• Title/Summary/Keyword: expected cost

Search Result 3,020, Processing Time 0.024 seconds

Replacement model under warranty with age-dependent minimal repair

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • v.18 no.1
    • /
    • pp.9-20
    • /
    • 2017
  • In this paper, we consider a renewable repair-replacement warranty strategy with age-dependent minimal repair service and propose an optimal maintenance model during post-warranty period. Such model implements the repair time limit under warranty and follows with a certain form of system maintenance strategy when the warranty expires. The expected cost rate is investigated per unit time during the life period of the system as for the standard for optimality. Based on the cost design defined for each failure of the system, the expected cost rate is derived during the life period of the system, considering that a renewable minimal repair-replacement warranty strategy with the repair time limit is provided to the customer under warranty. When the warranty is finished, the maintenance of the system is the customer's responsibility. The life period of the system is defined and the expected cost rate is developed from the viewpoint of the customer's perspective. We obtain the optimal maintenance strategy during the maintenance period by minimizing such a cost rate after a warranty expires. Numerical examples using field data are shown to exemplify the application of the methodologies proposed in this paper.

  • PDF

Optimum Life Cycle Cost Design of Steel Box Girder Bridges (강상형교의 최적 Life Cycle Cost 설계)

  • 조효남;민대홍;김구선
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1998.10a
    • /
    • pp.151-158
    • /
    • 1998
  • This paper presents an optimal decision model for minimizing the life-cycle cost of steel box girder bridges. The point is that it takes into account service life process as a whole, and the life-cycle costs include initial (design, testing, and construction) costs, maintenance costs and expected failure costs. The problem is formulated as that of minimization of expected total life-cycle cost with respect to the design variables. The optimal solution identifies those values of the decision variables that result in minimum expected total cost. The performance constraints in the form of flexural failure and shear failure are those specified in the design code. Based on extensive numerical investigations, it may be positively stated that the optimum design of steel box girder bridges based on life-cycle cost approach proposed in this study provides a lot more rational and economical design, and thus the proposed approach will propose the development of new concepts and design methodologies that may have important implications in the next generation performance-based design codes and standards.

  • PDF

Cost Analysis Model with Minimal Repair of Spare Unit Repair Policy under Periodic Maintenance Policy (정기보전 제도에서 응급수리를 고려한 대체품 수리정책에서의 비용분석 모델)

  • Kim Jae-Joong
    • Journal of Applied Reliability
    • /
    • v.6 no.2
    • /
    • pp.151-161
    • /
    • 2006
  • This article is concerned with cost analysis model in periodic maintenance policy. The repair policy is differently applied according as unit importance during an item being used and unit restoration during an item being failed. So in this paper the repair policy with minimal repair is considered as follow : as the occurrence of failure between minimal repair and periodic interval time, unit is replaced by a spare unit until the periodic maintenance time arrived. Then total expected cost per unit time is calculated according to scale parameter of failure distribution in a view of customer's. The total expected costs are included repair and usage cost : operating, fixed, minimal repair, periodic maintenance and spare unit cost. Numerical example is shown in which failure time of item has Erlang distribution.

  • PDF

Assessment of Reliability in the Distribution System of an Industrial Complex

  • Choi, Sang-Bong
    • Journal of Electrical Engineering and Technology
    • /
    • v.2 no.2
    • /
    • pp.201-207
    • /
    • 2007
  • As the power industry moves towards open competition, there has been a need for methodology to evaluate distribution power system reliability by using customer interruption costs, particularly in power supply zones under the competitive electricity market. This paper presents an algorithm to evaluate system average interruption duration index, expected energy not supplied, and system outage cost taking into consideration failure rate of the distribution facility and industrial customer interruption cost. Also, to apply this algorithm to evaluate system outage cost presented in this paper, the distribution arrangement of a dual supply system consisting of mostly high voltage customers in an industrial complex in Korea is used as a sample case study. Finally, evaluation results of system interruption cost, system average interruption duration index, and expected energy not supplied in the sample industrial complex area are shown in detail.

Optimal Periodic Preventive Maintenance with Improvement Factor (개선지수를 고려한 주기적 예방보전의 최적화에 관한 연구)

  • Jae-Hak Lim
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.3
    • /
    • pp.193-204
    • /
    • 2003
  • In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate but remains the pattern of hazard rate unchanged. And the system undergoes only minimal repairs at failures between PM's. The expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

Optimum Safety Indices Based On Expected Total Cost Minimization (총기대비용 최소화원칙에 의한 최적신뢰성지수)

  • 이증빈;신형우;장석모
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1993.10a
    • /
    • pp.216-223
    • /
    • 1993
  • The safety factors of current standard code are considered to be not appropriate compared to design and construction practices, even this safety factors are not determined from probabilistic study but merely from experiences and practices. This study pripose the optimum safety indices based on expected total cost minimization using only three parameters, which are the level of the failure cost to the initial cost by improvement in safety, and the order of the initial cost function.

  • PDF

Optimal Burn-In under Warranty

  • Kim, Kuinam-J;Park, Chi-Yeon
    • Journal of the Korea Safety Management & Science
    • /
    • v.1 no.1
    • /
    • pp.135-143
    • /
    • 1999
  • This paper discusses an optimal burn-in procedure to minimize total costs based on the assumption that the failure rate pattern follows a bimodal mixed Weibull distribution. The procedure will consider warranty period as a factor of the total expected bum-in cost. A cost model is formulated to find the optimal burn-in time that minimizes the expected burn-in cost. Conditional reliability for warranty period will be discussed. An illustrative example is included to show how to use the cost model in practice.

  • PDF

Extended warranty model under minimal repair-replacement warranty policy

  • Jung, Ki Mun
    • International Journal of Reliability and Applications
    • /
    • v.18 no.1
    • /
    • pp.1-8
    • /
    • 2017
  • In this paper, we study an extended warranty model under minimal repair-replacement warranty (MRRW) which is suggested by Park, Jung and Park (2013). Under MRRW policy, the manufacturer is responsible for providing the minimal repair-replacement services upon the system failures during the warranty period. And if the failure occurs during the extended warranty period, only the minimal repair is conducted. Following the expiration of extended warranty, the user is solely responsible for maintaining the system for a fixed length of time period and replaces the system at the end of such a maintenance period. During the maintenance period, only the minimally repair is given for each system failure. The main purpose of this article is to suggest the extended warranty and replacement model with MRRW. Given the cost structures incurred during the life cycle of the system, we formulate the expected cost and the expected length of life cycle to obtain the expected cost rate.

  • PDF

Cost-Utility of "Doxorubicin and Cyclophosphamide" versus "Gemcitabine and Paclitaxel" for Treatment of Patients with Breast Cancer in Iran

  • Hatam, Nahid;Askarian, Mehrdad;Javan-Noghabi, Javad;Ahmadloo, Niloofar;Mohammadianpanah, Mohammad
    • Asian Pacific Journal of Cancer Prevention
    • /
    • v.16 no.18
    • /
    • pp.8265-8270
    • /
    • 2016
  • Purpose: A cost-utility analysis was performed to assess the cost-utility of neoadjuvant chemotherapy regimens containing doxorubicin and cyclophosphamide (AC) versus paclitaxel and gemcitabine (PG) for locally advanced breast cancer patients in Iran. Materials and Methods: This cross-sectional study in Namazi hospital in Shiraz, in the south of Iran covered 64 breast cancer patients. According to the random numbers, the patients were divided into two groups, 32 receiving AC and 32 PG. Costs were identified and measured from a community perspective. These items included medical and non-medical direct and indirect costs. In this study, a data collection form was used. To assess the utility of the two regimens, the European Organization for Research and Treatment of Cancer Quality of Life Questionnaire-Core30 (EORTC QLQ-C30) was applied. Using a decision tree, we calculated the expected costs and quality adjusted life years (QALYs) for both methods; also, the incremental cost-effectiveness ratio was assessed. Results: The results of the decision tree showed that in the AC arm, the expected cost was 39,170 US$ and the expected QALY was 3.39 and in the PG arm, the expected cost was 43,336 dollars and the expected QALY was 2.64. Sensitivity analysis showed the cost effectiveness of the AC and ICER=-5535 US$. Conclusions: Overall, the results showed that AC to be superior to PG in treatment of patients with breast cancer, being less costly and more effective.

Workforce Entry Preparers' Post-College Housing Expectations and Perception of Housing Cost Burden (예비 사회진출자의 졸업 후 주거에 대한 기대 및 주거비 부담에 대한 인식)

  • Lee, Hyun-Jeong
    • Journal of the Korean housing association
    • /
    • v.24 no.4
    • /
    • pp.29-37
    • /
    • 2013
  • The purpose of this study was to explore college students' expectations on post-college housing and sources of finance to afford housing costs; and perception of housing cost burden. Between May 28, 2012, and June 17, 2012, a questionnaire survey was conducted to undergraduate students in university-A located in non-capital region and 465 useable responses were collected. Major findings are as follows: (1) About 60% of respondents expected to live apart from their parents or relatives within two years from college graduation; (2) Majority of respondents who expected to live apart from their parents or relatives expected to rent housing units and compact non-traditional housing types such as studio units; (3) Major source of finance the respondents expected to afford post-college housing costs was financial supports from their parents and families; (4) Housing cost burden were perceived to have influence even on job decision and respondents with lower parents' income perceived housing cost burden more influential; and (5) In spite of respondents' low financial independence to afford post-college housing costs, finding housing units in areas with relatively lower housing costs seemed not to be an important consideration when choosing post-college housing.