Roy, Partho Sarothi;Yoo, Young Don;Kim, Suhyun;Park, Chan Seung
청정기술
/
제28권2호
/
pp.182-192
/
2022
This study provides an overview of the production costs of methane and hydrogen via water electrolysis-based hydrogen production followed by a methanation based methane production technology utilizing CO2 from external sources. The study shows a comparative way for economic optimization of green methane generation using excess free electricity from renewable sources. The study initially developed the overall process on the Aspen Plus simulation tool. Aspen Plus estimated the capital expenditure for most of the equipment except for the methanation reactor and electrolyzer. The capital expenditure, the operating expenditure and the feed cost were used in a discounted cash flow based economic model for the methane production cost estimation. The study compared different reactor configurations as well. The same model was also used for a hydrogen production cost estimation. The optimized economic model estimated a methane production cost of $11.22/mcf when the plant is operating for 4000 hr/year and electricity is available for zero cost. Furthermore, a hydrogen production cost of $2.45/GJ was obtained. A sensitivity analysis was performed for the methane production cost as the electrolyzer cost varies across different electrolyzer types. A sensitivity study was also performed for the changing electricity cost, the number of operation hours per year and the plant capacity. The estimated levelized cost of methane (LCOM) in this study was less than or comparable with the existing studies available in the literature.
In tunneling projects, a significant part of the costs is spent on segment production. By more economically producing, the cost of tunnel construction can be greatly reduced, especially in long and large-diameter tunnels. In the present study, the effect of using the Carousel method in the improvement of the production system performance compared to the conventional Static system has been studied. To carry out the research, a quantitative comparison of cost and production time was carried out for two production methods using the available documentation. The opinions of experts have been obtained using questionnaires and qualitative comparison of cost, time and production quality was done by implementation of statistical analysis. The SPSS software and the univariate t-test were used to analyze the questionnaires. According to the results of statistical analysis with SPSS, the use of the Carousel method will reduce production time and costs along with increasing manufacturing quality. According to the documentation analysis, the Carousel method reduces the cost of production by almost 30% and leads to a reduction of the production time to approximately 40% of the Static moulds system. The Carousel method has a higher production rate, efficiency, and better performance. Research into quantifying the benefits of Carousel method in the production system performance is very limited. This comparison is based on real information from the under construction Tabriz Metro project. This article can be very helpful in choosing the best production method.
본 연구는 공연여건의 성장에 걸 맞는 투자시스템으로의 변화를 모색하는 데 있다. 특히, 제작사들이 원하는 장기공연이나 오픈런 방식으로 공연여건이 조성되고 있는 상황에서 연장공연 여부를 신속히 판단할 수 있고, 제작자와 투자자 양자가 만족할 수 있는 미국식 예산수립 방식으로의 변화모색이 필요한 시점이다. 이에 구체적으로 3가지 방안을 제시하였다. 첫째, 연장공연이나 재공연 여부를 보다 정확히 판단하기 위해서는 현재와 같이 평균비용(Average Cost)을 산출하여 평균수입과 비교하기보다는 미국과 같이 한계비용(Marginal Cost)을 산출해서 비교해야 할 것이다. 둘째, 수익배분에 대한 불합리성을 극복하기 위해서는 현재와 같이 총제작비를 투자모수로 삼기보다는 미국과 같이 총제작비에서 운영비용(Operating Cost)을 제외한 프로덕션비용(Production Cost)만을 투자모수로 삼아야한다. 셋째, 앞서 언급한 한계비용의 산출과 프로덕션비용의 산출을 위해서는 미국 지출예산(Expense Budget)의 이원화 작성법의 국내 적용이 필요하겠다.
This paper presents an Economic Lot Scheduling Problem in which controllable production rates are considered. We also take into account the controllable range of production rate (i.e., maximum and minimum production rate) of each product and the mold cost which varies to the production rate. A mathematical model is developed and an iterative solution procedure is suggested. The objective of this problem is to minimize production related cost and the decision variables are common production cycle time and production rate of each product. As a case study, we adapted this model to the press machine of a company.
This paper considers an integrated one-vendor multi-buyer production-inventory model where the vendor manufactures multiple products in lot at their associated finite production rates. In the model, it is allowed for each product to be shipped in lot to the buyers even before the whole product production is not completed yet. Each product lot is dispatched to the associated buyer in a number of shipments. The buyers consume their products at fixed rates. The objective is to the production and shipment schedules in the integrated system, which minimizes the total cost per unit time. The total cost consists of production setup cost, inventory holding cost and shipment cost. For the model, an iterative optimal solution procedure with shipment consolidation policy incorporated. It is then tested through numerical experiments to show how efficient and effective the shipment consolidation policy is.
In this paper, we propose a lot-sizing and scheduling problem that seeks to minimize the sum of production cost and inventory cost over a given planning horizon while considering idle state of a machine in a batch production system. For this problem, we develop an integer programming model. And, we develop an efficient 2-phase heuristic algorithm to find a high quality feasible solution within reasonable time bounds. In the first phase, we seek to minimize the production cost by assigning batches to machines. Then, in the second phase, we find a production sequence of batches that reduces the inventory cost, while considering adding or deleting idle states between batches. Computational results show that the developed heuristic algorithm finds excellent feasible solutions within reasonable time bounds. Also, we could significantly reduce the total cost consisting of production cost and inventory cost by using the developed heuristic algorithm at a real manufacturing system that produces zinc alloys.
Asia Triple HIn this study an attempt was made to determine the cost of producing fodders at Savar Dairy Farm (SDF). For this purpose, all seasonal fodders, such as Maize, Jowar, Cowpea and Oat and all perennial fodders, such as Para and Napier were studied. The highest acreage of land was allocated to high-land Para (33.8%) and the lowest acreage (2.7%) was devoted to Cowpea. Jowar attained the highest yield (74.2 tons) per hectare and Maize attained the lowest yield (25.8 tons/h). The highest cost per hectare was attributed to Jowar (TK. 20944.18) while the lowest cost was attributed to low-land para (TK. 10349.86). The cost of production of fodder per kilogram was the highest (TK. 0.66) for Maize and the lowest for Oat (TK. 0.24). The cost of production of low-land Para was much lower than that of high land Para. The per kilogram cost of silage production was the highest (TK. 0.71) for Maize and the lowest (TK. 0.31) was for Napier. The gross return analysis further showed that the highest net margin and B:C ratio were observed for Napier followed by Low-land Para, Jowar, Oat, Cowpea, High-land Para and Maize. Therefore, those fodders whose B:C ratios and yield/ha were higher should be allocated more area of land to stimulate increased returns to SDF in the future is suggested.
It can be obtained from hydrocarbon and water, specially production of hydrogen from natural gas is most commercial and economical process among the hydrogen production methods, and has been used widely. However, conventional hydrogen production methods are dependent on fossil fuel such as natural gas and coal, and it may be faced with problems such as exhaustion of fossil fuels, production of greenhouse gas and increase of feedstock price. Thermochemical hydrogen production by nuclear energy has potential to efficiently produce large quantities of hydrogen without producing greenhouse gases. However, nuclear hydrogen must be economical comparing with conventional hydrogen production method. Therefore, hydrogen production cost was analyzed and estimated for nuclear hydrogen as well as conventional hydrogen production such as natural gas reforming and coal gasification in various range.
Dynamic production planning problems are to determine the optimal production times and production quantities of product for discrete finite periods. In previous many researches, the solutions for these problems have been developed through the algorithms using dynamic programming. The purpose of this research is to suggest the new algorithm using linear programming. This research is to determine optimal production quantities of product in each period to satisfy dynamic for discrete finite periods, minimizing the total of production cost and inventory holding cost. Cost functions are concave, and no backlogging for product is allowed. The new algorithm for capacity constrained problem is developed.
The optimal greenhouse scales for controlled tomato should be studied because the increase of oil price and labor costs following the shortage of workforce makes greenhouse cultivation hard to gain profits. The purpose of this study is to estimate optimal production scales by greenhouse types for controlled tomato. The translog cost function is estimated based on the production cost survey data. The results can be summarized as follows: First, the average production cost of controlled tomato per kg decreases as the production scale increases. Second, according to the tomatoes farm of standard farming income data of RDA, the minimum production scale is 23 ton. Third, the estimated output of single-span greenhouse considering production scale with minimum average cost is 345 ton and production cost per kg is 1,476 won. The corresponding figures of multi-span greenhouse are 415 ton and 936 won, respectively. The study results can be used as basic materials for efficient decision making of tomato farmhouses and novice farmers. Also, the study shows that multi-span greenhouse should be encouraged to be built, since it requires lower marginal cost than single greenhouse. The results of this paper will help increase the income of farmhouses and cut expenses for the coming years.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.