고속차량 ATP시스템 개량의 최적화에 관한 연구 (Research about optimal installation of ATP system in High speed Rolling-stock)

  • 유병관
    • 한국철도학회:학술대회논문집
    • /
    • 한국철도학회 2009년도 춘계학술대회 논문집
    • /
    • pp.476-482
    • /
    • 2009
  • A signal equipment improvement project for the existing facility ATS to ATP is under construction in Kyung-Bu and Ho-Nam commercial line including 400 rolling stocks. But there was a concern for the interface between KTX OBCS and ATP from the beginning of the project. At present, this is the front burner event. This paper introduces interface checking and predicted failure point between KTX OBCS and ATP improvement system. Through this measure the optimal installation of the ATP will be possible. The study was made under maintenance efficiency including reliability because the KTX signal equipment must qualify the above condition.

  • PDF

Influence Factors of Aerial Environment on Project Schedule Management

  • Hong, Jun-pyo;Lim, Hyoung-chul
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.608-611
    • /
    • 2015
  • The objectives of this research are 1) control of schedule or improvement of management for aerial environment, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall-based apartment buildings and in column-based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

  • PDF

CMMI 기반 프로세스 지원 시스템 설계 (Design of Process Support System based on CMMI)

  • 최동희
    • 한국군사과학기술학회지
    • /
    • 제12권3호
    • /
    • pp.344-353
    • /
    • 2009
  • In this paper, I have proposed a design of process support system based on CMMI process which can support integrated management and repository for CMMI model processes. The system assists small organization to improve business process and offers institutionalized automatic environment to users for use of CMMI processes. The proposed system also can enhance quality and productivity of project by including features such as convenience of project management, planned project administration and steady process improvement.

Analysis of Quality Improvement Priority for Construction PMIS

  • An, Hyo-Kyung;Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • 한국건축시공학회지
    • /
    • 제12권1호
    • /
    • pp.10-21
    • /
    • 2012
  • As one of the key IT applications, the project management information system (PMIS) played a significant role in construction management processes in Korea. On increasing use of PMIS, regular quality assessment to identify user's requirements of PMIS is necessary. However, there have been rare research efforts for quality assessment for the construction PMIS. This paper aims to propose a priority index of quality improvement for construction PMIS using the importance and satisfaction measures and to verify the discrimination power of the priority index by comparing it with other quality improvement priority index. In addition, this paper discusses some possible ways of PMIS quality improvement. The analysis of quality improvement priority was based on a questionnaire responded by 253 PMIS users (construction managers and constructors). The methods of PMIS improvement were based on the interviews with eight experts. These findings would be the foundation of further researches on PMIS quality improvement. However, more efforts are required to enhance the priority index, in terms of reflecting weighted values of quality assessment factors.

공사 진척관리 현황분석을 통한 진척관리 개선방안에 관한 연구 (A Study on the Improvement through Analysis with Present Condition of Progress Management for Construction Project)

  • 박원호;심재광;윤석헌
    • 한국건축시공학회지
    • /
    • 제10권3호
    • /
    • pp.137-144
    • /
    • 2010
  • 건설 프로젝트가 대형 복잡화가 되어짐에 따라 프로젝트의 공정관리의 중요성이 대두되고 있다. 프로젝트 공정관리 기술은 한국에서 널리 사용되고 있지 않지만 점차적으로 증가하고 있는 추세다. 요즘 대부분의 연구 프로젝트들도 공정쪽에 초점을 두고 있다. 프로젝트 진척관리 또한 프로젝트 공정관리의 하나로써 매우 중요하다. 이에 본 연구에서는 국내 진척관리의 상태를 분석하기로 하며 진척관리의 현재 상태에 대해 전문가와 현장사람들에 대한 인터뷰를 진행하였다. 본 연구는 질적, 양적으로 프로젝트 진척분석을 위한 방법으로 BIM 기반의 진척관리를 제안하고 있다. 현재 BIM은 설계, 시공, 유지관리단계등에서 사용되고 있으며 또한 BIM을 이용한 진척관리는 프로젝트에 대해 이해하고 정확성을 키우는데 이바지 할 것이라고 생각된다.

공공 S/W 분야에서 프로젝트 관리자의 역량이 성과에 미치는 영향 (The Effect of Project Managers' Competences on Performance in Public S/W)

  • 오민정;주형준;이민호
    • 산업경영시스템학회지
    • /
    • 제44권3호
    • /
    • pp.230-239
    • /
    • 2021
  • There is a growing interest in project management knowledge, project management information systems, and process improvement to systematically project execution in public sectors, achieve high performance and value, and increase the effectiveness of the overall industry. In particular, the software industry is a knowledge-intensive industry centered on professional manpower. This study examines the effect of the project managers' competences of regional SW promotion agencies on and project performance and the moderating effect of the level of project management maturity. We collected data using a questionnaire to the project managers of regional SW promotion agencies. In this study, a structural equation model was used to analyze the relationship between project managers' competences and performance. In addition, a multi-group structural equation model was used to analyze the moderating effect according to the high and low project maturity. As a result of the analysis, it was found that only contextual competence among the competences of the project manager had a positive effect on project performance. It was found that technical and behavioral competence did not have a positive effect on management and completion performance. It was found that the moderating effect according to the maturity of business management of local institutions was not significant.

SUCCESS FACTORS FOR URBAN REGENERATION PROJECT

  • Hae-Rim Kwon;Seul-Ki Lee;Jung-Ho Yu
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1515-1520
    • /
    • 2009
  • Objective of Urban regeneration project is a recovery of urban utilities through a physical, environmental, cultural, industrial and economic regeneration. The current paradigm of urban regeneration is not a simple redevelopment as physical redevelopment or improvement. Urban regeneration project is an overall development including a central commercial capacity and business capacity for administration and management, cultural facilities, sightseeing, a residential area. So Urban regeneration project include a various project. Project management of Urban Regeneration project is widely different with general project management. For that purpose, this research would offer to contribute the success factors of urban regeneration project for successful project. For offering these, this research analyzed the properties of urban regeneration project and success factors of construction project by reviewing a literature. The principal characteristics are variety objectives of each district of urban regeneration project, a diversity of stakeholder's objectives and complex structure of stakeholders, an unstructured decision-making system, a lack of plan for business cooperation. We abstracted factors for urban regeneration from brainstorming and verification by experienced experts. We suggest 2 factors related to achieving a goal effectively and 10 factors related to progress of urban regeneration project efficiently.

  • PDF

중소 소프트웨어 기업의 개선 대상 SW 프로세스 선정 (Improvement Target SW Process Selection for Small and Medium Size Software Organizations)

  • 이양규;김종우;권원일;정창신;배세진
    • 정보처리학회논문지D
    • /
    • 제9D권5호
    • /
    • pp.887-896
    • /
    • 2002
  • SPICE(Software Process Improvement and Capability dEtermination) 평가 모형에 기반한 중소기업형 프로세스 개선 모형으로 SPIRE (Software Process Improvement in Regions of Europe)가 개발되어 제공되고 있다. 그러나 SPIRE에서는 조직의 경영 목적에 맞는 프로세스 선택을 위한 구체적인 지침이나 매핑을 제시하고 있지 못하다. 이 연구에서는 프로세스 선택시 활용할 수 있는 객관적인 경영 목표-프로세스간 매핑 참조 테이블을 작성하고, 이를 활용한 프로세스 선정 방안을 제시한다. 매핑 참조 테이블은 델파이 기법을 활용하여 국내 소프트웨어 프로세스 전문가들의 의견 수렴을 통해 작성되었다. 본 연구에서 제시된 프로세스 선정 기법은 매핑 참조 테이블과 해당 업체 관련자의 주관적인 매핑 정보를 종합적으로 활용하여 최종적으로 개선 대상 프로세스를 선정되도록 한다. 이 연구에서 제시된 선정 방법을 2개의 중소 소프트웨어 조직에 실제 적용하여 활용 가능성을 검토하였다. 매핑 참조 테이블을 사용하여 업체 관련자가 간과하고 있던 주요 프로세스를 평가 대상 프로세스로 선정할 수 있었다.

A Looping Population Learning Algorithm for the Makespan/Resource Trade-offs Project Scheduling

  • Fang, Ying-Chieh;Chyu, Chiuh-Cheng
    • Industrial Engineering and Management Systems
    • /
    • 제8권3호
    • /
    • pp.171-180
    • /
    • 2009
  • Population learning algorithm (PLA) is a population-based method that was inspired by the similarities to the phenomenon of social education process in which a diminishing number of individuals enter an increasing number of learning stages. The study aims to develop a framework that repeatedly applying the PLA to solve the discrete resource constrained project scheduling problem with two objectives: minimizing project makespan and renewable resource availability, which are two most common concerns of management when a project is being executed. The PLA looping framework will provide a number of near Pareto optimal schedules for the management to make a choice. Different improvement schemes and learning procedures are applied at different stages of the process. The process gradually becomes more and more sophisticated and time consuming as there are less and less individuals to be taught. An experiment with ProGen generated instances was conducted, and the results demonstrated that the looping framework using PLA outperforms those using genetic local search, particle swarm optimization with local search, scatter search, as well as biased sampling multi-pass algorithm, in terms of several performance measures of proximity. However, the diversity using spread metric does not reveal any significant difference between these five looping algorithms.

조직의 SEPMC 자체 평가에 유용한 참조기준 개발 (On the Development of Reference Guidelines for Self-evaluation of Organization's Systems Engineering and Project Management Capability)

  • 최영길;이재천
    • 시스템엔지니어링학술지
    • /
    • 제8권2호
    • /
    • pp.27-36
    • /
    • 2012
  • In modern systems, the operational capability of the system to the user needs is expanding rapidly to accommodate the size of the system, functionality, and interfaces are becoming increasingly complex. Accordingly, the systematic practice of project management and systems engineering in the system development process, as an important element in successful systems development is recognized. EIA/ANSI 632, ISO/IEC15288, the leading international standard for systems engineering and is the leading international standard on project management PMBOK. CMMI is also contains information about the activities of project management and systems engineering and worldwide basis to assess the maturity of an organization's ability to develop system being used. But CMMI model is too complex of structure and there are many overlap parts of contents. So there are many problems for members of organization understanding all of CMMI model, applying organization and, achieving improvement activity. In this study, through the analysis and integration between the model and the related standard coverage activities essential for successful systems development in organizations that require systems engineering and project management capabilities(SEPMC) for self-assessment and continuous improvement activities to provide useful reference guideline.