Optimal Periodic Preventive Maintenance with Improvement Factor

개선지수를 고려한 주기적 예방보전의 최적화에 관한 연구

  • Jae-Hak Lim (Department of Accounting, Hanbat National University)
  • Published : 2003.09.01

Abstract

In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate but remains the pattern of hazard rate unchanged. And the system undergoes only minimal repairs at failures between PM's. The expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

Keywords

References

  1. Barlow, R. E. and Hunter, L. C.(1960), 'Preventive MaintenancePolicies,' Operations Research, Vol. 9,pp. 90-100
  2. Brown, M. and Proschan, F. (1983),'Imperfect Repair,' J. of AppliedProbability, Vol. 20, pp. 851-859 https://doi.org/10.2307/3213596
  3. Canfield, R. V. (1986), 'CostOptimization of Periodic PreventiveMaintenance,' IEEE Trans. Reliability,Vol. 35, pp. 78-81 https://doi.org/10.1109/TR.1986.4335355
  4. Chan, P. K. W. and Down, T. (1978),'Two Criteria for PreventiveMaintenance,' IEEE Trans. Reliability,Vol. 35, pp. 272-273
  5. Charles, A., Floru, I., Azzaro-Pantel,C., Pibouleau L. and Domenech S.(2003), 'Optimization of preventivemaintenance strategies in amultipurpose batch plant: applicationto semiconductor manufacturing,'Computers & Chemical Engineering,Vol. 27, No. 4, pp. 449-467 https://doi.org/10.1016/S0098-1354(02)00216-8
  6. Fontenot, R. A. and Proschan, F.(1984), 'Some Imperfect Maintenance Model' in Reliability Theory andModels, AP, New York
  7. Lai, K. K., Leung, K. N. F., Tao, B.and Wang, S. Y.(2000), 'Practices of preventive maintenance andreplacement for engines: A casestudy,' European Journal ofOperational Research, Vol. 124, No. 2,pp. 294-306 https://doi.org/10.1016/S0377-2217(99)00382-3
  8. Lie, C. H. and Chun, Y. H. (1986),'An Algorithm for Preventive Maintenance Policy,' IEEE Trans. Reliability, Vol. 35, pp. 71-75 https://doi.org/10.1109/TR.1986.4335352
  9. Murthy, D. N. P. and Nguyen, D. G.(1981), 'Optimum Age-Policy withImperfect Preventive Maintenance,'IEEE Trans. Reliability, Vol. 30, pp.80-81 https://doi.org/10.1109/TR.1981.5220976
  10. Nakagawa, T. (1979), 'Optimal PolicyWhen Preventive Maintenance IsImperfect,' IEEE Trans. Reliability,Vol. 28, pp. 331-332 https://doi.org/10.1109/TR.1979.5220624
  11. Nakagawa, T. (1980), 'A Summaryof Imperfect Preventive MaintenancePolicies with Minimal Repair,'R.A.I.R.O. Operations Research, Vol.14, pp. 249-255
  12. Nakagawa, T. (1986), 'Periodic andSequential Preventive MaintenancePolicies,' J. of Applied Probability,Vol. 23, pp. 536-542 https://doi.org/10.2307/3214197
  13. Nakagawa, T. (1988), 'SequentialImperfect Preventive MaintenancePolicies,' IEEE Trans. Reliability, Vol.37, No. 3, pp. 295-298 https://doi.org/10.1109/24.3758
  14. Park, D. H., Jung, G. M. and Yum,J. K.(2000), 'Cost Minimization forPeriodic Maintenance Policy of aSystem Subject to SlowDegradation,' Reliability Engineeringand System Safety, Vol. 68, pp.105-112 https://doi.org/10.1016/S0951-8320(00)00012-0