• 제목/요약/키워드: integrated use of BIM

검색결과 35건 처리시간 0.024초

비통합적 BlM의 적용 가능성에 관한 연구 (A study on the non-integrated use of BlM)

  • 최종천;김길채
    • 한국디지털건축인테리어학회논문집
    • /
    • 제8권2호
    • /
    • pp.21-28
    • /
    • 2008
  • The main purpose of this paper is to find the phase-in of BIM adoption by focusing on the level of integration. BlM should be aimed at integration and collaboration of all parties furnishing design and construction services to increase the productivity. Therefore, the degree and depth of integration for project collaboration is very important to BlM design process. One of the key advantages of full integration is that is to facilitates the development of detailed information much earlier in the entire design process to improve collaboration among stakeholders. Such integrated use is the ultimate method, but even so, it's not the precondition of BlM. One of the key advantages of relatively low integration as a transition phase is to adopt the BlM earlier than full integration. Such transitional and non-integrated BIM can also reduce the possibility of trial and error in BlM adoption. Therefore, this paper focused on non-integrated use of BlM as a substitute of full IPD by analyzing obstacles in BIM adoption.

  • PDF

A Development of Unified and Consistent BIM Database for Integrated Use of BIM-based Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Lee, Sung-Woo;Kim, Tae-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권2호
    • /
    • pp.127-137
    • /
    • 2019
  • In this study, we have developed a calculation system for BIM-based quantities, 4D process, and 5D construction costs, by integrating object shape attributes and the standard classification system which consist of Cost Breakdown System(CBS), Object Breakdown System(OBS) and Work Breakdown System(WBS) in order to use for the 4 dimensional process control of roads and rivers. First, a new BIM library database connected with the BIM library shape objects was built according to the CBS/OBS/WBS standard classification system of the civil engineering field, and a integrated database system of BIM-based quantities, process(4D), and construction costs(5D) for roads and rivers was constructed. Nextly, the process classification system and the cost classification system were automatically disassembled to the BIM objects consisting of the Revit-family style elements. Finally, we added functions for automatically generating four dimensional activities and generating a automatic cost statement according to the combination of WBS and CBS classification system The ultimate goal of this study was to extend the integrated quantities, process(4D), and construction costs(5D) system for new roads and rivers, enabling the integrated use of process(4D) and construction costs(5D) in the design and construction stage, based on the tasks described above.

Exploring Integrated Design Strategies for the Optimal Use of BIM

  • Park, Hyoung-June;Lee, Ji-Hyun
    • Architectural research
    • /
    • 제12권2호
    • /
    • pp.9-14
    • /
    • 2010
  • This paper introduces an experimental design studio that explores the optimal use of current digital technologies in order to employ Building Information Modeling at the early phase of design process. Based upon the outcomes from the aforementioned studio, the paper discusses the integrated design strategies for BIM in the design process. In this paper, BIM is proposed as a design tool that increases an overal design productivity more effectively and efficiently compared to BIM as a construction tool with encouraging a design communication among different partakers in the design process.

BIM 도구 활용을 통한 건축공학설계의 프로세스 (Integrated Architectural Engineering Design Process Using BIM Tools)

  • 강다영;신규철
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.175-178
    • /
    • 2010
  • Public institutions and owners have been introduced to use Building Information Modeling (BIM) tools. Learning BIM becomes an important factor in design process of undergrad program. The purpose of this study is to demonstrate an integrated architectural engineering design process using BIM tools. BIM education programs are analyzed to compare the level of detail in BIM education. An architectural engineering design class needs to involve BIM to introduce integrated process. An architectural engineering design process needs be based on understanding design, building structure, construction and building services. 3D Modeling helps understanding a building structure and checking environment-friendly element analysis. As a result of this research, new process of design education is proposed under four issues.

  • PDF

A Conversion Process to IFC Files for Integrated Use of Open and Web-based BIM Quantities, Process, and Construction Costs in Civil Engineering

  • Lee, Jae-Hong;Hwang, Hee-Suk
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권10호
    • /
    • pp.11-23
    • /
    • 2019
  • 본 연구에서는 토목분야의 다양한 상용 BIM 모델링 설계 소프트웨어의 사용자들에게 상호 호환성과 상호 운용성을 보장하기 위해 BIM 국제 표준 파일 포맷인 IFC 파일로의 파일 변환 프로세스를 새롭게 설계하여 제시한다. 제안된 프로세스는 상용 BIM 모델링 소프트웨어를 위한 add-in 방식의 컨버터(Converter)를 사용하여, 변환되는 IFC 파일의 3차원 객체 형상 정보에 수량 산출식 코드 속성과 토목 분야 CBS/OBS/WBS 표준분류체계 속성으로 구성되는 추가적인 속성들을 삽입한다. 또한, 개방형(Open) 웹 기반 수량, 공정(4D) 및 공사비(5D) 관리를 위한 IFC 파일의 통합 활용 프로세스를 추가로 설계하고 구축한다. 이러한 작업을 통해 토목 분야의 BIM 모델링 설계 단계에서 최종적인 시공 단계에 이르는 개방형 웹 기반 수량, 공정(4D) 및 공사비(5D)의 연계적 활용에 대한 새로운 프로세스를 제시하는 것이 본 연구의 궁극적인 목적이다.

국내 대학의 BIM 기반 IPD 교육 현황 분석에 관한 연구 (An Analysis of IPD Education Based on BIM in a Korean Universities)

  • 함미화;손정욱
    • 한국BIM학회 논문집
    • /
    • 제5권3호
    • /
    • pp.11-18
    • /
    • 2015
  • Integrated Project Delivery (IPD) is a new trend in the building industry and a key feature of IPD is the use of BIM to support project collaboration. Therefore, engineers should learn the use of BIM and IPD in the construction industry. In this study, the authors draw necessary components for developing an IPD course curriculum through analyzing a project case and current courses provided by universities in Korea. The authors make several suggestions for effective IPD education in universities.

BIM 기반의 프로젝트 단계별 리스크관리 모델에 관한 연구 (A Study on BIM based Process Risk Management Model)

  • 전승호;최명석;이주호
    • 한국재난관리표준학회지
    • /
    • 제3권1호
    • /
    • pp.61-66
    • /
    • 2010
  • 최근 대두되고 있는 BIM 기술은 다양한 강점을 가지고 있다. 하지만 BIM을 단순히 3차원 모델로 생각하는 오해와, BIM 적용에 대한 체계적인 분석 및 시스템화의 부족으로 인해 BIM의 건설산업 도입은 어려움을 가지고 있다. 따라서 본 논문에서는 BIM 기반의 건설프로젝트에서의 리스크 관리를 목적으로 하여 그 적용 범위에 대한 체계적인 분석을 통하여 최적화된 BIM 기반의 프로젝트 단계별 리스크관리 모델을 제시하고자 한다.

  • PDF

계층분석법을 이용한 BIM(Building Information Modeling)이 건설사에 미치는 영향요인 분석에 관한 연구 (A study on the Analysis of Building Information Modeling Factors of Construction Firms Using an Analytic Hierarchy Process)

  • 심진규;이혜인;김재준
    • KIEAE Journal
    • /
    • 제10권4호
    • /
    • pp.123-130
    • /
    • 2010
  • A lot of construction companies in overseas markets of construction try to change 2D CAD to 3D CAD for improving business ability and change to Building Information Modeling(BIM) for integrating information produced from construction life cycle. In America, GSA(General Service Administration) requires a design drawing planed by BIM and in Singapore and Europe, the government encourages architectures to use this tool. Recently in the domestic market, many organizations related construction industry are aware of importance of 3D CAD integrated information, and try to use BIM. Therefore, this research would analyze how does BIM affect construction industry and derive influence factors and provide basic data for using BIM.

BIM 기반 견적을 위한 창호공사 내역 작성체계 개선 방안 (Improvement of Bill of Quantities of Door and Window Work for BIM-based Cost Estimation)

  • 김미현;조찬원;윤석헌
    • 한국BIM학회 논문집
    • /
    • 제10권2호
    • /
    • pp.12-20
    • /
    • 2020
  • Recently, interest in BIM technology has been growing in the domestic construction market as the number of construction projects requiring the application of BIM technology has increased. The use of BIM allows the use of various visualization functions through 3D models as well as drawing interference review, quantity calculation and integrated management of information. In particular, estimates of construction costs based on BIM can increase work efficiency by reducing the burden of calculating construction costs and managing them. In order to increase the efficiency of BIM-based cost estimates, it is necessary to improve the correlation between the BoQ(Bill of Quantity) information and the BIM model. For this purpose, the ratio of the amount and item to the detailed construction of the current BoQ was analyzed, especially the problem of the calculation of construction cost in the window work in this study. In addition, we would like to suggest a method for systematically linking the BoQ information with the BIM model by improving the BoQ information structure of the window work. It is expected that this will increase the efficiency of the quantity calculation and analysis work of construction cost of window work. In addition, it is expected that this method will help to analyze and predict changes in construction cost of windows and doors by facility characteristics and type.

건축 기획 BIM의 공간 프로그래밍 단계에서 발주자 의사결정지원을 위한 물량예측 방법론에 관한 연구 -건축마감을 중심으로- (A Study on the Process of Estimating the Amount of Materials for Client's Decision-Making Support in Space Programming Stage of Pre-design BIM -focusing on Building Interior Finishing-)

  • 전영진;김주형;김재준
    • 한국디지털건축인테리어학회논문집
    • /
    • 제10권3호
    • /
    • pp.19-28
    • /
    • 2010
  • The construction projects are recently having changes in their magnitude and complexity. Therefore, the amount of information created and managed by participants over project phases is enormous and this may cause difficulties in consistent and integrated data management. Because of the change in construction projects, there is a need to apply more logical and systematic ways to deal integrated data management. For the solution to this, BIM(Building Information Modeling), a new paradigm for integrated management of the information over project life-cycle, has been seriously considered. Also, the Korean Public Procurement Service announced that project over 50 billion Korean Won should introduce BIM into procurement starting from 2012. However, the studies and development have lack on studies of applying BIM and managing the data made using BIM in pre-design and maintenance stage. In pre-design stage, the concept of schematic design model is made to support for making major decisions concerning the size, shape and cost of the project. To decide the cost for the building in this stage by making use of BIM, estimating the amount of building materials used for constructing should be preceded. In this study, the pre-design BIM is explained to gain a better understanding of its process, since this paper focused on space programming stage. Finally, the paper suggests the concept process of estimating the amount of materials in building interior finishing from selecting the type for the elements of each space made to support the client for making decisions in space programming stage based on pre-design BIM.