• Title/Summary/Keyword: data scheduling

Search Result 1,040, Processing Time 0.028 seconds

Scheduling algirithm of data sampling times in the real-time distributed control systems

  • Hong, Seung-Ho
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1992.10b
    • /
    • pp.112-117
    • /
    • 1992
  • The Real-time Distributed Control Systems(RDCS) consist of several distributed control processes which share a network medium to exchange their data. Performance of feedback control loops in the RDCS is subject to the network-induced delays from sensor to controller and from controller to actuator. The network-induced delays are directly dependent upon the data sampling times of the control components which share a network medium. In this study, a scheduling algorithm of determining data sampling times is developed using the window concept, where the sampling data from the control components dynamically share a limited number of windows.

  • PDF

A Bus Scheduling Problem with Multiple Objective Functions and Travel Time Constraint (여러 개의 목적함수와 운행시간제약을 가진 버스일정계획)

  • Kim, Woo-Je
    • IE interfaces
    • /
    • v.15 no.1
    • /
    • pp.49-54
    • /
    • 2002
  • A bus scheduling problem with multiple objective functions and travel time constraint is to determine the allocation of buses to customer service requests minimizing the number of buses and travel costs under the travel time restriction for each bus. For the scheduling, we first represent the scheduling problem using a graph and develop a hierarchical approach. Second, we develop a mathematical model based algorithm for the scheduling problem including heuristic methods. We tested the performance of the algorithm on instances with real data. As a result, the total number of buses and travel costs are reduced over about 10% comparing with that of current practice at the company.

APPLICATION OF DISCRETE EVENT SIMULATION TO PRODUCTION SCHEDULING (이산적 시뮬레이션 모델을 이용한 생산 스케쥴)

  • 박영홍
    • Journal of the Korea Society for Simulation
    • /
    • v.10 no.1
    • /
    • pp.1-12
    • /
    • 2001
  • This article describes the application of discrete event simulation in a process industry (coffee manufacturing) as a daily production-scheduling tool. A large number of end products (around 300), sporadic demand, and limited shelf life of coffee (90 days) make it difficult to generate feasible production schedules manually. To solve this problem, an integrated system was developed incorporating discrete event simulation methodology into scheduling process. The integrated system is comprised of two components: a scheduling program and a simulation model. The scheduling program is used to generate daily schedules for roasting, grinding, and packing coffee. The simulation model uses the generated schedules to simulate the production of coffee and regenerates a modified production schedule. In this paper, each of the components will be described in detail, evaluated in terms of performance factors, and validated with a set of real production data. Although this article focuses on a specific system, we will share our experiences and Intuitions gained and encourage other process industries to develop simulation-based scheduling tools.

  • PDF

An Efficient Scheduling Method for Grid Systems Based on a Hierarchical Stochastic Petri Net

  • Shojafar, Mohammad;Pooranian, Zahra;Abawajy, Jemal H.;Meybodi, Mohammad Reza
    • Journal of Computing Science and Engineering
    • /
    • v.7 no.1
    • /
    • pp.44-52
    • /
    • 2013
  • This paper addresses the problem of resource scheduling in a grid computing environment. One of the main goals of grid computing is to share system resources among geographically dispersed users, and schedule resource requests in an efficient manner. Grid computing resources are distributed, heterogeneous, dynamic, and autonomous, which makes resource scheduling a complex problem. This paper proposes a new approach to resource scheduling in grid computing environments, the hierarchical stochastic Petri net (HSPN). The HSPN optimizes grid resource sharing, by categorizing resource requests in three layers, where each layer has special functions for receiving subtasks from, and delivering data to, the layer above or below. We compare the HSPN performance with the Min-min and Max-min resource scheduling algorithms. Our results show that the HSPN performs better than Max-min, but slightly underperforms Min-min.

NHS: A Novel Hybrid Scheduling for ILP

  • You, Song-Pei;Mashiro Sowa
    • Proceedings of the IEEK Conference
    • /
    • 2000.07a
    • /
    • pp.310-313
    • /
    • 2000
  • This paper presents a new scheduling method for ILP processing called NHS(Novel Hybrid Scheduling). It concerns not only exploiting as much ILP as possible like other state-of-the-art scheduling scheme, but also choosing the most important instructions among many ready-to-execute instructions to processors in order to reduce the execution time under limited hardware resource. At the heart of NHS is a conception called CCP(Complex Critical Path), an extension of CP(Critical Path). By using CCP, compiler not only can get a global information of the whole program to extract ILP, but also can collecting data dependence information and control flow information. The paper also presents the simulation results, to date, of our attempts to study the NHS scheduling method. The results indicate good potential for this scheduling method.

  • PDF

Task Scheduling in Fog Computing - Classification, Review, Challenges and Future Directions

  • Alsadie, Deafallah
    • International Journal of Computer Science & Network Security
    • /
    • v.22 no.4
    • /
    • pp.89-100
    • /
    • 2022
  • With the advancement in the Internet of things Technology (IoT) cloud computing, billions of physical devices have been interconnected for sharing and collecting data in different applications. Despite many advancements, some latency - specific application in the real world is not feasible due to existing constraints of IoT devices and distance between cloud and IoT devices. In order to address issues of latency sensitive applications, fog computing has been developed that involves the availability of computing and storage resources at the edge of the network near the IoT devices. However, fog computing suffers from many limitations such as heterogeneity, storage capabilities, processing capability, memory limitations etc. Therefore, it requires an adequate task scheduling method for utilizing computing resources optimally at the fog layer. This work presents a comprehensive review of different task scheduling methods in fog computing. It analyses different task scheduling methods developed for a fog computing environment in multiple dimensions and compares them to highlight the advantages and disadvantages of methods. Finally, it presents promising research directions for fellow researchers in the fog computing environment.

A Scheduling Algorithm for Continuous Media (연속미디어를 위한 스케쥴링 알고리즘)

  • 유명련;안병철
    • Journal of Korea Multimedia Society
    • /
    • v.4 no.5
    • /
    • pp.371-376
    • /
    • 2001
  • Since continuous media such as video and audio data are displayed within a certain time constraint, their computation and manipulation should be handled under limited condition. Traditional real-time scheduling algorithms cold be directly applicable, because they are not suitable for multimedia scheduling applications which support many clients at the same time. Rate Regulating Proportional Share Scheduling Algorithm based on the stride scheduler is a scheduling algorithm considered the time constraint of the continuous media. The stride schedulers, which are designed to general tasks, guarantee the fairness of resource allocation and predictability. The key concept of RRPSSA is a rate regulator which prevents tasks from receiving more resource than its share in a given period. But this algorithm loses fairness which is a strong point of the stride schedulers, and does not show graceful degradation of performance under overloaded situation. This paper proposes a new modified algorithm, namely Modified Proportional Share Scheduling Algorithm considering the characteristics of multimedia data such as its continuity and time dependency. Proposed scheduling algorithm shows graceful degradation of performance in overloaded situation and it reduces the scheduling violations up to 70% by maintaining the fair resource allocation. The number of context switching is 8% less than RRPSSA and the overall performance is increased.

  • PDF

An Efficient Scheduling Scheme for Bluetooth Piconets (블루투스 피코넷을 위한 효율적 스케줄링 기법)

  • 이우신;이혁준
    • Journal of KIISE:Information Networking
    • /
    • v.30 no.1
    • /
    • pp.38-47
    • /
    • 2003
  • Communication between Bluetooth devices is based on TDD by a master unit. In this discipline, the transmission of slave packets can be made only when the master transmits a packet to the slave. Thus, some slots may be wasted when there is no user data in the master's or slave's queue due to the transmission of a POLL or NULL packet. Therefore a scheduling scheme which can minimize the slot waste is required in Bluetooth intra-piconet communication. However, since the master is responsible for the intra-piconet scheduling, it must be provided with an information on each slave's queue length to apply traditional scheduling schemes. which is impossible in Bluetooth. This paper presents a new Bluetooth intra-piconet scheduling scheme that is efficient and does not require the information on each slave's queue length. The scheduling is done based on the information about the existence of data in the master and slave queues which is derived by the master identifying the type of packets transmitted. The master schedules to communicate with the slaves according to the priorities determined based on this information. We Presents simulation results which indicate a significant improvement in the performance when our proposed scheme is used.

The Technique of Scheduling for dynamic data transmission in MOST GATEWAY System (MOST GATEWAY 시스템에서 효율적 데이터 전송을 위한 스케줄링 기법에 관한 연구)

  • Jang, Seong-Jin;Jang, Jong-Yug
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2010.10a
    • /
    • pp.441-444
    • /
    • 2010
  • In our previous research, we proposed a MOST GATEWAY system for organically connected to the network MOST150 and MOST 25 and a simulation design method for performance analysis of Scheduling Algorithm in MOST GATEWAY system. Therefore in this paper, we use CANoe.MOST simulator in order to analyze the performance and propose a algorithm design method for Performance analysis according to number of queues by applying existing scheduling algorithms. Finally, we present an improvement scheme of the efficiency and scalability.

  • PDF

WCRT-reducing scheduling algorithm for programmable logic controllers with remote I/Os (떨어진 입출력 장치를 가지는 프로그래머블 로직 콘트롤러를 위한 스케쥴링 알고리즘)

  • 정승권;권욱현
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1997.10a
    • /
    • pp.752-755
    • /
    • 1997
  • In this paper, a scheduling algorithm is proposed for a programmable logic controller(PLC) with remote I/Os, assuming the multi-tasking facilities. Since sequence programs are executed on the application processor and I/O data are transmitted by the network processor concurrently, the proposed algorithm schedules the data transmission as well as the sequence program execution. The suggested algorithm guarantees the bounded WCRT(worst case response time), which is the one third of the WCRT in the absence of scheduling. Computer simulation shows that the algorithm can be easily applied to a real PLC without critical constraints on utilization of resources and inter-relation among tasks.

  • PDF