• Title/Summary/Keyword: installation damage test

Search Result 104, Processing Time 0.023 seconds

Triaxial Shake Table Test about Seismic Performance of Ceiling System with Gypsum Panels (석고 패널이 부착된 천장 시스템의 내진성능 평가를 위한 3축 진동실험)

  • Park, Hae-Yong;Jeon, Bub-Gyu;Kim, Jae-Bong;Gim, Min-Uk
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.10
    • /
    • pp.143-153
    • /
    • 2019
  • In this study, a full scale 3-axes shake table test for M-bar and T-bar type ceilings commonly used in the country was conducted. Through damage inspection during the test, seismic performance of ceilings according to variables, such as clearance between wall mold and ceiling as well as existence of facilities, was evaluated. A test frame consisted of square hollow section members was used for the shake table test. The experimental method was performed as a fragility test using required response spectrum described in ICC-ES AC156. In the case of architectural nonstructural component that contain ceilings, it mainly is evaluated the performance by post-test visual inspection. For the evaluation of seismic performance of ceilings, this study classified and defined damaged items for targeted ceiling system referring to illustrative damage according to nonstructural performance levels accordance with ASCE 41 and previous studies. And proposed illustrative damage items classification was utilized to compare the degree of the damage according to experimental variables. The experiment results confirmed that differences in boundary conditions due to the clearance at wall mold and the installation of facilities had a significant effect on the seismic performance of the ceiling.

The Study on the Impulse Characteristic of Secondary Arresters in Power Distribution System (가공 배전선로 중성선과 가공지선 겸용시의 임펄스 특성 연구)

  • Kang, Moon-Ho;Kim, Dong-Myeong;Song, Il-Keun;Chun, Sung-Nam
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.297-299
    • /
    • 2004
  • In multi-ground distribution system, overhead ground wire and neutral wire are parallel connected to offer the electrical power energy and protect damage of lightning strokes. Therefore a case where the two wires become single wire, the power company can get the benefit such as installation cost saving and line fault protection by simplify of distribution line. In this paper we describe the result of impulse test in both system ; one is the present power system the other is unified power system parallel connected overhead ground wire and neutral wire. As a result of this impulse test, the present power system get lower impulse voltage than the unified power system.

  • PDF

The development of LVI tester for application of transformers winding deformation diagnosis (변압기 권선변형 진단에 적용하기 위한 LVI 시험기 개발)

  • 조국희;김광화
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.16 no.5
    • /
    • pp.97-103
    • /
    • 2002
  • The assessment of the condition of a transformer winding which is suspected of having suffered short circuit damage can be difficult. Conventional test such as winding resistance, magnetic current or insulation resistance will only detect damage if a permanent electrical fault exists. Visual inspection of windings necessitates the removal of oil and in many cases only a very small proportion of the winding can be seen. We describe the characteristic of LVI test system and methods to detect the deformation of windings in the power transformers. As the front rise time of recurrent-surge generator pulse less than 1000 ㎱ and the peak value of pulse is about 500 V, we have the good results of detecting winding deformation in the LVI test of transformers.

A Study of Optimizing Cathodic Protection in Comparison of Design Methodologies

  • Choi, Young-Kwan;Choi, Sang-Yule;Shin, Myong-Chul
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.24 no.11
    • /
    • pp.23-29
    • /
    • 2010
  • The principal factor determining an optimum design method for cathodic protection is finding the protection current for preventing the corrosion of existing, already laid pipe. Some factors currently used to test designs include the sizes and lengths of pipes, soil resistivity, and the coating damage rate. We believe this method and current formulae are not optimum due to the uncertainty of determining the coating damage rate and the corrosion protection current's density. This paper analyzes the amount of protection current obtained by performing a temporary current test using data describing existing laid pipe. We then propose determining the corrosion protection current by using the temporary current test after modifying the formula. In addition, we suggest a way to choose optimized cathodic protection and the process of design by executing the design and taking account of such factors as a site condition of 34km-long non-protected water supply pipe lines (stages I and II) in ${\bigcirc}{\bigcirc}$ region, climate, interferences, and durability.

Proper Installation Methods of SPDs for Information-Oriented and Computerized Equipments (정보통신설비용 서지보호기의 적절한 설치방법)

  • Lee, Bok-Hee;Kang, Sung-Man;Lee, Dong-Mun;Koo, Bon-Wan
    • Proceedings of the KIEE Conference
    • /
    • 2002.11a
    • /
    • pp.194-196
    • /
    • 2002
  • This paper deals with a proper installation methods of SPDs for information-oriented and computerized equipments. Since the information and computerized equipments have AC power lines and communication lines, the potential difference by lightning surge occurs between grounding points of the AC power lines and subscriber protectors, and it causes the flashover and damage. So, we have investigated the effect of the installation methods of surge protectors on the control of overvoltages, using a real-sized test circuit with a customer's facility. As a consequence, it was confirmed that the protection methods by installation of SPDs on the neighbor branch circuit was effective.

  • PDF

The Loading Mock-up test for Construction Management of Cable net Facade (케이블넷 파사드의 시공관리를 위한 하중재하 Mock-up실험)

  • Moon, Sang-Deok;Ock, Jong-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.28-29
    • /
    • 2014
  • Cable net system openness and flexibility is good high and the large deflection caused no damage to the structure itself. However, cable installation, install complex systems and technologies are needed. In this study, for the basic materials of cable net construction management, cable net expert's advice and mock-up test results are summarized.

  • PDF

Structural Performance Evaluation of System Scaffolding for Elevator Installation Work (엘리베이터 설치 작업용 시스템 비계의 구조 성능 평가)

  • Jong Moon Hwang;Gi Yeol Lee
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.3
    • /
    • pp.61-68
    • /
    • 2023
  • This study performed a structural performance evaluation of a system scaffolding for elevator installation work developed in previous studies. The structural performance was evaluated via a structural test conducted to apply the working load specified in the design standard. The deflection of the horizontal member and the stress of each member constituting the system scaffolding were measured. Consequently, the structural safety evaluation including structural behavior and required performance was performed using the deflection and stresses measured from the structural test. The structural test and safety evaluation results based on the heavy working load corresponding to the design load indicated that the deflection, which is the performance criterion of the horizontal member, did not exceed the allowable value. Further, each member's stress, which is a safety evaluation indicator, did not exceed the allowable strength for both horizontal and vertical members with bending behavior and fordable bracing with tensile behavior, while also satisfying the required safety factor. In addition, the results confirmed the safety against deformation, partial damage, and destruction owing to excessive and maximum load. Therefore, the system scaffolding developed in this study satisfies both the structural performance and safety required by the design standards; thus, it can be applied to elevator installation work sites.

Development of Electric safety monitoring system for reducing the electrical fire at traditional market (재래시장 전기화재 감소를 위한 전기안전감시시스템 개발 연구)

  • Kim, Gi-Hyun;Lee, Sang-Ick;Bae, Suk-Myong
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2009.10a
    • /
    • pp.259-262
    • /
    • 2009
  • This paper in order to reduce the electric disaster damage which is caused by with electric equipment of traditional market developed the electric safety monitoring system which is suitable in traditional market. With for this did the actual condition investigation about electrical equipment of traditional market and we constructed Test-bed for testing reliability of electric safety monitoring system. Also experiment led in Test-bed and confirmed a stability. This paper following will be used with the data for the reliability security of the electric safe system operation which follows in the traditional market actual proof equipment construction which will be advanced.

  • PDF

A Case Study on the Assessment of Damaged Cause for the Damaged Reinforced Concrete Pier

  • Chai, Won-Kyu;Kim, Kwang-Il;Son, Young-Hyun
    • International Journal of Safety
    • /
    • v.10 no.1
    • /
    • pp.16-21
    • /
    • 2011
  • In this thesis, appearance inspection, compressive strength of concrete test, arrangement of bar inspection, survey, and bearing stress analysis were performed on a damaged coping of reinforced concrete pier to investigate the damage cause. According to the performed a series of inspections, it was found that the coping of pier was damaged during PSC (Pre-stressed Concrete) beam construction. In this thesis, the repair method for damaged pier was studied. The repair procedure used in this thesis was follows : chipping for damaged part, clean by high-pressure, installation of wire mesh, coating of surface hardening, construction of section restoration material, copula grinding, and prevent coating for far-infrared radiation.

  • PDF

Analysis on inclined or rounded tip piles using 3D printing technology and FE analysis

  • Jaehong Kim;Junyoung Ko;Dohyun Kim
    • Geomechanics and Engineering
    • /
    • v.33 no.1
    • /
    • pp.91-99
    • /
    • 2023
  • To test the effect of various pile tip shape series of model scale loading tests were carried out on test piles with special pile tips. Special pile tips were made using the 3D printer and were attached to the bottom end of the test pile for loading tests. The pile tips were made to have 30°, 45°, 60° inclined tips, as well as a rounded tip. The main objective of the test was to observe the effect of various pile tip shapes on settlement and penetrability of the pile. Moreover, a numerical model simulating the pile loading test carried out in this study was established and verified based on the loading test results. From this, the stress concentration around the pile tip was investigated. This will allow us to analyze the decrease of stress concentration around the pile tip which is the main cause of the pile tip damage during pile installation. However, modifying the pile tip shape will eventually increase the settlement of the pile. By estimating the degree of increase in pile settlement, the viability and the efficiency of the pile shape modification was judged. In addition, case studies on the effect of different pile tip shape and ground conditions on pile settlement and stress dispersion was conducted.