• Title/Summary/Keyword: excavation method

Search Result 1,058, Processing Time 0.038 seconds

가설흙막이의 버팀대 선행하중량과 흙막이 벽체 변형등에 대한 분석

  • Kim, Hak-Cheong;Jeong, Gwang-Ryeol
    • 기술발표회
    • /
    • s.2006
    • /
    • pp.35-44
    • /
    • 2006
  • Supporting method of a Temporary retaining wall for underground excavation project are adopted by systems of strut, anchor, nail, raker, etc. Strut system and Raker system of these methods are mostly used preloading jack to minimize deformations of retaining wall. We determinate efficient preloading to analysis these strut-preloadings, deformations of retaining wall, axial forces, and etc.. This study is analysed that preloading applied 0%, 10%, 20%, 30%, ...., 100% for strut and raker installed by CIP temporary retaining wall. This study results that adequate preloadings were determined to analysis correlations of preloading, deformations of wall, maximum bending moment, axial force of strut, and displacement of surrounding.

  • PDF

The stability analysis on large sectional tunnel station considering construction steps (시공단계를 고려한 대단면 정거장 터널 안정성 해석)

  • Kang, Eun-Gu;Kim, Yang-Woon;Ahn, Kyeong-Cheol;Han, Myeong-Sik
    • Proceedings of the KSR Conference
    • /
    • 2009.05a
    • /
    • pp.1062-1068
    • /
    • 2009
  • Urban construction has numerous difficulties due to ground weakness and various complaints from third party, so it is not economically efficient and constructability is not favorable. Therefore, underground, which has good ground conditions, was used for construction field and facilities such as stations, and they are scaled up to enhance accommodation of facility limitation and function of stations. Large section tunnel station construction has numerous risk factors such as work boundary of excavation equipment, a relaxation of stress concentration, a safety plan of tunnel stability, and so on. Therefore, by using large section tunnel station stability analysis considering construction step, we expect to analyze the latent problem during construction, and to stabilize a future project plan of a large section structure design by using an auxiliary method and a support design.

  • PDF

Supplementation of Regulation on the Offshore Oil Pipeline for Maintenance (해저 송유배관 유지관리를 위한 기준 보완 제시)

  • Kang, Chan-Seong;Moon, Seung-Jae
    • Plant Journal
    • /
    • v.8 no.2
    • /
    • pp.70-81
    • /
    • 2012
  • The study aims to supplement facility management plan and safety regulations & standard of oil pipeline by searching and reviewing related regulation & standard inside and outside of the country. Korean regulation & standard is reviewed based on harbor and fishery design standard of the ministry of maritime affairs and fisheries, general technology standard of oil pipeline safety regulation, gas excavation construction and safety maintenance indicator of Korea gas corporation. Global regulation & standard is reviewed based on U.S standard inspection for offshore pipeline and Europe/Mexico standard inspection for offshore pipeline. The contents of offshore pipeline installation is inserted into pipeline sector for objected facilities of safety inspection regulation & standard and, the standard of safety inspection for offshore pipeline is newly presented into pipeline maintenance part of the planning facilities management with its inspection period and method.

  • PDF

A Study on the Bucket Tip's Position Control for the Intelligent Excavation System (지능형 굴삭 시스템의 버킷 끝단 위치제어에 관한 연구)

  • Kim, K.Y.;Jang, D.S.;Ahn, H.S.
    • Transactions of The Korea Fluid Power Systems Society
    • /
    • v.5 no.4
    • /
    • pp.32-37
    • /
    • 2008
  • For the bucket tip position control of the excavator, a traditional hydraulic excavator system was exchanged into an electro-hydraulic one. EPPR valves are attached to the traditional MCV and hydraulic joysticks are replaced by electronic ones to develop the electro-hydraulic system. To control the electronic pump with a good performance, the control logic for the pump is deduced from the AMESim simulation and the experimental method on the test bench. To get a good position control performance of the excavator bucket tip, PI+AntiWindup controller is selected as a position controller. The experimental results showed the good controllability for the electro-hydraulic excavator system on the test bench.

  • PDF

A Study for Safety Work Control System in the Narrow Space (협소 공간 작업을 위한 안전제어 시스템에 관한 연구)

  • Cho, Y.S.;Kim, H.S.;Song, I.S.;Jeong, C.S.;Yang, S.Y.
    • 유공압시스템학회:학술대회논문집
    • /
    • 2010.06a
    • /
    • pp.62-65
    • /
    • 2010
  • Field robot represented by excavator can be applied for various working in manufacturing, construction, agriculture etc. Because of the flexibility of its multi-joint mechanism and the high power of hydraulic actuators. Since the excavator operates in the hazardous working circumstance, operators exposed in harmful environment. Therefore, automation system has been investigated to protect from the harmful environment. In this paper, the method to construct the remote control system is proposed. The remote control system is consisted of a manual and auto mode. Manual mode controls a hydraulic cylinder as open loop control. and auto mode controls the end effecter of excavator using tracking control system. The efficiency of remote control system was evaluated through the field test.

  • PDF

Multivariate adaptive regression splines model for reliability assessment of serviceability limit state of twin caverns

  • Zhang, Wengang;Goh, Anthony T.C.
    • Geomechanics and Engineering
    • /
    • v.7 no.4
    • /
    • pp.431-458
    • /
    • 2014
  • Construction of a new cavern close to an existing cavern will result in a modification of the state of stresses in a zone around the existing cavern as interaction between the twin caverns takes place. Extensive plane strain finite difference analyses were carried out to examine the deformations induced by excavation of underground twin caverns. From the numerical results, a fairly simple nonparametric regression algorithm known as multivariate adaptive regression splines (MARS) has been used to relate the maximum key point displacement and the percent strain to various parameters including the rock quality, the cavern geometry and the in situ stress. Probabilistic assessments on the serviceability limit state of twin caverns can be performed using the First-order reliability spreadsheet method (FORM) based on the built MARS model. Parametric studies indicate that the probability of failure $P_f$ increases as the coefficient of variation of Q increases, and $P_f$ decreases with the widening of the pillar.

Estimation of the Anisotropic Material Properties of Rock Masses with Permeation Grouting (그라우팅 강화터널의 설계 특성치 산정에 관한 연구)

  • Lee, Jun Seok;Bang, Chun Seok;Choe, Il Yun;Eom, Ju Hwan
    • Magazine of korean Tunnelling and Underground Space Association
    • /
    • v.1 no.1
    • /
    • pp.67-80
    • /
    • 1999
  • The Grout-reinforcement technique which is widely used during the excavation of a shallow or an endangered tunnel can be classified into a couple of groups according to the properties and injection methods of the grout. The reinforcement design will, therefore, take a different approach based on the grouting method under consideration. However, the injection procedure is mainly performed by the experience of the foreman rather than engineering judgement , specifically the permeation grouting through the rock joints and its reinforcement effect Is not fully under-stood during the design stage, In this study, the anisotropic material properties of the grout-reinforced rock masses are derived from the concept of composite materials and the effect of intact rock, vertical grouting and permeation grouting is, therefore, fully accounted for. Through the parametric studies on the characteristics of rock joints, intact rock and grouting materials, various case studies have been considered. The results, illustrated via the design charts, can be directly used during the reinforcement design.

  • PDF

Development of Pre-Postprocessing Toolbox for Elasto-plastic Analysis of Underground Structures with Water Flow (지하수 흐름을 고려한 지하구조계의 탄소성해석에 대한 전-후처리기법의 개발)

  • 김문겸;임성철;이재영;송재성
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1997.04a
    • /
    • pp.79-86
    • /
    • 1997
  • In this study, pre-postprocessing toolbox is developed to perform elasto-plastic analyze of underground structures with transient ground water flow. This toolbox is composed of three modules. The first is the data input processor for the structural analysis. The preprocessing Is using GUI (Graphic User Interface), which is consist of dialog box, pull down, and short-cut icon, etc. The second is the structural analysis module. The analysis is based on the elasto-plastic finite element method involving additional options such as ground excavation effect, transient ground water flow, and rock bolts behavior. The last is the postprocessing module. The postprocessing is able to verify the result of the structural analysis by the graphical simulation which visualizes the element mesh, the node displacements, the element stress states, the stress contour, the ground water surface, and the rock bolt stresses. Since various options are considered separately in this toolbox, it is easy to modify the module of each processing, and to update other functional modules for the given analysis conditions.

  • PDF

BIM Based Virtual Simulations in CIP(Case in Place Pile) Method for Underground Space Excavation (3차원 정보모델을 활용한 지하공간 굴착 CIP 공법의 가상검토 -서울대학병원 지하 복합진료공간 임대형 민자사업 BIM 설계를 중심으로-)

  • Lee, Hyuk-Jin;Park, Kun-Young;Kim, Hyo-Jin;Lee, Sang-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2010.04a
    • /
    • pp.517-520
    • /
    • 2010
  • BIM 설계시 의무사항으로 포함되어 있는 원지형과 암층별 지층, 흙막이 공법 중 CIP(Cast in Place Pile)공법, 구조물 형상을 3차원 정보 모델로 생성하고, 모델을 통해 정확한 2D 도면의 생성, 각 공정간의 간섭검토, 암층별 토공량 및 흙막이의 수량을 산출하였다. 최종 설계안을 도출하기 위해 3차원 기법이 설계 초기에 도입되어 반복적인 노력과 시간을 최소화하여 많은 설계대안을 제시하도록 하였으며, 정확한 설계결과를 얻기 위해, 2D 설계와 3D 설계를 병행 수행함과 동시에 이 과정과 결과를 비교하여 3차원 모델의 효과를 검증하였다.

  • PDF

3D Visualization Technique Based Tunnel Design (3차원 가시화 기법을 이용한 터널설계)

  • 홍성완;배규진;김창용;서용석;김광염
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.759-766
    • /
    • 2002
  • In the paper the authors describe the development of ITIS(Intelligent Tunneling Information System) for the Purpose of applying the 3D visualization technique, GIS, AI(Artificial Intelligence) to tunnel design and construction. VR(Virtual Reality) and 3D visualization techniques are applied in order to develope the 3D model of characteristics and structures of ground and rock mass. Database for all the materials related to site investigation and tunnel construction is developed using GIS technique. AI technique such as fuzzy theory and neural network is applied to predict ground settlement, decide tunnel support method and estimate ground and rock mass properties according to tunnel excavation steps. ITIS can help to inform various necessary tunnel information to engineers quickly and manage tunnel using acquired information based on D/B.

  • PDF