Kim, Jung-Ho;Jang, Ji-Hye;Jin, Liyan;Ha, Pan-Bong;Kim, Young-Hee
Journal of the Korea Institute of Information and Communication Engineering
/
v.14
no.11
/
pp.2541-2547
/
2010
In this paper, we propose a design technique which replaces logic transistors of 1.2V with medium-voltage transistors of 3.3V having small off-leakage current in repetitive block circuits where speed is not an issue, to implement a low-power eFuse OTP memory IP in the stand-by state. In addition, we use dual-port eFuse cells reducing operational current dissipation by reducing capacitances parasitic to RWL (Read word-line) and BL (Bit-line) in the read mode. Furthermore, we propose an equivalent circuit for simulating program power injected to an eFuse from a program voltage. The layout size of the designed 512-bit eFuse OTP memory IP with a 90nm CMOS image sensor process is $342{\mu}m{\times}236{\mu}m$. It is confirmed by measurement experiments on 42 samples with a program voltage of 5V that we get a good result having 97.6 percent of program yield. Also, the minimal operational supply voltage is measured well to be 0.9V.
Kim, Eun-Min;Lee, Seung-Hwan;Cho, Dae-Kweon;Kim, Shin-Hyo
The Transactions of The Korean Institute of Electrical Engineers
/
v.63
no.8
/
pp.1070-1074
/
2014
With the development of the electronics industry and widespread supply of many different electrical appliances, the factors of the electrical fires are also diversified. For this reason, the fuse, safety-critical component, needs accurate and stable operating characteristics for preventing various fire factor, and also needs various operating characteristics. Especially when the all electrical resistance are dropped by internal short of circuit, high current inrushes and makes the fire. In order to prevent this, very fast acting fuses should be applied. However, existing very fast acting characteristics fuse has less wire dimension of element Ag100% metal than that of fast acting fuse, and it is made of plating with low melting point metals, so it satisfy very fast acting but it can't satisfy durability and safety. For this reason, in this study, through the analyzing fusing characteristics of Ag-Cu alloy composition, the new alloy composition, which implement to very fast acting fuse without decrease of fuse elements dimension, is suggested. And this study classify the operating characteristics changes, a resistance change, and the rated current of the fuse in the overall composition change of Ag-Cu alloying. and it can be utilized for designing fuse.
Journal of the Korea Academia-Industrial cooperation Society
/
v.15
no.6
/
pp.3827-3831
/
2014
This paper aims to solve the problem deterioration of power fuses. The deterioration of a power fuse is a cause of failure misoperation by a normal current flowing reduplicatively to fuse the element. An extension survey of a load feature rerating power fuse examined the power fuse deterioration removal, the cause of the deterioration of the power fuse, the front-after, and the thermal variation of the inside transformer room electric power equipment. The transformer showed an average improvement of $6[^{\circ}C]$. The temperature of the electrical line showed $7{\sim}8[^{\circ}C]$ improvement. The static condenser and direct reactor was $2{\sim}3[^{\circ}C]$ high-state maintenance the temperature and equipment syntonization relationship. In the subject of study $0.5{\sim}1.0[^{\circ}C]$ stabilizing three phase power fuse temperature differential was. Suggestion in the transformer room environment power equipment between the cause temperature happen elimination to deterioration of power fuse and temperature rise control.
Journal of the Korea Academia-Industrial cooperation Society
/
v.17
no.7
/
pp.623-628
/
2016
Because the log information provides some critical clues for solving the problem of illegal system access, it is very important for a system administrator to gather and analyze the log data. In a Linux system, the syslog utility has been used to gather various kinds of log data. Unfortunately, there is a limitation that a system administrator should rely on the services only provided by the syslog utility. To overcome this limitation, this paper suggests a syslog agent that allows the system administrator to gather log information for file access that is not serviced by syslog utility. The basic concept of the suggested syslog agent is that after creating a FUSE, it stores the accessed information of the files under the directory on which FUSE has been mounted into the log file via syslog utility. To review its functional validity, a FUSE file system was implemented on Linux (Ubunt 14.04), and the log information of a file access was collected and confirmed.
Journal of the Korea Institute of Information and Communication Engineering
/
v.16
no.8
/
pp.1734-1740
/
2012
In this paper, we propose a FSOURCE circuit which requires such a small switching current that an eFuse OTP memory can be programmed in the post-package state of the PMIC chips using a single power supply. The proposed FSOURCE circuit removes its short-circuit current by using a non-overlapped clock and reduces its maximum current by reducing the turned-on slope of its driving transistor. Also, we propose a DOUT buffer circuit initializing the output data of the eFuse OTP memory with arbitrary data during the power-on reset mode. We design a 24-bit differential paired eFuse OTP memory which uses Magnachip's $0.35{\mu}m$ BCD process, and the layout size is $381.575{\mu}m{\times}354.375{\mu}m$($=0.135mm^2$).
Kim, Myoung-Hoo;Kim, Jin-Seok;Moon, Jong-Fil;Lim, Sung-Hun;Kim, Jae-Chul;Lee, Joon-Kyu
The Transactions of The Korean Institute of Electrical Engineers
/
v.59
no.3
/
pp.499-505
/
2010
This paper analyzed that the coordination of recloser-fuse when a superconducting fault current limiter (SFCL) is installed to a power distribution system linked small scale cogeneration system. As a rule, the recloser to properly protect against both permanent and temporary fault is installed to upstream of fuse. Therefore, in a power distribution system linked small scale cogeneration system, the fault current is increased by adding fault current of small scale Cogeneration system when a permanent fault occurs, and the fuse could melt during the first fast operation of the recloser because of more sufficient heat from the increased current. However, when SFCLs are applied into a power distribution system linked small scale cogeneration system, the coordination of recloser-fuse could be accomplished due to decreased fault current as the effect of the impedance value of the SFCL. Therefore, to solve these problems, we analysed the operation of recloser-fuse coordination in a power distribution system linked small scale cogeneration system with SFCL using PSCAD/EMTDC.
The Proceedings of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.11
no.6
/
pp.74-80
/
1997
In this paper, we deal with the I -t characteristic of low voltage distribution fuse (line fuse). That fuse element has two parts;One is low temperature melting element(LTME) to put up with over current and the other is high temperature melting element (HTME) which put up with large current. Melting charateristic of fuse is determined by L TME and HTME. So we verified their properties of fuse design, mathematically, by simulating the thermal and electric characteristics of each other. We simulated the I-t characteristic of line fuse by using the numerical method;Finite Element Method(FEM). Then, we could acquire very similar result at the HTME and L TME area when compared the simlation result with experimental one.
The Transactions of The Korean Institute of Electrical Engineers
/
v.67
no.12
/
pp.1619-1625
/
2018
Portable electronic devices secondary batteries can cause fire and explosion due to micro-current change in addition to the situation of short-circuit inrush current, safety can not be secured with a general operation limited current fuse. Therefore, in secondary battery, it is necessary for the protector to satisfy both the limit current type operation in the open-short-circuit inrush current and the current detection operation characteristic in the micro current change situation and for this operation, a fuse for the current detection type secondary battery protection circuit can be applied. The purpose of this study is to design a protection device that operates stably in the hazardous situation of small capacity secondary battery for portable electronic devices through the design of low melting fuse elements alloy of sensing type fuse and secures stability in abnormal current state. As a result of the experiment, I-T and V-T operation characteristics are satisfied in a the design of the alloy of the current sensing type self-contained low melting point fuse and the resistance of the heating resistor. It is confirmed that it can prevent accidents of short circuit over-current and micro current change of secondary battery.
Park, Heon;Lee, Seung-Hoon;Jin, Kyo-Hong;Ha, Pan-Bong;Kim, Young-Hee
The Journal of Korea Institute of Information, Electronics, and Communication Technology
/
v.8
no.2
/
pp.107-115
/
2015
In this paper, a small-area 32-bit differential paired eFuse OTP memory for power ICs is designed. In case of smaller number of rows than that of columns for the OTP memory cell array, a scheme for the cell array reducing the number of SL driver circuits requiring their larger layout areas by routing the SL (source line) lines supplying programming currents for eFuse links in the row direction instead of the column direction as well as a core circuit is proposed. In addition, to solve a failure of being blown for non-blown eFuse links by the electro-migration phenomenon, a regulated voltage of V2V ($=2V{\pm}0.2V$) is used to a RWL (read word line) driver circuit and a BL (bit line) pull-up driver circuit. The layout size of the designed 32-bit eFuse OTP memory is $228.525{\mu}m{\times}105.435{\mu}m$, which is confirmed to be 20.7% smaller than that of the counterpart using the conventional cell array routing, namely $197.485{\mu}m{\times}153.715{\mu}m$.
Journal of the Korea Institute of Information and Communication Engineering
/
v.18
no.8
/
pp.1914-1924
/
2014
In this paper, a small-area cell array method of reducing number of SL drivers requiring large layout areas, where the SL drivers supplying programming currents are routed in the row direction in stead of the column direction for eFuse OTP memory IPs having less number of rows than that of columns such as a cell array of four rows by eight columns, and a core circuit are proposed. By adopting the proposed cell array and core circuit, the layout area of designed 32-bit eFuse OTP memory IP is reduced. Also, a V2V ($=2V{\pm}10%$) regulator necessary for RWL driver and BL pull-up load to prevent non-blown eFuse from being blown from the EM phenomenon by a big current is designed. The layout size of the designed 32-bit OTP memory IP having a cell array of four rows by eight columns is 13.4% smaller with $120.1{\mu}m{\times}127.51{\mu}m$ ($=0.01531mm^2$) than that of the conventional design with $187.065{\mu}m{\times}94.525{\mu}m$ ($=0.01768mm^2$).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.