• Title/Summary/Keyword: installation/management

Search Result 1,165, Processing Time 0.03 seconds

A Study on Structural Safety Management Plan for Above Ground and Underground Structure Dismantling work (지상 및 지하구조물 해체공사를 위한 구조 안전관리 방안 연구)

  • Shim, Hak-Bo;Jeon, Hyun-Soo;Seok, Won-Kyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.194-195
    • /
    • 2021
  • Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.

  • PDF

Multi-objective optimization of stormwater pipe networks and on-line stormwater treatment devices in an ultra-urban setting

  • Kim, Jin Hwi;Lee, Dong Hoon;Kang, Joo-Hyon
    • Membrane and Water Treatment
    • /
    • v.10 no.1
    • /
    • pp.75-82
    • /
    • 2019
  • In a highly urbanized area, land availability is limited for the installation of space consuming stormwater systems for best management practices (BMPs), leading to the consideration of underground stormwater treatment devices connected to the stormwater pipe system. The configuration of a stormwater pipe network determines the hydrological and pollutant transport characteristics of the stormwater discharged through the pipe network, and thus should be an important design consideration for effective management of stormwater quantity and quality. This article presents a multi-objective optimization approach for designing a stormwater pipe network with on-line stormwater treatment devices to achieve an optimal trade-off between the total installation cost and the annual removal efficiency of total suspended solids (TSS). The Non-dominated Sorted Genetic Algorithm-II (NSGA-II) was adapted to solve the multi-objective optimization problem. The study site used to demonstrate the developed approach was a commercial area that has an existing pipe network with eight outfalls into an adjacent stream in Yongin City, South Korea. The stormwater management model (SWMM) was calibrated based on the data obtained from a subcatchment within the study area and was further used to simulate the flow rates and TSS discharge rates through a given pipe network for the entire study area. In the simulation, an underground stormwater treatment device was assumed to be installed at each outfall and sized proportional to the average flow rate at the outfall. The total installation cost for the pipes and underground devices was estimated based on empirical formulas using the flow rates and TSS discharge rates simulated by the SWMM. In the demonstration example, the installation cost could be reduced by up to 9% while the annual TSS removal efficiency could be increased by 4% compared to the original pipe network configuration. The annual TSS removal efficiency was relatively insensitive to the total installation cost in the Pareto-optimal solutions of the pipe network design. The results suggested that the installation cost of the pipes and stormwater treatment devices can be substantially reduced without significantly compromising the pollutant removal efficiency when the pipe network is optimally designed.

Enhancing Installation Security for Naval Combat Management System through Encryption and Validation Research

  • Byeong-Wan Lee
    • Journal of the Korea Society of Computer and Information
    • /
    • v.29 no.1
    • /
    • pp.121-130
    • /
    • 2024
  • In this paper, we propose an installation approach for Naval Combat Management System(CMS) software that identifies potential data anomalies during installation. With the popularization of wireless communication methods, such as Low Earth Orbit(LEO) satellite communications, various utilization methods using wireless networks are being discussed in CMS. One of these methods includes the use of wireless network communications for installation, which is expected to enhance the real-time performance of the CMS. However, wireless networks are relatively more vulnerable to security threats compared to wired networks, necessitating additional security measures. This paper presents a method where files are transmitted to multiple nodes using encryption, and after the installation of the files, a validity check is performed to determine if there has been any tampering or alteration during transmission, ensuring proper installation. The feasibility of applying the proposed method to Naval Combat Systems is demonstrated by evaluating transmission performance, security, and stability, and based on these evaluations, results sufficient for application to CMS have been derived.

Contributions of Large-Industrial Enterprise to Demand-Side Management and Economic Analysis on Diffusion of Energy Efficiency Measures (산업체 전력다소비 설비의 수요관리 기여도 및 효율향상 보급에 대한 경제성 평가분석)

  • Kim, Seong-Cheol;Park, Jong-Jin
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.26 no.2
    • /
    • pp.18-26
    • /
    • 2012
  • Though electricity consumption amount in industry has been increased gradually, corresponding power supply show symptoms of marginal point. Importance of demand-side management from large-industries has also been raised. This paper deals with induction motor, which is one of representative examples of heavy electricity consumption utilities, to analyze potential technical capability, economic feasibility from consumers' viewpoint and demand-side management feasibility from nation-wide perspective. Nation-wide economic feasibility analysis was done through California test, which has been used as demand-side management evaluation model. This paper also describes limitation of existing high efficiency induction motor in terms of contribution to demand-side management and utilizes premium motor to calculate demand-side management contribution level and economic feasibility evaluation. Likewise, this paper emphasizes the efficiency improvement of induction motor and analyzes how much premium motor related technologies can contribute to demand-side management.

Design and Implementation of an Efficient Management Scheme for VoIP Terminals in SOHO Environments (SOHO 환경을 위한 효율적인 VoIP 단말 관리 기법 설계 및 구현)

  • Jin, Sang-Woo;Gyeong, Gye-Hyeon;Ko, Kwang-Sun;Eom, Young-Ik
    • The KIPS Transactions:PartC
    • /
    • v.15C no.2
    • /
    • pp.103-110
    • /
    • 2008
  • Internet telephone uses VoIP as its communication protocol, where it provides various additional services with inexpensive fare when the terminal is connected to the Internet. The existing auto provisioning systems that manage Internet telephone terminals are targeting large size VoIP service providers or enterprises, and has few consideration on the convenience of management for small size environments. The difficult installation and management procedures of the current auto provisioning systems prevents Internet telephone system from getting popular. Easy installation and management system is needed in order to spread out Internet telephone system. In this paper, we design and implement the auto provisioning system that provides easy installation and management services in small size environments such as SOHO environments.

Alternatives for Optimum Installation of Rural Sewage Treatment Facilities in Chungchongnam-do Province (충청남도 마을하수처리시설의 최적 설치방안)

  • Yi, Sang-Jin;Jung, Jong-Gwan;Lim, Bong-Su;Huh, Jae-Young
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.19 no.4
    • /
    • pp.462-472
    • /
    • 2005
  • This study was carried out to suggest the plans for installation of rural sewage treatment facilities through the analysis of these facilities installed in Chungchongnam-do Province. About 5% of all installation was carried out by the department of wastewater and related environment problems and the other case was carried out by the department of construction or residence. In wastewater caused by 250 and 300 persons, facilities capacity do not exceed about $50m^3/d$, caused by 2,500 and 3,000 persons, $500m^3/d$. Advanced sewage treatment process were first needed in the discharge area where affected the water environment greatly. However, in carrying out the water quality pollutant of the total amount management system in the other areas, they should be driven only over the scale of pollutant quota object facilities standard. Rural sewage must be included in the special accounts according to the regulations of local government, and sewage treatment cost should be collected to manage. Installation type uses integrating joint treatment method in case the distance among villages is short or one treatment facility independently.

Identification of Factors Influencing the Operability of Precast Concrete Construction Shipment Request Forms

  • Jeong, Eunbeen;Jang, Junyoung;Kim, Tae Wan
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.145-152
    • /
    • 2022
  • Recently, interest in the precast concrete (PC) construction method has been increasing. The PC construction process consists of i) design, ii) production, iii) transportation, and iv) installation. A PC field manager at the site submits a shipment request form to the factory one to three days before the installation of the PC component. Numerous matters should be considered in writing a shipment request form. Incorrect shipment request forms may cause standby resources, waste of resources, premature work conclusion, or excessive work. These issues can lead to an increase in construction costs, replanning of PC component installation, or rework. In order to prevent such problems, PC component installation should be simulated based on the shipment request form. Accordingly, this study aims to identify factors influencing the operability of shipment request forms for PC construction. To this end, this study derived factors influencing i) initiation of the activity, ii) addition or deletion of activities, and iii) an increase or decrease in the activity execution time. As a result, this study identified flow, the features of PC components, condition of PC components, unloading location, installation location, input equipment and labor, number of anchors, number of supports, weather, strike, and accident. Further studies should verify the factors derived in this study based on focus group interviews.

  • PDF

Automated Phase Identification in Shingle Installation Operation Using Machine Learning

  • Dutta, Amrita;Breloff, Scott P.;Dai, Fei;Sinsel, Erik W.;Warren, Christopher M.;Wu, John Z.
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.728-735
    • /
    • 2022
  • Roofers get exposed to increased risk of knee musculoskeletal disorders (MSDs) at different phases of a sloped shingle installation task. As different phases are associated with different risk levels, this study explored the application of machine learning for automated classification of seven phases in a shingle installation task using knee kinematics and roof slope information. An optical motion capture system was used to collect knee kinematics data from nine subjects who mimicked shingle installation on a slope-adjustable wooden platform. Four features were used in building a phase classification model. They were three knee joint rotation angles (i.e., flexion, abduction-adduction, and internal-external rotation) of the subjects, and the roof slope at which they operated. Three ensemble machine learning algorithms (i.e., random forests, decision trees, and k-nearest neighbors) were used for training and prediction. The simulations indicate that the k-nearest neighbor classifier provided the best performance, with an overall accuracy of 92.62%, demonstrating the considerable potential of machine learning methods in detecting shingle installation phases from workers knee joint rotation and roof slope information. This knowledge, with further investigation, may facilitate knee MSD risk identification among roofers and intervention development.

  • PDF

A study on the improvement for installation guide of soundproofing facilities in construction site (공사장 방음시설 설치기준 개선방안에 관한 연구)

  • Park, Young-Min;Kim, Kyoung-Min
    • Journal of Environmental Impact Assessment
    • /
    • v.22 no.4
    • /
    • pp.361-367
    • /
    • 2013
  • Noise and vibration occurs during construction intermittently, but with the most arise complaints. There is a need to efficiently manage the construction noise and vibration problems because in case a residential facility that requires calmness around the construction site adversely affects the living conditions of nearby residents. The ministry of environment has mandating the installation of soundproofing facilities for the management of construction noise. In order to enforce a particular construction, the mandatory install with soundproofing facilities before the start of construction, and after construction. However, Installation guide of soundproofing facilities for construction sites were not considered affected areas by noise and there is no provision of performance evaluation for soundproofing facilities. In this study, investigated the status and problems of the installation guide for soundproofing facilities in construction sites, we propose an efficient installation guide of soundproofing facilities for the reduction construction noise.

Development on Integrated Management System for Outdoor Light Facility (야외 조명시설 통합관리 시스템 개발에 관한 연구)

  • Jeon, Chang-Dae;Chang, Byong-Kun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.20 no.8
    • /
    • pp.15-21
    • /
    • 2006
  • This paper concerns developing an integrated online/offline light facility management system using internet and building a database system for control box and street light. Also, we designed the system to minimize the disparity with the conventional management system by referring to an old management ledger format. Thus, the proposed method may enable the system manager to administer the light facility efficiently and to reduce the manpower and maintenance cost, economically.