• 제목/요약/키워드: integrated Construction Management

검색결과 754건 처리시간 0.024초

ERP 기반 건설통합관리시스템의 개발 및 업무생산성 평가 (Development and Evaluation of Business Productivity of Construction Integrated Management System based on ERP System)

  • 백명종
    • 한국전자거래학회지
    • /
    • 제6권3호
    • /
    • pp.163-180
    • /
    • 2001
  • New information technology contributes to raising of business productivity in many construction companies. The application of construction integrated management system is expected to save the time of decision-making in business management and shorten the closing account schedule. Construction Integrated Management System based on ERP(Enterprise Resource Planning) system allows to control core business procedure by monitoring technique on real-time. In this paper, we achieves 10% raise up business productivity in site business area, and 30% raise up business productivity in head of nce business area by means of DW-CIMS (Daewoo Construction Integrated Management System)

  • PDF

ERP 기반 건설통합관리시스템의 개발 및 업무생산성 평가 (Development and Business Productivity of Construction Integrated Management System based on ERP System)

  • 한희석;백명종;배은화
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 2001년도 International Conference CALS/EC KOREA
    • /
    • pp.127-140
    • /
    • 2001
  • New Information Technology Contributes to raising of Business Productivity in many Construction Companies. The Application of Construction Integrated Management System is Expected to Save the time of decision-making in Business Management and shorten the Closing Account Schedule. Construction Integrated Management System Based on ERP(Enterprise Resource Planning) System allows to Control core Business Procedure by Monitoring Technique on Real-time. In This Paper, We achieves 10% Raise up Business Productivity in Site Business Area, and 30% Raise up Business Productivity in Head Office Business Area by means of DW-CIMS (DAEWOO Construction Integrated Management System)

  • PDF

DEVELOPMENT OF COLLECTIVE MANAGEMENT SYSTEM FOR INTEGRATED OPERATION OF U-SPACE

  • Sang-Hun Paek;Jeong-Nam Lee;Jae-Hee Cho;In-Shick Song;Sang-Chae Lim;Kyoon-Tai Kim
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1377-1382
    • /
    • 2009
  • U-City related researches and development have been actively conducted in Korea since 2002. According to the Act on Ubiquitous City Construction, "U-City" is defined as "the city to provide ubiquitous service anytime anywhere through the existing ubiquitous backbone systems and ubiquitous technologies, ultimately for the purpose of improving urban competitiveness and quality of life. This research explains the plan to develop collective management technology for integrated operation of U-Space which makes up U-City. Specifically, this report is intended to suggest basic approach of identifying collective management elements of each U-Space type, developing integrated management system and creating interface module to link the system with urban integrated operation center.

  • PDF

중소건설사를 위한 클라우드 컴퓨팅 기반 EHS 통합관리시스템 프레임워크 개발 (The Framework Development of Cloud Computing-based Integrated EHS Management System for Small and Medium Construction Companies)

  • 서광규
    • 대한안전경영과학회지
    • /
    • 제12권4호
    • /
    • pp.139-143
    • /
    • 2010
  • The small and medium construction companies are facing potential EHS(Environment, Health & Safety) of major accidents to cause casualties or a financial loss and increasing social responsibility. So, they have to voluntarily accomplish the EHS management system rather than passively with regard to EHS regulation. In this study, the framework of integrated EHS management system is developed based on cloud computing, and construction companies are to materialize self-regulation EHS process of construction workplace and to standardize the total EHS business process using the developed system. The proposed system also provides risk analysis, education/control and continuous improvement for EHS tasks and users can easily access the system on the web at a low price through cloud computing service. Eventually, the integrated system contributes to the managerial improvement by minimizing economic and physical loss caused by construction accidents.

건설공사 철근정보관리 개선방안에 관한 연구 (A Study on the Integrated Management System for Rebar Information in Building Construction)

  • 박우열
    • 한국건축시공학회지
    • /
    • 제5권4호
    • /
    • pp.99-106
    • /
    • 2005
  • With labor shortage and high-wage, the construction cost is rising and the construction-business is dull, demanding the construction environment of Korea to raise profitability through major cost savings and rationalization of construction management. Therefore, in this study, to improve many problems found in calculating rebar quantity for capital expenditure programming which is considered the beginning stage of rebar work. and to improve problems such as no grasping of rebar loss due to lack of systematic management in order/purchase stage and construction management stage, a rebar information-management-system was found and preyed. The relation database was designed for the rebar information management system by analyzing work process of a rebar manufacturing plant, as the rebar information that is necessary in a rebar manufacturing plant if similar to that of a purchasing department of general construction company. The Proposed rebar information management system was implemented in two large rebar production plants. The implementation of the proposed system showed that the system increased work efficiency, reduced the management manpower, and improved the project-integrated management

기술경영(MOT) 기반의 건설기술부문 최적화 기획 및 통합관리 시스템 구축에 대한 연구 (Management of Technology(MOT)-based Optimization Technology Sector Planning and the Construction of an Integrated Management System for Building Research)

  • 김대건;정신영
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 춘계 학술논문 발표대회
    • /
    • pp.190-191
    • /
    • 2014
  • Recent construction sector integration and fusion technologies in various areas of research and planning systemis being maintained by the system. Past experience of conservative management in this emerging technology-driven business management through the convergence of various technologies and to find synergies to secure the future of construction technology because it is a need. The purpose of this study is builton the basis of technical and Technology Management Contact optimized system for integrated management of the area you want to build.

  • PDF

WBS-CBS통합정보의 실적수량에 의한 기성 및 진도관리에 관한 연구 (Existing and progress control research of Existing quantity the integrated information Uses WBS-CBS.)

  • 안재홍;이영도
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.261-264
    • /
    • 2009
  • Construction projects are managed by focusing on the results of projects. Moreover, cost and schedule are managed separately even though the efficiency of integrated management is very high. This paper proposes existing and progress control research of existing quantity the integrated information uses WBS-CBS. Schedule and cost are most important in construction projects. Specially, progress and cost are relationship of the managing integrated in many construction management. The quantity of materials for the works of construction is the base to create activities and a network. The quantity of materials of materials for the elemens of a building is a base of cost estimation and resource. allocation. This study suggest method for relating the schedule and cost information through the case study of construction field engineers.

  • PDF

통합건설정보분류체계의 구축방안에 관한 연구 (A Study on the Establishment Plan of Integrated Construction Information Classification)

  • 이교선;박환표;오은호;박상훈
    • 한국건설관리학회논문집
    • /
    • 제3권2호
    • /
    • pp.99-106
    • /
    • 2002
  • 국내의 통일된 정보분류체계 부재는 건설분야 정보화사업의 중복투자 및 건설정보의 사장 등 인적, 물적 손실과 한께 국가 경쟁력 향상에 장애요인을 초래하고 있다. 따라서 정부 또는 민간은 정보유통의 기반조성과 정보화사업의 중복투자 방지 및 정보의 공동이용을 위한 통일된 건설정보 분류체계의 표준화사업을 조속히 추진하여, 건설CALS, 건설사업관리, 설계 $\cdot$시공 통합정보시스템, EVMS(Earned Value Management System) 등 업무의 기반을 구축할 필요가 있다. 따라서, 본 고에서는 국내 실정에 맞는 건설정보 분류체계의 발전방향을 제시하고, 정보분류체계의 활용 및 실무 적용방안을 제시하고자 한다.

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • 제7권3호
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

Development and Application of Integrated Management System in Nuclear Power Plant Construction Project

  • Lee, Sang Hyun;Byon, Su Jin
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.700-701
    • /
    • 2015
  • Nuclear power plant construction project can be called essential to establish a systematic project management system compared to other construction projects, taking into account the size and complexity and safety. To develop into a project management system for the Korea situation with the ongoing construction of the nuclear power plant was directed to promote nuclear power project management. In this paper, we introduce a comprehensive project management system for nuclear power projects. Currently considering the nuclear life cycle design, construction, and was developed by considering the flow of information to operate, and test each step linkage. The systems in English were developed to meet owner's requirements for advancing into overseas projects. Another point is that the systems were developed by management module, so that functions of each area can be selectively applied. It is expected that the system will establish itself as one that can be used for the entire lifecycle of nuclear power plants through gradual and systematic establishment of necessary data.

  • PDF