The route of surge arrester connection is very important because bends and kinds of leads increase the impedance to lightning surges and tend to nullify the effectiveness of a grounding electrode conductor. There is a need to know how effective installation of lightning surge arresters is made in order to control voltage and to absorb energy at high lightning currents. The effectiveness of a grounding conductor and bonding for 18[kV] metal oxide distribution line arresters was experimentally investigated with lightning and oscillating impulse voltages.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.12
no.1
/
pp.12-19
/
1998
This paper deals with ACSR(Aluminum Conductor Steel Reinforced) inner corrosion detection using a detector which automatically runs on an ACSR distribution line and inspects the inner corrosion of the conductor by utilization of the nondestructive eddy current test. According to corrosion appearance and development of ACSR, the impedance change of the eddy current coils is theoretically verified. And then specifications and performances of the detector are described. Experimental procedures and desirable test results are reported. In conclusion, this detector can realize the nondestructive detecting of an ACSR inner corrosion. Upgrading the maintenance efficiency and improving the reliability of distribution line, whether is covered with insulating materials or not, would be expected by this nondestructive test method.method.
In medium voltage electrical distribution networks, reforming the loss reduction is important, and in line with this, the issue of system engineering and use of proper equipment Expansion of distribution systems results in higher system losses and poor voltage regulation. Therefore, an efficient and effective distribution system has become more important. So, proper selection of conductors in the distribution system is crucial as it determines the current density and the resistance of the line. Evaluation of aging conductors for losses and costs imposed in addition to the careful planning of technical and economic networks can be identified in the network design. In this paper the use of imperialist competitive algorithm; genetic algorithm; is proposed to optimal branch conductor selection and reconstruction in radial distribution systems planning. The objective is to minimize the overall cost of annual energy losses and depreciation on the cost of conductors to improve productivity given the maximum current carrying capacity and acceptable voltage levels. Simulations are carried out on 69-bus radial distribution network using genetic algorithm approaches to show the accuracy as well as the efficiency of the proposed solution technique.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.26
no.6
/
pp.38-46
/
2012
In this paper, the necessity for the identification of the absolute phase value is introduced and analyzed for a particular conductor line of a 3-phase type distribution network and the recent methods are also introduced. For the determination of the exact phase value for a specific point in the line, as compared with the phase reference point, the measured phase value must be within a range of ${\pm}60[^{\circ}]$. However, the phase of a particular point can fluctuate depending on the line constant, transformer wiring method, line length, line amperage, etc. A theoretical formulation such as Simulink modeling and analysis for a distribution network are conducted for the identification of phase at a specific point in the line. In particular, through evaluating the effects of unbalanced current loads at the time of determination of the phase value, the limitations of the present method for the determination of phases is described.
With the sustained and rapid development of new energy sources, the demand for electric energy is increasing day by day. However, China's energy distribution is not balanced, and the construction of transmission lines is in a serious lag behind the improvement of generating capacity. So there is an urgent need to increase the utilization of transmission capacity. The transmission capacity is mainly limited by the maximum allowable operating temperature of conductor. At present, the evaluation of transmission capacity mostly adopts the static thermal rating (STR) method under severe environment. Dynamic thermal rating (DTR) technique can improve the utilization of transmission capacity to a certain extent. In this paper, the meteorological parameters affecting the conductor temperature are analyzed with the IEEE standard thermal equivalent equation of overhead transmission lines, and the real load capacity of 220 kV transmission line is calculated with 7-year actual meteorological data in Weihai. Finally, the thermal load capacity of DTR relative to STR under given confidence is analyzed. By identifying the key parameters that affect the thermal rating and analyzing the relevant environmental parameters that affect the conductor temperature, this paper provides a theoretical basis for the wind power grid integration and grid intelligence. The results show that the thermal load potential of transmission lines can be effectively excavated by DTR, which provides a theoretical basis for improving the absorptive capacity of power grid.
After flashover occurs on the overhead distribution line by lighting strokes(direct or induced), the power frequency arc current continues. If lightning flashover occurs on the overhead lines using covered conductors, the power frequency art current with fixed path overheats the conductor, and arc fusion fault can be occurred. There are two categories protecting or reducing methods of arc fusion faults caused by lightning stokes. - Reducing lightning flashover rate : G/W, LA, etc. - Protection by AFPD(Arc Fusion Protection Device) : power follow current interruption. This paper presents lightning surge phenomena on overhead distribution lines and protecting performance of arc fusion Protection devices to the lightning strokes nearby overhead line.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.1
/
pp.16-21
/
1999
The analysis of distribution line faults is essential to the proper protections of the power system. A high impedance fault test, which was carried in Korean electric power systems, it was found that a arcing phenomenon occurred during the high level portion of conductor voltage in each cycle. In this paper, we propose a new method for detection of high impedance faults, which uses the arcing fault current difference during high voltage and low voltage portion of conductor voltage waveform. To extract this difference, we diveded one cycle fault current into equal spanned four data windows according to the magnitude of voltage waveform and applied fast fourier transform(FFT) to each data window. The frequency spectrum of current wavefrom in each portion are used as the inputs of neural network and is trained to detect high impedance faults. The proposed method shows improved accuracy when applied to staged fault data and fault-like load.
The Transactions of the Korean Institute of Electrical Engineers A
/
v.48
no.9
/
pp.1073-1080
/
1999
Optimal routing of distribution networks can be attained by keeping the line power capacity limit to handle load requirements, acceptable voltage at customer loads, and the reliability indices such as SAIFI, SAIDI, CAIDI, and ASAI limits. This method is composed of optimal loss reduction and optimal reliability cost reduction. The former is solved relating to the conductor resistance of all alternative routes, and the latter is solved relating to the failure rate and duration of each alternative route. The routing considering optimal loss only and both optimal loss and optimal reliability cost are compared in this paper. The case studies with 10 and 24 bus distribution networks showed that reliability cost should be considered as well as loss reduction to achieve the optimal routing in the distribution networks.
Kim, Jong-Won;Lee, Ki-Soo;Paek, Heum-Soo;Choi, Bong-Nam;Park, Hee-Cheol
Proceedings of the KIEE Conference
/
2000.07c
/
pp.2020-2022
/
2000
The cross-linked polyethylene(herein after XLPE) insulated power cable emit the methane($CH_4$)gas in the course of chemical cross-linking process. The general stranded conductor easily discharge this methane gas through the gap of each stranded wires. But the special stranded conductor that filled with semi-conducting rubber compound to prevent water penetration which is applied to water proof type of cable(22.9kV CN/CV-W), disturb the methane gas emission. The pre-mold type cable joint shall be expanded gradually by emit of gas left in XLPE insulation. For example, sometimes the corona problem outbreak on a new power distribution line, resulted from the gap between the sleeve and semi-conductive layer of cable joint. If above mentioned problem especially happened on the way of operating. We have to shut down the line and try to discharge the methane gas in cable joint. In this point, we would like to explain the mechanism of methane gas & cable joint and our test result briefly. At last, we are pleased to introduce the solution for preventing reoccurrence of this problem.
Journal of the Korean Institute of Electrical and Electronic Material Engineers
/
v.21
no.11
/
pp.1036-1041
/
2008
According to previous report, aged sleeves of old transmission line showed several defaulted installation patterns, which was biased or corrosive-fractured of steel sleeve installed cases. These defects can cause serious accidents such as rapid increasing of sag or falling out of overhead conductor from sleeves. Consequently, the defects lead to the major power outage. Corrosion of steel sleeve is a typical defect by aging of sleeves. And it occupied almost 25 percent of investigated aged sleeves. This paper studied thermal properties and tension for ACSR conductor in case of fractured steel sleeve model by corrosion. The temperature distribution within overhead conductor has a specific gradient. Thermal properties of splice connectors(sleeve and clamp) showed normal behavior. However, mechanical properties were worse than normal sleeves. The detailed results were presented in the text.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.