, Chee-Hyun;Lim, Young-Bai;Choi, Myeong-Il;Bae, Suk-Myong
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.22 no.1
    • /
    • pp.79-86
    • /
    • 2008
  • Domestic and foreign follows the trend which is that safety checkup of electrical facilities is serviced by on-line system with joining information technology. This paper research improvement of what kind of system and law for market environment of electric power value added service. For improvement of market environment of electric power value added service, this paper researches improvement of on-line monitoring system and necessity of arc interruption and revision of arc related law.

A Study on Distribution System Assessment and Interruption Cost Calculation for the Industry Load by the Analytic Approach Method (해석적방법론에 의한 산업용 수용가의 공급지장비 산정 및 배전계통에의 적용)

  • Kim, Yong-Ha;Woo, Sung-Min;Baek, Byum-Min;Sin, Hyung-Chul;Park, Chang-Kyu
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.23 no.4
    • /
    • pp.47-55
    • /
    • 2009
  • This paper estimates interruption cost assessment for industrial load. For executing In this way first, we research customer interruption cost(CIC) for industrial load about 1,026 unit. And to assess industrial load in D/L calculate sector customer damage function(SCDF) using CIC. Second, we compute distribution reliability through annual failure rate, repair time and so on, and then, Third, distribution system that calculate VBDRA for industrial load per alternative assesses interruption cost.

Reliability Cost Evaluation of Power Distribution System with Superconducting Fault Current Limiter (초전도 한류기 적용시 배전계통의 신뢰도 비용 평가)

  • Moon, Jong-Fil
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.63 no.4
    • /
    • pp.266-270
    • /
    • 2014
  • In this paper, the effects of superconducting fault current limiter (SFCL) installed in power distribution system on reliability are evaluated and analyzed. The fault current will be decreased in power distribution system with SFCL because of the increased impedance of SFCL. The decreased fault current will improve the voltage drop of the bus of substation. The voltage drop is an important factor of power distribution system reliability. In this paper, improvement of reliability worth is analyzed when SFCLs are installed at the starting point in power distribution system. First, resistor-type SFCL model is used in PSCAD/EMTDC. Next, typical power distribution system is modeled. Finally, when the SFCLs with impedance 0.5 [${\Omega}$] are installed in feeder, power distribution system reliability is evaluated. Also, the improvement effect of reliability worth including the effect of voltage sag is analyzed using customer interruption cost according to whether or not SFCL is installed.

Reliability-Centered Maintenance Model for Maintenance of Electric Power Distribution System Equipment (배전계통 기기 유지보수를 위한 RCM 모델)

  • Moon, Jong-Fil;Shon, Jin-Geun
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.58 no.4
    • /
    • pp.410-415
    • /
    • 2009
  • With the implementation of electric power industry reform, the utilities are looking for effective ways to improve the economic efficiency. One area in particular, the equipment maintenance, is being scrutinized for reducing costs while keeping a reasonable level of the reliability in the overall system. Here the conventional RCM requires the tradeoff between the upfront maintenance costs and the potential costs of losing loads. In this paper we describe the issues related to applying so-called the "Reliability-centered Maintenance" (RCM) method in managing electric power distribution equipment. The RCM method is especially useful as it explicitly incorporates the cost-tradeoff of interest, i.e. the upfront maintenance costs and the potential interruption costs, in determining which equipment to be maintained and how often. In comparison, the "Time-based Maintenance" (TBM) method, the traditional method widely used, only takes the lifetime of equipment into consideration. In this paper, the modified Markov model for maintenance is developed. First, the existing Markov model for maintenance is explained and analyzed about transformer and circuit breaker, so on. Second, developed model is introduced and described. This model has two different points compared with existing model: TVFR and nonlinear customer interruption cost (CIC). That is, normal stage at the middle of bathtub curve has not CFR but the gradual increasing failure rate and the unit cost of CIC is increasing as the interruption time is increasing. The results of case studies represent the optimal maintenance interval to maintain the equipment with minimum costs. A numerical example is presented for illustration purposes.

A research on the design parameters for a double-transmission main system for sustainable water supply (이중송수관로를 이용한 안정적인 송수를 위한 설계인자에 관한 연구)

  • Hyun, Inhwan;Hong, Juneui;Kim, Dooil
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.27 no.1
    • /
    • pp.129-138
    • /
    • 2013
  • Water interruption is often caused by a rupture in the branch-like singular pipeline. This will cause critical complaints from household and may decrease public service quality. As an alternative of singular pipeline, additional parallel pipeline could be installed for sustainable water supply. This system is called double pipeline system and able to be utilized for water transmission line between treatment plant and distribution reservoir. Construction of double pipeline was thought to increase capital cost, which can be an issue to waterworks authorities. Reducing capital cost was possible by means of installing connectors between two parallel pipelines because of reduced diameter of each pipe. To obtain optimal design condition for connectors, it was necessary to compare water pressure according to accident location, to investigate flow according to connection pipe spacing, connection pipe diameter, and aging of pipe. Reliable and economical connection layouts were determined based on these results. The cost estimation for each design condition was carried out. Cost was approximately reduced by 20 ~ 30 % compared to the double pipeline without connections. In addition to this, connection between double pipelines could expect extra benefits for maintenance since the pipe could be repaired and rehabilitated without interruption.

A Study on the Reliability Evaluation in Regional Underground Distribution System (지역별 지중 배전계통 공급방식의 공급신뢰도 평가 기법)

  • Choi, Sang-Bong;Jeong, Seong-Hwan;Kim, Dae-Kyeong
    • Proceedings of the KIEE Conference
    • /
    • 2001.05a
    • /
    • pp.155-158
    • /
    • 2001
  • The objective of this study is to evaluate properly reliability of underground distribution system taking into account domestic circumstance. Interruption time and number of interruption customer by distribution system based on actual condition in domestic utility are considered as important index to estimate reliability of underground distribution system. This paper presents evaluation results regarding the reliability of an underground distribution system using a model system as new urban area, evaluation results which is established whether automatic system is introduced or not are shown in detail.

  • PDF

An Improvement Scheme of Direct Load Control Program for Electric Power Demand Management (합리적 전력수요관리를 위한 직접부하제어 사업의 개선 방안)

  • Kim, Kyu-Ho;Choi, Seung-Kil;Song, Kyung-Bin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.21 no.8
    • /
    • pp.81-86
    • /
    • 2007
  • This paper proposes the scheme to improve the current direct load control(DLC) program by inspecting the problems of the DLC program. In order to increase the number of the customers participating DLC program, a reduction of the base incentive and an increase of the direct load control incentive are suggested based on the interruption cost of electric power considering the characteristics of load types and the introduction of demand side bidding is recommended. Secondly, the standards of power system operations is required to control DLC program efficiently for the penalty, interruption times, the number of interrupting loads, notice time for the load interruption and the periods of the DLC program contract.

A Qualitative Study on the Career Interrupted and the Child Care of Married Women (기혼여성의 경력단절 및 자녀양육 경험에 관한 질적연구)

  • Um, Kyung-Ae;Yang, Sung-Eun
    • Journal of Families and Better Life
    • /
    • v.29 no.1
    • /
    • pp.21-40
    • /
    • 2011
  • This research is intended to find out the causes of the career interruption of highly-educated housewives, their experiences of caring for their children after career interruption, their psychological conflicts and coping strategies, and their attitudes toward reemployment. The participants were university-graduated housewives in their thirties who have pre-school children older than 2 years. The participants in this research consisted of twenty-nine participants. The essence of this study is the belief system that career and maternal roles are not compatible. Specifically, the participants possessed a certain motherhood ideology, so they gave up working in order to care for their children, deferring their careers for a while. The participants had ambivalent feelings about working mothers, and described their children by highlighting their negative aspects. Additionally, the participants experienced persistent conflicts about developing their careers and caring for their children during their period of career interruption. The participants seemed to possess a vague sense of hope about their careers, and their attitudes toward their careers were ambiguous in the past, present, and even in the future.