• Title/Summary/Keyword: crisis construction

Search Result 238, Processing Time 0.03 seconds

Comparison of Domestic and International Green Building Certification Criteria for Application of Environmental Characteristics in Tall Buildings (초고층 건축물의 환경적 특성 반영을 위한 국내.외 친환경 건축물 인증제도 비교.분석)

  • Cha, Min-Soo;Kim, Tae-Hoon;Cho, Hun-Hee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.247-251
    • /
    • 2010
  • Recently due to the crisis of environment and resources, construction industry that effect a lot on nature than any other industries is essentially required to consider environmental element through the life cycle. Lots of advanced countries and Korea have already been running green building certification systems. However, GBCC(Green Building Certification Criteria) in Korea is lack of assessment criteria that apply environmental characteristics of tall building in compared with that in advanced countries. To improve the problem, we compared GBCC with LEED(Leadership in Energy and Environmental Design) through the case study. This study provides preliminary data for reflecting environmental characteristics of tall building in GBCC.

  • PDF

Analysis on the Architectural Characteristics of Super High Rise Apartments (초고층 공동주택의 건축적 특성 분석)

  • Park, Hyeon-Ku;Song, Hyuk;Go, Seong-Seok
    • Journal of the Korean housing association
    • /
    • v.18 no.1
    • /
    • pp.11-18
    • /
    • 2007
  • At the economical crisis of Korea in 1997, self-determined price for apartment and the revision increasing the ratio of residential area for mixed-use residential building were introduced to activate the construction industry, which causes construction companies to build super high rise apartment discriminative and high class orientated. This study aims to classify the super high rise building which is planned to build or built recently and to analyze the architectural characteristics. The objects are 288 unit households in 26 apartment complexes higher than twenty five story since 1998. As a result, super high rise building comparing with existing apartments were being varied in plan types of main building and unit household and in construction types. As for the plan, the number of walls having opening to outdoor were increased and it is considered that high rise building can take advantage of a view, lighting and sunshine. The location of living room that used to be in the center of unit in existing apartment was moved freely without rule.

An ERP Customizing Methodology Based on Process Model

  • Park, Ji-Hyun;Shon, Joo-Chan;Baik, Jong-Myoung
    • Proceedings of the CALSEC Conference
    • /
    • 2001.08a
    • /
    • pp.467-475
    • /
    • 2001
  • As a result of the policy for enforcing the information technology led by government and the effort of companies to get over economic crisis through the reformation of business process, the ERP market is being active. However, because imported ERP products that are supplied currently are designed for standard and rationality, they have a limit to support custom processes of domestic companies in South Korea. On the contrary, ERP products by domestic companies in South Korea are unable to support a consistent methodology of constructing ERP system. This is main reason why much time and costs are consumed than that of an original plan. To succeed in ERP construction, the purpose of ERP setup must be defined. To accomplish this end, it is required to analysis business process completely and to make a plan in detail. For ERP providers, they must support a characterized ERP construction methodology and lower the construction cost by improving an ERP package easy to customize[5].

  • PDF

An Approximate Solution for Diffraction-Induced Shoreline in a Double Headland and Comparison with Field Measurement

  • Shoaib, Muhammad;Kim, Dong Hee;Lee, Jung Lyul
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2016.05a
    • /
    • pp.193-193
    • /
    • 2016
  • In past decades beach erosion has been remarkably severe along coasts of different parts of the world, so that distinct types of coastal protective measures have been implemented; seawalls, wave-dissipating breakwaters, groins, artificial headlands or detached breakwaters have been constructed. In recent years, at Bongpeong beach, South Korea, an artificial headland was constructed to stop the beach erosion. The structure resulted in severe beach erosion of the adjoining places. In order to stop the consequences, another headland was constructed at some distance, but the construction of double headland did not prevent the erosion significantly. This paper focuses on the accurate design of the artificial double headland construction. The study presents the application of equilibrium shoreline empirical formula of parabolic type to estimate the equilibrium stages of the artificial double headland beaches and an analytic solution is presented in the present study. The research has solved the empirical formula of parabolic type to find the optimum result by considering the essential parameters that influence the erosion after the construction of double headland.

  • PDF

An analysis of the accident rate to develop factors for improving industrial accident prevention methods for the projects with sub-contract (도급에 따른 산업재해 예방조치 개선요소 도출을 위한 재해율 분석)

  • Kim, Sung-eun;Lim, Hyoung-chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.216-217
    • /
    • 2022
  • After the financial crisis, the spread of indirect employment, which is an outsourcing method, is gradually becoming common in our society, and the risk of harm is relatively high or the proportion of simple jobs is high. Simple workers have a higher proportion of non-manufacturing industries such as the service industry, and production workers are intensively used in the manufacturing industry. In Article 63 of the Occupational Safety and Health Act, contractors must take necessary safety and health measures. In addition, due to the expansion of the scope of contracts under the Occupational Safety and Health Act, it is necessary to review the appropriateness of industrial accident prevention measures and implementation standards.

  • PDF

Problem Analysis of Sandwich Insulation Wall System (중단열 시스템의 문제점 분석)

  • Park, Jun-Ho;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.166-167
    • /
    • 2015
  • Because of energy crisis at all around the world, there is many method and system which for improving energy efficiency has appeared in construction industry. And then, 20% of entire building energy loss is emissed to exterior of buildings, that is important to building's entire energy efficiency. So, many research has been conducted for imporve exterior energy efficiency and generally it called insulation of wall. Method for wall insulation can be classified interior system and exterior system which defined installation place of insulation board whether interior or exterior of structural wall. However, interior system has thermal problem such as thermal-bridge which can be necessarily occur condensation. and exterior system has constructional problem such as difficult to construction because exterior and finish work so expensive construction cost than other insulation method. Thus, sandwich insulation wall system has been appeared for solving these problems. Sandwich insulation system must using wall connecting things because both side walls is divided by center insulation. At this, Through the heat at wall connecter, it can be occured thermal-bridge and broken insulation board when under construction will be bring negative effect by reducing wall thickness and insulation deficit. At this study, we were compared previous sandwich insulation system and analysis these system's problem for develop the improving constructability and performance of sandwich insulation system.

  • PDF

A Study on activation way of vocational education training for construction skill manpower problems solution (건설기능인력난 해결을 위한 직업교육훈련의 활성화 방안에 관한 연구)

  • Lee, Seung-Jae;Oh, Sangl-Keun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.133-137
    • /
    • 2006
  • Can examine cause that the construction industry is faced in crisis of skill exhaustion in two sides. One is the tribe of actuality production manpower by entry evasion and graying of young man class specially new manpower to the tribe of skill manpower. Another is qualitative decline of skill manpower. Generally, problem of the systematic knowledge tribe and the picking up tribe about new technology etc, exists because learn skill for shoulder beyond in spot. In cutting phenomenon of skill that is depended on personal relationships availability with skilled worker in hereafter, problem that worker who is old or enter through rain skilled worker does not learn all life skill is detected. These problems institute entry of young man class and necessity of systematic vocational education training specially new human strength strongly. This study does presentation of way to promote construction industry entry of young man class and improvement way of vocational education training system that can do to train these by function manpower by purpose.

  • PDF

A Study on the Methodology to Performance Security on the Korea Small/Medium Sized Construction Firms for Venturing into International Market (국내 중소건설업체의 해외 진출 활성화를 위한 건설 보증 확대 방안에 관한 연구)

  • Ahn, Hyoung-Jun;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.225-229
    • /
    • 2009
  • International construction market has been open to other countries, and it derives the development of our overseas construction industry quantitatively as well as qualitatively. Until now, the major companies have an absolute majority in the overseas construction market, and the small and medium enterprises have had difficulty to get a leadership in the international construction market because of the lack of the technical expertise and the capital strength. Especially in the Middle East Asia, our construction companies has touched off a boom, so our market share also has grown, which derived from the up toward ratchet oil prices and a worldwide boom in real estate development. The small and medium enterprise minority have recognition that the overseas construction market is the major company's native territory. But Data from the existing researches and many statistics indicate the most companies tend to underestimate the capacity and international competitiveness of the small and medium enterprises. As a matter of fact, hundreds of small and medium enterprise cut a conspicuous figure in overseas market. Consequently, it is indispensable to overcome the international financial crisis by revitalizing our overseas construction industry which obtains excellent results in international market. this study suggested the ways to expand overseas bonding capacity of Korean financial institution. This study proposed the Korean government to allow Construction Guarantee (former Korea Construction Financial Cooperative) to deal with foreign exchange so that Construction Guarantee will underwrite the overseas construction bond.

  • PDF

A Study on Recruitment Structure of Construction Workforce Through Surveying Wages in the Construction Industry (건설업 임금실태 조사를 통한 건설인력의 취업구조에 관한 연구)

  • Won Kyung-yeon;Park Tae-keun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.246-249
    • /
    • 2004
  • While the recovery of local construction industry is picking up steam, and the number of the employed in the construction industry is on the increase, workforce supply is out of balance in its quality as well as quantity, and with economic crisis facing the country, construction and recruitment methods are in transition. In addition, rising demand in skilled workforce and a workforce in short supply have expedited wage rises and have brought broad effects on construction including productivity and construction time. Such imbalance in construction workforce supply also causes various structural changes by category. This research compares and analyzes data on annual wages of construction workforce, analyzes the state of construction workforce supply, understands recruitment structure in accordance with workforce supply conditions, and looks over characteristic changes in recruitment structure. With reflections drawn from these, this paper suggests responsive measures to future construction circumstances - changes to wages of construction workforce - as well as prospects of future construction workforce supply and measures designed for stable medium and long-term workforce supply.

  • PDF

A Model of the Construction Risk Management System for Site Personnel in the Construction Project (건설현장 실무자를 위한 건설공사 위험관리시스템 모델)

  • Kim, Seon-Gyoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.8 no.4
    • /
    • pp.90-98
    • /
    • 2007
  • Although the construction industry has been rapidly increased at its size and technologies as a locomotive of the economy development in Korea, most construction companies have not paid their attention on the construction risks seriously. However, they have been experienced a lot of business deterioration and project instability during the IMF crisis and WTO entry, and trying to figure out a way to manage the construction intrinsic risks systematically. Some top ranked construction companies have already developed and been implementing a risk management system for the oversea construction projects applying for the marketing and bidding stage, but not for the domestic construction projects during construction phase yet. This paper proposes a construction risk management system model for the site personnel to understand and manipulate very easily in the construction project.