• Title/Summary/Keyword: cost rate

Search Result 4,307, Processing Time 0.028 seconds

The Appropriation and The Use Scheme of Safety Control Cost for Reducing Severity Rate of Injury on Construction (건설재해 강도율 감소를 위한 안전관리비의 책정 및 사용방안)

  • Kim, Byung Soo
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.3D
    • /
    • pp.383-390
    • /
    • 2008
  • Construction safety control system had improved constantly but the severity rate of injury don't reduced, safety level of construction don't progressed as usual. In order to reduce of the severity rate of injury safety control in site is important but it needs to improve form of system that introduce obligation of safety design and design safety appraisement, an effect use method of safety control cost. The safety control cost is problem that reduce than design cost accordance bidding rate and use a little safety facility cost compare with labor cost. This study tried reduce the severity rate of injury by propose effective improvement scheme through relevant problem analysis to the safety control cost and remove caution that the severity rate of injury don't reduced.

주기적 예방보전의 최적정책에 관한 연구

  • Na Myeong Hwan;Son Yeong Suk;Kim Mun Ju
    • Proceedings of the Korean Reliability Society Conference
    • /
    • 2005.06a
    • /
    • pp.115-120
    • /
    • 2005
  • This paper introduces models for preventive maintenance policies and considers periodic preventive maintenance policy with minimal repair when the failure of system occurs. It is assumed that minimal repairs do not change the failure rate of the system. The failure rate under prevention maintenance received an effect by a previously prevention maintenance and the slope of failure rate increases the model where it considered. Also the start point of failure rate under prevention maintenance considers the degradation of system and that it increases quotient, it assumed. Per unit time it bought an expectation cost from under this prevention maintenance policy. We obtain the optimal period time and the number for the periodic preventive maintenance by using Nakagawa's Algorithm, which minimizes the expected cost rate per unit time. Finally, it suppose that the failure time of a system has a Weibull distribution as an example and we obtain an expected cost rate per unit time the optimal period time and the number when cost of replacement and cost of minimal repair change.

  • PDF

A Solution Procedure for Minimizing AS/RS Construction Costs under Throughput Rate Requirement Constraint (작업처리능력 제약하에서 자동창고 건설비용 최소화를 위한 연구)

  • 나윤균;이동하;오근태
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.25 no.4
    • /
    • pp.40-45
    • /
    • 2002
  • An AS/RS construction cost minimization model under throughput rate requirement constraint has been developed, whose objective function includes S/R machine cost, storage rack cost, and interrace conveyor cost. S/R machine cost is a function of the storage rack height, the unit load weight, and the control logic used by the system, while storage rack cost is a function of the storage rack height, the weight and the volume of the unit load. Since the model is a nonlinear integer programming problem which is very hard to solve exactly with large problem size, a solution procedure is developed to determine the height and the length of the storage rack with a fixed number of S/R machines, while increasing the number of S/R machines one by one to meet the throughput rate requirement.

Calculation of Construction Cost Rate to Telecommunications Engineering Service (엔지니어링대가 공사비 요율 산출방법 고찰)

  • Hong, Wan-Pyo;Choi, Kwang-Don
    • Journal of the Korea Institute of Information and Communication Engineering
    • /
    • v.10 no.12
    • /
    • pp.2121-2125
    • /
    • 2006
  • This paper shows the calculation system of construction cost rate to telecommunications engineering service that is based on the tenth article of the Engineering Technique Promotion Law. The existing construction cost rate had been calculated using the experiential statistics or quoted the foreign construction cost rates. This paper apply the theoretical method to calculate the construction cost rate instead of the existing method. To calculate it more reasonably, this paper apply the characteristic own of the current construction cost rate. The result of this paper can be introduced to calculate the construction cost rate for the telecommunication engineering service.

Optimal Periodic Preventive Maintenance with Improvement Factor (개선지수를 고려한 주기적 예방보전의 최적화에 관한 연구)

  • Jae-Hak Lim
    • Journal of Korean Society for Quality Management
    • /
    • v.31 no.3
    • /
    • pp.193-204
    • /
    • 2003
  • In this paper, we consider a periodic preventive maintenance(PM) policy in which each PM reduces the hazard rate but remains the pattern of hazard rate unchanged. And the system undergoes only minimal repairs at failures between PM's. The expected cost rate per unit time is obtained. The optimal number N of PM and the optimal period x, which minimize the expected cost rate per unit time are discussed. Explicit solutions for the optimal periodic PM are given for the Weibull distribution case.

A Study on Accounting for Nursing Cost by Korean Diagnosis Related Groups (K - DRGs) (종합병원(綜合病院)의 간호행위양상(看護行爲樣相)에 따른 간호원가(看護原價) 산정(算定)에 관(關)한 연구(硏究))

  • Oh, Hyo-Sook
    • Journal of Korean Public Health Nursing
    • /
    • v.3 no.2
    • /
    • pp.5-46
    • /
    • 1989
  • The current medical payment Insurance Rates in Korea stipulate charges for medical treatment by the doctor, pharmaceutist, medical technician and maternity nurse. But unfortunately didn't specify those charges for nursing done by the professional nurse. Only basic nursing fee is accounted insufficiently in current medical insurance fee schedule. therefore, Being face with covering entire people by medical insurance by 1991, It seems that the problems pertaining to operating the hospital and medical insurance system would be incessantly expanded in that no mention is made of medical charges rendered by major medical producer service in the current system, For that reason, this study made an attempt to clarify the importance the professional nursing puts of the current medical payment. The purpose of this study was to accounting nursing fee which diveded into the current medical fee schedule. (Method) 1. Data collection; Importance and difficulties in nursing activities was conducted in 'S' National University Hospital. Total nursing activities were selected 72 items which included direct care and indirect care. This study was conducted to evaluating the degree of importance and difficulties according to nursing activities through questionnaire to 204 RN. and so relative difficulties (acuity) were computered because the nursing cost level of each nursing service was differently established by the equivalent coefficient according to degree of relative difficulty and time required. 2. Calculation of cost according to nursing activities; After 47 nursing activities were selected in General surgery nursing units, calculation of nursing cost was as follows Cost of Nursing activity = (relative difficulty X Average hourly wage and benefits of nurse) + material cost of nursing -t- Average nursing administration cost So, Calculated cost by nursing activities was compared to current non-insured and insurance rate. 3. Calculation of nursing cost by K - DRG ; Total of 578 patients who were hospitalized in General Surgery units from January to March 1988 ware classified by K - DRG After estimation of total nursing cost based on the K-DRG, verified the appropriateness of basic nursing fee in medical insurance rate (Results) 1. Analysis of degree of importance and difficulties were 4.16 and 3.67 based on 5 point scale. This score were judged that it is worthy specifying the nursing fee 2. The nursing cost of 47 nursing service items in general surgery patients showed that the average cost of nursing activity was \1374.5 and The lowest cost was \217 of 'oral administration nursing' item, The highest cost was \11,025 of 'saline enematill clear' item 3. The result of comparison between the calculated cost by nursing activities against the current non-insured and insurance rate showed that 13 items(27.7%) involved to payment of insurance rate, 9 items(19.1%) involved to non-insured rate, remainder 25 items (53.2%) were not charged anywhere of total 47 nursing activities 4. When calculated cost by nursing activities was 100. current insurance rate was 62.3, non-insured rate was 176.6. Therefore this showed that most of non-insured rate were higher than calculated nursing cost. The insurance rate, however, were lower than it. Reim-bursement was imputed to non-insured patients. So the current rate system became estrainged from cost system. When Remainder 25 items of nursing activities compared' to \1390 of daily basic nursing fee per patient belonged to payment as a insurance fee schedule, basic nursing fee schedule was 1-2% of calculated cost of nursing activities. Therefore it showed that nursing fee was not counted adequately in it. 5. Nursing cost by K-DRG estimated in chart review based on counting number of nursing activities and length of stay The result showed that average amount of total nursing cost was \183828.1 Comparison of nursing cost calculated by K- DRG and basic nursing fee schedule showed that only 12.3% of nursing cost was charged (Conclusion) From the above research result, It is fact that nursing prime cost should be estimated more accurately and included adequately in current medical payment system. The payment system of nursing activities should be introduced not only nursing activities of drug administration and injection fee belonged to insurance fee schedule but also most nursing activities belonged not to mekical fee schedule. Even if introducing payment system of nursing activities, It should be estimated scientific method of Accounting nursing cost So nurses could offer nursing care of good quality, thereby they could make a great contribution not merely to the convalescence of the patient but to the promotion of the people's health.

  • PDF

Replacement model under warranty with age-dependent minimal repair

  • Park, Minjae
    • International Journal of Reliability and Applications
    • /
    • v.18 no.1
    • /
    • pp.9-20
    • /
    • 2017
  • In this paper, we consider a renewable repair-replacement warranty strategy with age-dependent minimal repair service and propose an optimal maintenance model during post-warranty period. Such model implements the repair time limit under warranty and follows with a certain form of system maintenance strategy when the warranty expires. The expected cost rate is investigated per unit time during the life period of the system as for the standard for optimality. Based on the cost design defined for each failure of the system, the expected cost rate is derived during the life period of the system, considering that a renewable minimal repair-replacement warranty strategy with the repair time limit is provided to the customer under warranty. When the warranty is finished, the maintenance of the system is the customer's responsibility. The life period of the system is defined and the expected cost rate is developed from the viewpoint of the customer's perspective. We obtain the optimal maintenance strategy during the maintenance period by minimizing such a cost rate after a warranty expires. Numerical examples using field data are shown to exemplify the application of the methodologies proposed in this paper.

  • PDF

An economic lot scheduling problem considering controllable production rate and mold cost (생산속도 조절이 가능한 단일설비에서 금형비용을 고려한 경제적 생산계획)

  • 문덕희;조상종;김진욱
    • Korean Management Science Review
    • /
    • v.13 no.3
    • /
    • pp.37-48
    • /
    • 1996
  • This paper presents an Economic Lot Scheduling Problem in which controllable production rates are considered. We also take into account the controllable range of production rate (i.e., maximum and minimum production rate) of each product and the mold cost which varies to the production rate. A mathematical model is developed and an iterative solution procedure is suggested. The objective of this problem is to minimize production related cost and the decision variables are common production cycle time and production rate of each product. As a case study, we adapted this model to the press machine of a company.

  • PDF

Comparative Study of Cost Estimate System in Landscape Architectural Construction - Comparison of Unit Price between Actual Construction Cost and Standard Quantity per Unit - (조경공사 적산방식의 비교연구 - 실적공사비와 표준품셈의 단가비교 -)

  • Jung, Un-Soo;Choi, Key-Soo
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.40 no.2
    • /
    • pp.97-111
    • /
    • 2012
  • This study aims to find a proper construction cost calculation method by comparing unit prices of cost estimate in landscape construction among other public ordering construction projects. There were 7 out of 12 items from the actual work cost in the first half of 2011 were compared. The 12 items were classified as landscape Architectural construction and the 7 items were the approximate standard. As applied construction types, the comparable 35 items out of the 80 actual work cost items applied to 5 sites were compared to the unit price of the standard quantity per unit in March 2011, which was the approximate standard. Actual construction rate of the 7 items in the category of landscape sector was 104.86% for each item and 92.09% as a total construction cost. The high actual construction rate was caused by the high rate of seed spray depending on the status of applying rocks. However, there were more fundamental reasons for the cost generated from aslope treatment for grass and seed spray. So, it requires more detailed regulations on the modification factors for each soil type, the standard and needs to improve theillogical standard quantity per unit system. Actual construction rate of the 35 items in the applied sectors of civil engineering and architecture was 78.65% for each item and 71.31% (70.17%) as a total construction cost. This shows that actual unit cost cannot reflect actual cost structurally and standard quantity per unit system lacks practicality in terms of construction due to thelabor force. 85.1~91.2 % actual construction rate announced by the Ministry of Land and Maritime Affairs referred to the newly switched items. So the result was estimated as actual construction rate. This requires supplementation after verification in order to make the actual work cost produce at a proper rate. Also, standard quantity per unit system needs complementation with these actual data and so on.

Preventive maintenance policy following the expiration of replacement-repair warranty (교체-수리보증이 종료된 이후의 예방보전정책)

  • Jung, Ki-Mun
    • Journal of Applied Reliability
    • /
    • v.12 no.2
    • /
    • pp.57-66
    • /
    • 2012
  • In this paper, we consider the periodic preventive maintenance model for a repairable system following the expiration of replacement-repair warranty. Under this preventive maintenance model, we derive the expressions for the expected cycle length, the expected total cost and the expected cost rate per unit time. Also, we determine the optimal preventive maintenance period and the optimal preventive maintenance number by minimizing the expected cost rate per unit time. Finally, the optimal periodic preventive maintenance policy is given for Weibull distribution case.