An old building over 30 years old continue to increase. Therefore, there will be more dismantling of old buildings in the future. Safety management of dismantling works is being strengthened. However, no consideration has been given to the effects of dismantling workers and their residents due to environmental hazards arising from the demolition process. Only spray and dust prevention measures are subject to inspection to minimize dust generation considering civil complaints around the site of dismantling work. In this paper, residential buildings, which account for the largest proportion of old buildings, were collected and identify total airborne bacteria and floating fungi among environmental hazards caused by non-structural dismantling work. Measurement results showed that workers during dismantling work are working in places with 4.8 times more total airborne bacteria than indoor air quality maintenance standards. Related research is needed for the health of dismantling workers.
Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.
Asbestos is a building material that has been actively used because of its excellent durability and heat resistance until 2009, when it was found to be a first-class carcinogen and prohibited in Korea. Currently, asbestos dismantling is an essential process in demolition of old buildings. Workers are likely to be exposed to asbestos in the process of dismantling and removing them, which causes various occupational diseases, suggesting related laws and work standards to ensure the safety of asbestos dismantling process. Accordingly, prior studies have been conducted to analyze the level of asbestos exposure and influencing factors occurring during work, but most of them are mainly concerning health issue while research on process risks considering field characteristics and safety aspects of the work processes is still insufficient. Therefore, this study aims to derive the process risks affecting the safety of workers based on the survey results of asbestos dismantling companies, and further proposed a cost calculation model taking those risks into account.
Asbestos is a durable and heat-resistant building material used in various building materials such as slate, ceiling tex, and spray paint. It has been banned since 2009 after found to be a first-class carcinogen that causes various cancers and asbestos lung disease. Since workers are likely to be exposed to asbestos in the process of dismantling and removal of asbestos-made building materials and facilities, laws and work standards are proposed by the Ministry of Employment and Labor to ensure the safety of asbestos dismantling work. In addition, prior studies on exposure levels and analysis methods have been conducted in this regard mainly for residents. However, the relation between the results of the risk assessment of the process conducted during the asbestos investigation and the work is still ambiguous for the safety of workers. Therefore, this study proposes a process model development methodology that considers work risk based on the results of a survey from asbestos dismantling companies.
Kim, Sung-Kyun;Jeong, Kawn-Seong;Lee, Kune-Woo;Park, Jin-Ho
한국방사성폐기물학회:학술대회논문집
/
한국방사성폐기물학회 2004년도 Proceedings of the 4th Korea-China Joint Workshop on Nuclear Waste Management
/
pp.114-129
/
2004
The 3D simulations for the Rotary Specimen Rack (RSR), the shielding concret, and the reactor core dismantling processes in the Korea Research Reactor-1&2(KRR-1&2) were carried out in the present work. The four main dismantling items, which are the RSR, reactor core, beam tube, and the thermal column and the shield concrete, were selected among the many components in the KRR-2 by consideration of the activation, worker training, difficulty of the work and so on. On the basis of these, we built 3D CAD models, selected the proper dismantling technologies, and reviewed their dismantling processes. In this study, the 3D simulation results of the shielding concrete, and the reactor core dismantling processes are also presented and discussed.
Lee, ChoongWie;Lee, Donghyun;Kim, Hee Reyoung;Lee, Seung Jun
Nuclear Engineering and Technology
/
제52권9호
/
pp.2085-2091
/
2020
The license for Kori-1, the first commercial reactor in Busan, Korea, was terminated in June 2017; therefore, preparations are being made for its decommissioning. Because the radioactivity of Bio-shield varies greatly throughout the structure, the doses received by the workers depend on the location, order, and duration of dismantling operations. Thus, a model for evaluating the worker external dose during the dismantling of the Kori-1 bio-shield was developed, and work scenarios for dose assessment were designed. The Dose evaluation code VISIPLAN was used for dose assessment. The dose rate around the bio-shield was evaluated and the level of exposure to the operator was evaluated according to the work scenario. The maximum annual external dose was calculated as 746.86 mSv for a diamond wire saw operator under dry cutting conditions, indicating that appropriate protective measures, such as changing dismantling sequence, remote monitoring, shield installation, and adjustment of work team are necessary for the safe dismantling of the bio-shield. Through these protective measures, it was found that the worker's dose could be below the dose limit.
In Korea, asbestos removal has been actively carried out nationwide since 2015 when asbestos was completely banned as a first-class carcinogen. Since scattering dust generated in the process of removing asbestos causes fatal diseases such as asbestos lung disease and lung cancer, concerns are growing over the safety of construction workers and building users undergoing dismantling. For this reason, regulations on asbestos sites have been strengthened and prior studies on safety and risk assessment have been conducted, but research on actual site data collection and process planning is insufficient even though safety is reduced due to delay in site construction period. Therefore, it is necessary to analyze the work and delay factors of the asbestos dismantling process and develop an optimized process plan model for workers. This study is an initial step to develop an optimized process plan model that considers the safety and productivity of asbestos dismantling work, and aims to help establish an optimized process plan for asbestos dismantling process using website clone simulation.
Many nuclear power plants in Japan are approaching the end of their planned operational life spans. They must be decommissioned safely in the near future. Using augmented reality (AR), workers can intuitively understand information related to decommissioning work. Three-dimensional (work-site) reconstruction models of dismantling fields are useful for workers to observe the conditions of dismantling field situations without visiting the actual fields. This study, based on AR and work-site reconstruction models, developed and evaluated an information reference system. The evaluation consists of questionnaires and interview surveys administered to six nuclear power plant workers who used this system, along with a scenario. Results highlight the possibility of reducing time and mitigating mistakes in dismantling fields. Results also show the ease of referring to information in dismantling fields. Nevertheless, it is apparently difficult for workers to build reconstruction models of dismantling fields independently.
Investigation of the cause of the relatively recent building collapse accident in Gwangju revealed a lack of awareness about the safety of the dismantling construction system among stakeholders, in the form of issues such as illegal subcontracting, unauthorized design changes, and insufficient safety supervision. This study was conducted to analyze the safety interactions between the building dismantling construction system and the involved stakeholders and to propose ways to prevent accidents in related institutions and workplaces. AcciMap and STAMP-CAST analysis methods were used to evaluate safety interactions among the various stakeholders participating in building demolition work. Analysis results revealed that the collapse accident during the dismantling work was caused not only by structural causes occurring in the construction stage, but also by various causes throughout the system, such as the dismantling plan preparation stage and the construction permit stage. The results also revealed the need for proper implementation of safety control measures by various stakeholders to prevent collapse accidents during dismantling construction.
The 3D simulations of the shielding concrete and the Rotary Specimen Rack(RSR) in the Korea Research Reactor-1&2(KRR-1&2) were carried out in present work. Four main dismantling processes, which are the removal of the RSR, reactor core region, beam tube, and thermal column and activated concrete, were selected for the graphic simulation by the consideration of the activation, worker training, work difficulty and so on. On the basis of these, we constructed their 3D CAD models and then drawn and reviewed their dismantling processes. In this study, the 3D simulation results of the shielding concrete and the RSR among main components are also presented and discussed.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.