• 제목/요약/키워드: current cost

검색결과 3,909건 처리시간 0.028초

OLAP 다차원 모델을 이용한 소프트웨어 사업대가기준의 개선 (Improvement of Software Cost Estimation Guideline Using OLAP Multidimensional Model)

  • 박혜자;황인수;권기태
    • 한국IT서비스학회지
    • /
    • 제11권1호
    • /
    • pp.197-210
    • /
    • 2012
  • This paper presents the ways that can improve the Software Cost Estimation Guidelines in order to replace those that are expected to be abolished at February, 2012, and solve the problems that are being occurred in the current Software Cost Estimation Guidelines. By using multidimensional modeling of OLAP(On-Line Analytical Processing), this paper does three dimensional modeling that considers the product/service view, process view and skill view. Also, it presents the identification method of cost estimation data through the view of each dimension. Furthermore, it defines the software cost estimation process and adapts them into the bottom up estimation and the top down estimation. Finally, it proposes the access of cost estimation data by the multidimensional analysis of OLAP.

기획/계획단계에서 공동주택 건축공사비 산정을 위한 프로세스에 관한 고찰 (A Study on the Process for Estimating the Construction Cost of an Apartment House in the Planning/Planning Stage)

  • 조성민;조성희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.228-229
    • /
    • 2021
  • Planning/planning stage Construction cost prediction is very important. In particular, flexible thinking is required to predict the construction cost by reflecting rapid market changes and current conditions. Therefore, in this study, we tried to consider the process for calculating the construction cost of an apartment house in a more accurate planning/planning stage. First, cases were collected based on the classification system by construction type. Second, the construction cost was predicted using the case-based reasoning technique. Third, the composition ratio by construction type of the most similar case was applied to the derived construction cost. Finally, the construction cost was predicted based on practical corrections reflecting the market and field conditions.

  • PDF

Fabrication and Tests of the 24 kV class Hybrid Superconducting Fault Current Limiter

  • Lee, B.W.;Sim, J.;Park, K.B.;Oh, I.S.;Yim, S.W.;Kim, H.R.;Hyun, O.B.
    • 한국초전도ㆍ저온공학회논문지
    • /
    • 제9권4호
    • /
    • pp.32-36
    • /
    • 2007
  • We fabricated and tested a novel hybrid superconducting fault current limiter (SFCL) of three-phase $24kV_{rms}/630A_{rms}$ rating. In order to apply conventional resistive SFCLs into electric power systems, the urgent issues to be settled are as follows, such as initial installation price of SFCL, operation and maintenance cost due to ac loss of superconductor and the life of cryostat, and high voltage and high current problems. The ac loss and high cost of superconductor and cryostat system are main bottlenecks for real application. Furthermore in order to increase voltage and current ratings of SFCL, a lot of superconductor components should be connected in series and parallel which resulted in extreme high cost. In addition, the method to quench all components at the same instant needs very sophisticated skill and careful operation. Due to these problems, the practical applications of SFCL were pending. Therefore, in order to make practical SFCL, the price of SFCL should be lowered and should meet the demand of utilities. We designed novel hybrid SFCL which combines superconductor and conventional electric equipment including vacuum interrupter, power fuse and current limiting reactor. The main purpose of hybrid SFCL is to drastically reduce total usage of superconductor by adopting current commutation method by use of superconductor and high fast switch. Consequently, it was possible to get the satisfactory test results using this method, and further works for field tests are in the process.

Introduction to Industrial Applications of Low Power Design Methodologies

  • Kim, Hyung-Ock;Lee, Bong-Hyun;Choi, Jung-Yon;Won, Hyo-Sig;Choi, Kyu-Myung;Kim, Hyun-Woo;Lee, Seung-Chul;Hwang, Seung-Ho
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • 제9권4호
    • /
    • pp.240-248
    • /
    • 2009
  • Moore's law has driven silicon technology scale down aggressively, and it results in significant increase of leakage current on nano-meter scale CMOS. Especially, in mobile devices, leakage current has been one of designers' main concerns, and thus many studies have introduced low power methodologies. However, there are few studies to minimize implementation cost in the mixed use of the methodologies to the best of our knowledge. In this paper, we introduce industrial applications of low power design methodologies for the decrease of leakage current. We focus on the design cost reduction of power gating and reverse body bias when used together. Also, we present voltage scale as an alternative to reverse body bias. To sustain gate leakage current, we discuss the adoption of high-$\kappa$ metal gate, which cuts gate leakage current by a factor of 10 in 32 nm CMOS technology. A 45 nm mobile SoC is shown as the case study of the mixed use of low power methodologies.

CIM(Current Injection Method)을 이용한 Charge-Pump 방식의 Plasma Backlight용 고압Inverter (Charge-Pump High Voltage Inverter for Plasma Backlight using Current Injection Method)

  • 장준호;강신호;이경인;이준영
    • 전력전자학회논문지
    • /
    • 제12권5호
    • /
    • pp.386-393
    • /
    • 2007
  • 본 논문에서는 CIM(Current Injection Method)을 이용한 charge-pump방식의 plasma backlight용 고압 inverter회로를 제안한다. 고압 inverter에서 에너지 회수회로의 채용은 새로운 시도로서 에너지회수 이외에도 noise에 의한 시스템의 불안정성과 방전안정화에 기여하고 있다. charge-pump방식으로 스위치류의 내압을 저감하므로 cost면에서 매우 유리한 조건을 확립하였으며 CIM(Current Injection Method)방식의 적용으로 high speed 에너지 회수를 가능하게 하였다. 그리고 제안회로의 동작을 모드별로 해석하였으며, 실제 32" 패널에 적용하여 실험함으로써 제안한 회로의 유용성을 입증하였다.

수치해석에 의한 LNG 저장탱크용 강관파일 전기방식 설계 최적화 연구 (A Study on the Cathodic Protection Design Optimization of Steel Piles for LNG Storage Tanks by Numerical Analysis)

  • 김영근;송홍석
    • Corrosion Science and Technology
    • /
    • 제16권6호
    • /
    • pp.294-297
    • /
    • 2017
  • For the longer service life of steel pile, cathodic protection is selected sometimes at corrosive environment. The cathodic protection design improvement was investigated in this study. The current demand for cathodic protection was calculated from the potentiostatic current monitoring of the steel specimen in the deaerated soil samples. In this study, the current distribution was studied using the Boundary Element Method (BEM) and the Finite Element Method (FEM) numerical analysis methods. The optimum layout of the anode was developed and confirmed by numerical analysis. Under the conventional design of the anode, the length of the anode hole is same as the pile length. We found that, at the bottom end of the pile, the current density is too high. When the anode hole length was 80% of the pile length, the current consumption at the end was reduced. The construction cost of anode hole drilling was decreased about 20%, as compared to the conventional design. Furthermore, the life of the anode materials could be extended by reducing the current consumption at the end section. Using this approach, the construction cost was reduced significantly without any under-protection area on the steel piles.

병원급식 위탁계약에 대한 병원과 위탁회사의 견해 비교 분석 (Comparative Analysis on the Perspectives of Hospitals and Contractors on Items related with Contracting Hospital Foodservice Management)

  • 김현아;김진수;양일선;박문경;박수연
    • 대한영양사협회학술지
    • /
    • 제10권3호
    • /
    • pp.293-299
    • /
    • 2004
  • The purposes of this study were to : a) investigate the current status of contracted hospital food services, b) analyze and clarify various perspectives of contractors and hospitals. Thirty six hospitals and their contractors which were having more than 100 beds located in Seoul, Inchon and Kyungkido, were the subjects of this study. Data were collected through surveys. The survey was conducted during March to April in 2002. Questionnaires were mailed to the 36 directors of dietetic departments of hospitals and 36 managers of contract foodservice management company. Statistical analysis was completed using SPSS Win(11.0) for descriptive analysis, t-test and $x^2$-test. The results of the study can be summarized ; 1. The type of contract considered adequate by directors of dietetic departments and managers of contractors was fee-contract, combined type, followed by profit-and-loss contract. 2. According to the results from analysis on the contract cost per meal considered adequate by directors of dietetic departments and managers, the directors of dietetic department indicated that showing no difference with the current contract cost per meal. However, the managers of contractor indicated that showing significant differences compared with the current contract cost per meal(regular diet p<0.01, therapeutic diet p<0.001). 3. In the composition of contract cost per meal considered adequate, the managers of contracting businesses accounted labor cost (p<0.01) as a major cost, whereas the chiefs of nutrition departments accounted miscellaneous or controllable expense (p<0.001) and VAT (p<0.01) as major costs. 4. The directors of dietetic departments and managers thought that the hospital should be responsible for utility costs. On the other hand, directors of dietetic departments regarded that the contractor and managers thought that the hospital should pay for facility investment cost.

  • PDF

정보시스템 운영사업 비용산정 모형 개발에 대한 실증적 연구 (An Empirical Study On Information Systems Operation Cost Estimation Model)

  • 김현수
    • 한국정보처리학회논문지
    • /
    • 제7권6호
    • /
    • pp.1810-1817
    • /
    • 2000
  • The purpose of this research is to develop an estimation model for information systems operating costs. Current cost estimation practices and types of sytem management projects have been reviewed an analyses. Typical operating project types of information systems are determined. They are application system operation, help disk operation, network management and operation, and hardware management. For each type of projects, cost factors ar identified and a structure of cost estimation model is defined. Cost estimation models have been constructed and tested by 24 real operation projects data. Statistical analysis shows derived models are statistically significant. User groups' opinion on these draft cost estimation model has been surveyed and summarized. The results of this research can be used as a cornerstone for future research on operating cost estimation, and for cost estimation guideline of information systems operation projects.

  • PDF

기업특성에 따른 물류비 구성요소에 관한 연구 (A Study on the Enterprise Characteristics and Component Factors of Logistics Cost)

  • 서선애
    • 한국항만경제학회지
    • /
    • 제24권4호
    • /
    • pp.219-236
    • /
    • 2008
  • 물류비에 관한 연구는 물류비를 구성하고 있는 요소들의 복잡성만큼 물류비를 산출하고, 특성을 분석하는 것에 많은 노력이 요구된다. 이러한 이유로 물류비 산출은 정부차원의 조사에서 많이 이루어지고 있다. 그러나 아직까지 물류비의 산출기준이 명확하지 않고 또한 물류비 항목별 비율을 조사하는데도 많은 시간과 비용이 소요되는 게 사실이다. SCM 주체의 확대에 따라 물류비를 결정하는 요인들 또한 다양해 졌으며, 기업환경의 변화로 인해 물류비 영향요인들의 변화가 있어왔다. 따라서 물류비에 대한 연구는 물류비를 구성하고 있는 요소들의 세분화와 이들의 특성을 구분하여 접근해야 한다. 물류비의 구성요소는 그 기업이 처해있는 상황이나 여건에 의해 이를 구성하는 요소들이 달라질 수 있거나 요소들의 특성이 구분되기 때문이다. 이러한 특성의 분석과 원인에 대한 분석 없이 무조건적으로 수송비나 보관비와 같은 요소절약 전략은 기업의 특성에 맞지 않는 대안이 될 수 있기 때문이다. 따라서 본 연구에서는 물류비 구성요소별 특성 분석을 바탕으로 하여 물류비 산정과 물류비 절감 노력에 기초적으로 가정하고 고려해야 하는 부분들에 대한 연구에 목적을 둔다.

  • PDF

의료보험 수가수준의 조정을 위한 의료보험경제지수 (Medical Insurance Economic Index: MIEI)의 개발 (The Development of the Korean Medical Insurance Economic Index(MIEI))

  • 김한중;손명세;박은철;최귀선;박웅섭;임종건;지영건
    • 보건행정학회지
    • /
    • 제9권1호
    • /
    • pp.156-177
    • /
    • 1999
  • The current method of rate adjustment for inflation is based on the evaluation of the financial performance of hospitals. The method has the disadvantage such as too complicated, expensive process as well as low reliability. This study, therefore, develops the 'Korean Medical Insurance Economic Index(MIEI)' as a new model for the rate adjustment with the use of the macro economic indices. In addition, we calculate the 1992∼1998 rate adjustment with the MIEI, and examines the validity of the MIEI by comparing with the conventional method. Medical costs are classified into nine categories : physician salaries, nurse·pharmacist·medical technician salaries, assistants & others salaries, material cost(by imports), material cost(by domestics), depreciation & rent paid(by imports), depreciation & rent paid(by domestics), power utilities, other administrative costs. Then the category weight which is the ratio of category in the total cost is calculated. Macro economic indices are selected for each cost category in order to reflect the concept of the each cost category and inflation during the year of 1992∼1998. Finally MIEI which integrate all category according to the category weight and selected macro indices is calculated. The mean of hospital MIEI which weighting by amount paid by insurers was cacluated. The result from the application of empirical data to the MIEI model is very similar to that of the current method. Furthermore, this method is very simple and also easy to get social consensus. This MIEI model can be replaced the current method based on the analysis of the financial performance for the adjustment of medical fees.