• Title/Summary/Keyword: engineering works

Search Result 4,393, Processing Time 0.032 seconds

Development of Design Support System to Optimize the Temporary Work (강교량 설치 가설공사의 최적화설계 지원시스템 개발)

  • Cho, Hun-Hee;Park, Jae-Woo;Cho, Moon-Young;Kim, Jung-Yeol
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.6 s.28
    • /
    • pp.115-123
    • /
    • 2005
  • Design of steel $bridge^{\circ}AEs$ temporary works has conducted relying on the experiences of engineers based on the previous similar projects. Consequently, there have been arguments against over-design of temporary bents to be required at the actual construction sites, and unnecessary design changes have been issued at the construction stage. In this study, we have developed an optimum design support system for temporary works of the steel bridge construction through establishing the database for the materials to be needed for implementation of temporary works. We've also improved the accuracy and efficiency of the works through the design optimization for temporary works, and contributed to reduce design changes as well as to utilize the design informations at the construction stage.

A Thought on the Fire Fighting Official Selection Examination (소방공무원 채용시험에 관한 소고)

  • Hyun Seong-Ho;Song Yun-Suk;Lee Chang-Woo
    • Fire Science and Engineering
    • /
    • v.19 no.4 s.60
    • /
    • pp.80-86
    • /
    • 2005
  • Fire fighting officials perform their works in the field and in most cases, undergo circular appointments for their service period. If they don't gain experience in field works, they have difficulty in performing faithful planning or administrative works. So they surely have to gain experiences in field works. Like this, fire fighting officials' works comprise a lot of fields, comparing with other job workers. So they need a strict body condition. The aim of this inquiry is to scrutinize body standards and important roles concretely which are necessary to fire fighting officials, to analyze written examination, physical test, physical strength test, and interview examination, and to establish the proposal which is necessary to improvement.

A graphical user interface for stand-alone and mixed-type modelling of reinforced concrete structures

  • Sadeghian, Vahid;Vecchio, Frank
    • Computers and Concrete
    • /
    • v.16 no.2
    • /
    • pp.287-309
    • /
    • 2015
  • FormWorks-Plus is a generalized public domain user-friendly preprocessor developed to facilitate the process of creating finite element models for structural analysis programs. The lack of a graphical user interface in most academic analysis programs forces users to input the structural model information into the standard text files, which is a time-consuming and error-prone process. FormWorks-Plus enables engineers to conveniently set up the finite element model in a graphical environment, eliminating the problems associated with conventional input text files and improving the user's perception of the application. In this paper, a brief overview of the FormWorks-Plus structure is presented, followed by a detailed explanation of the main features of the program. In addition, demonstration is made of the application of FormWorks-Plus in combination with VecTor programs, advanced nonlinear analysis tools for reinforced concrete structures. Finally, aspects relating to the modelling and analysis of three case studies are discussed: a reinforced concrete beam-column joint, a steel-concrete composite shear wall, and a SFRC shear panel. The unique mixed-type frame-membrane modelling procedure implemented in FormWorks-Plus can address the limitations associated with most frame type analyses.

Case Study on Engineering Camp Program involving Engineering Design Activity and Intra-/Inter-Team Works for High School Students: Plant factory as main theme (공학설계활동과 팀 내, 팀 간 협력 기반 고등학생 공학 캠프 프로그램 운영 사례: 식물공장을 주제로)

  • Cho, Kyung-Suk
    • Journal of Engineering Education Research
    • /
    • v.18 no.3
    • /
    • pp.46-58
    • /
    • 2015
  • Informal engineering education program for high school students was developed to cultivate engineering literacy using the human resources and facilities of university. Plant factory, a smart farming technology, was selected as a main theme, and the novel engineering camp program involving engineering design activities and intra-linter-team works was planned. The camp program was applied to 38 high school students in an active learning classroom. Five teams were constructed according to elemental technologies such as biotechnology, information-communication technology, energy engineering, mechanical engineering and architectural engineering, and the students were participated in intra- and inter-team activities to achieve the final goal of 'the construction of a plant factory in school'. The team works were conducted according to the eight steps of engineering design process (identifying the problem and need, identifying criteria and constraints, brainstorming possible solutions, selecting the best possible solution, constructing a prototype, testing and evaluating the solution, communicating the solution, and refining design). Participants' satisfaction survey showed that the satisfaction on the contents of engineering design was 4.48 on 5-point Likert scale. The participants' satisfaction on creative activity and systematic methodology was 4.43 on 5-point Likert scale. 97% of participants responded positively to team works, and 92% of participants were satisfied with career mentoring activity supplied by undergraduate/graduate students. These results indicates that the engineering camp program involving engineering design activity and intra-/inter-team works can contribute to cultivate engineering literacy such as creativity, problem solving ability, collaboration, communication skills for high school students, and to increase their interests in engineering fields.

A Study on the Hazard Analyses of Construction for Base Station of Mobile Communication (이동통신 기지국 공사의 위험요인 분석에 관한 연구)

  • Lee, Sang-wook;Kwon, Soon-joon;Yi, Young-seop
    • Journal of the Korean Society of Safety
    • /
    • v.30 no.5
    • /
    • pp.44-51
    • /
    • 2015
  • As the domestic communication industry has been made rapid progresses, the construction of base stations are also expanded yearly from more than 86,000 ones in the year 2005 to over 300,000 ones in 2013. While the new construction and rebuilt works have been rapidly increased, there has been not tried about the analysis as well as the control of hazards for the construction works. This study is conducted to do not only the focus interview for 27 expert groups who are engaged in the construction works and safety, but also the questionnaires for AHP analysis which is suggested by the Korea Occupational Safety and Health Agency for 92 persons who are engaged in the construction works in order to analyze the hazards of construction works for base stations. The high ranked risk works which are acquired from the two methods are fall under installation of antennae, struck by the hand tools and construction materials under installation of antennae, fall during going up and down the steel tower and telegraph poles and the fall by electric shock during the underground cable works. The control for the above hazards are the installation of fall protection equipments, the installation of safety nets for falling objects and the installation of protection equipment of electric shock.

Development of Construction Project Management System Applicable to Earth-Work Field (토공 현장관리 중심의 시공관리시스템 개발에 관한 연구)

  • Kwon, Oh-Yong;Jo, Jae-Ik;Kim, Do-Keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.301-304
    • /
    • 2008
  • The purpose of this study is to embody the integrated working management system for public works, focused on the management of surplus soil at a field of public works. The contents and results of this study can be classified into the design of working management DB for public works and the embodiment of working management DB. First, the design of working management DB for public works consists of three DBs - process management to analyze work plan and performance. for backhoe loader, working management and resources management for equipment and labor management - in connection with work and resources classification system. Secondly, the working management system for public works can describe work plan and performance on a floor plan using graphic. Based on this, the status of process and progress report with visual expression had been developed to facilitate the communications and performance of duties among staff in charge at the field of public works. This study is a specialized system for a company specializing in public works and a system that can be put into practical use if practicality is proved through test-bed with regard to business.

  • PDF

Development of fracture face mapping algorithm and its applications to the design of various engineering and environmental works. (토목설계 및 시공분야 지반조사를 위한 절리 단면 영상법 개발 및 그의 응용사례)

  • 김중열;김유성;김기석
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2002.03a
    • /
    • pp.119-126
    • /
    • 2002
  • Fractures, especially faults have most significant influence on the difficulties encountered in various engineering and mining works, because they can give rise to inevitable reductions in shear strength as well as large increase in permeability. Thus, before underground access is possible, it is desirable to estimate the distribution and geometry of fractures in advance, if reliable structural data from e.g. Televiewer tool are available. To this end, fracture face mapping is just the evaluation method used to form a fracture image determined by intersecting of each fracture plane with a selected plane section of a rock mass, assuming that all fractures be planar with fixed-aperture. Although many fractures are geometrically complex and others are altered chemically, according to the abundant experiments in recent years, it would seem that the technique could be applied to benefit the design of numerous engineering works such as slope stability, tunnel excavations, dam foundation and diverse environmental works. This paper presents at first an evaluation algorithm for fracture face mapping and then concludes with various representative examples of applications.

  • PDF

Development of Electromagnet wheel for Vertical wall-climbing Mobile Robot (수직벽면 작업용 이동형 플랫폼 장치의 전자석 휠 개발)

  • Kim J.H.;Chung W.J.;Kim H.G.;Kim S.H.;Lee S.H.
    • Proceedings of the Korean Society of Precision Engineering Conference
    • /
    • 2005.10a
    • /
    • pp.740-743
    • /
    • 2005
  • Most works of the large vertical ceiling structures have been performed by human manually. These works require much more operation costs, labors and times, etc. Beside most people avoid this works because of it's characteristic such as danger, dirty and difficulty. So necessity of automation for these works has been rising. This automation needs a wall climbing mobile vehicle because of the movement of platform large workspace. In this study, we aim at develop the wheel which can be used for vertical wall-climbing mobile robot using electromagnet wheel. The wheel proposed can be available for several working processes on structures which consist magnetic substance.

  • PDF

Relationship between Stress Level and Reworks for Construction Professionals

  • Chae, Jeonghyeun;Kang, Youngcheol
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.169-178
    • /
    • 2020
  • This paper presents a study investigating the relationship between stress level and reworks for construction professionals. As employees' work-life balance (WLB) becomes more important nowadays, controlling the level of stress in the workplace becomes more important as occupational stress has negative impacts on WLB. Reworks can be one severe occupational stressor as people suffer from stress when they need to redo their works. This study hypothesizes that there is a positive correlation between reworks and level of stress, meaning that people tend to show high level of stress when they need to redo their works. The hypothesis will be tested by checking the stress level when engineers redo their works because of changes or errors. An electroencephalography (EEG) sensor will be used to measure the stress level of engineers when they redo their works. For more accurate measure of stress, the stress level will also be measured by the galvanic skin response (GSR). This experiment is expected to prove that rework process is a severe stressor for construction professionals, which will contribute to lower productivity and poorer WLB. The finding will emphasize the importance of managing reworks in the construction industry, which will eventually help construction managers to control the level of employees' stress successfully.

  • PDF

The effect of Dealing Activities against Techno-Stress on Smart-Works Performance in Smart Works Environments. (스마트워크 환경에서 테크노스트레스에 대한 대처행위가 스마트워크 성과에 미치는 영향에 관한 연구)

  • Kim, Do-Goan;Lee, Yun-Hee;Hong, Seung-June
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2014.05a
    • /
    • pp.161-164
    • /
    • 2014
  • Todays, many public institutes and corporations are constructing smart-works centers with high tech remote task system. In spite of the strong points on the smart works system, these can cause techno-stress on users. In this point, this paper is to understand the effect of dealing activities against techno-stress on smart-works performance in smart works environments. While many studies on ICT and information system have been focusing on performance, it is considering personal factors to impede system success and performance.

  • PDF