• 제목/요약/키워드: cost model

검색결과 7,810건 처리시간 0.035초

PRICE 모델을 이용한 K1전차 수명주기 비용추정 (K-1 Tank Life Cycle Cost Estimate Using PRICE Model)

  • 강창호;강성진
    • 한국국방경영분석학회지
    • /
    • 제25권2호
    • /
    • pp.44-61
    • /
    • 1999
  • Cost estimation has posed a significant challenge to estimators, planners, and managers in both government and military. Considerable historical evidence shows that accurate cost estimation has been difficult to achieve across a wide range of projects, including weapon systems. This paper introduces new cost estimating concept, CAIV(Cost As an Independent Variable) and a cost estimating case study using PRICE model, computer aided parametric estimating models(CAPE) for K1 tank cost estimate. CAIV concept is to set realistic but aggressive cost objectives easily in each acquisition program and to achieve cost, schedule, and performance objectives considering various managing risks with a project manager and industry teams. The Price model is one of computer aided cost estimating models and widely used in U.S. defense system analysis as a tool for CAIV. We analyze theories, inputs, outputs of the PRICE model and present a case study for K1 tank to estimate costs in requirement and concept phase, program and budgeting phase, and life cycle phase. Finally we obtain results that the Price model can be used in various phases of PPBEES depending upon available data and time.

  • PDF

공동주택의 관리비 추정모델 연구 (A Study on the Maintenance Cost Estimation Model of the Apartment Housing)

  • 이강희;양재혁;채창우
    • 한국주거학회논문집
    • /
    • 제21권2호
    • /
    • pp.59-67
    • /
    • 2010
  • The maintenance cost plays a important role to plan the scale of the apartment housing such as a number of household, building area and building type. Therefore, it is required to forecast the cost considering various maintenance characteristics. The maintenance characteristics are floor area, number of household, heating type, site area and etc.. In addition, the maintenance cost are classified into 5 area. These are a personal expense, facility maintenance cost, energy and water cost, insurance and sanitary cost. These five cost area are related with various characteristics and brought up the estimation model using the stepwise multiple regression analysis. The energy and heating cost share over the 50% in the total cost and the personal expense cost shares about 40%. The personal expense cost per area is 5,272 won/$m^2{\cdot}yr$ irregardless of heating type and the district heating type is a higher cost than other type. In facility maintenance cost, the central heating type is 2,015 won/$m^2{\cdot}yr$ and higher than other type. The estimation models have good statistics in each model. Most of the model have a determination coefficient over 0.7 and Durbin Watson value between 1.5 and 2.5.

코스트 중요항목 분석을 통한 공사비 예측모델 연구 (Development of Construction Cost Model through the Analysis of Critical Work Items)

  • 이유섭
    • 한국건설관리학회논문집
    • /
    • 제4권4호
    • /
    • pp.212-219
    • /
    • 2003
  • 건설공사에서 공사비 계획 및 관리를 위한 코스트 모델은 공사입찰$\cdot$계약단계에서 도급공사비 결정에 중요한 기능을 담당할 뿐만 아니라 건설사업 수행 전 단계에 걸쳐 건설공사에 소요될 비용을 추적, 관리하여 주어진 예산범위 내에서 최적의 목적물을 설계 시공하여 궁극적으로 발주자의 투자비용에 대한 가치를 극대화하고 비용관리업무의 적정성을 도모하는 기능을 담당하고 있다. 그동안 내역입찰방식을 널리 채택하고 있는 건설공사에서 내역서는 공사비 예측 및 계획 등 공사관리에 있어서 중요한 수단으로 활용하여 왔으나, 현행 내역모델은 공사비의 예측 및 비용관리 측면에서 지나치게 상세하며, 공사계획 및 관리 업무와 연계시키는데도 한계가 있는 것으로 지적되고 있다. 건설공사를 구성하는 세부 단위작업에 소요되는 비용은 모두 중요한 관리대상이지만, 단위작업의 내용에 따라 비용이 차지하는 비중과 코스트 결정에 미치는 영향력에는 차이가 있다. 이러한 비용결정의 구조적 메커니즘에 착안하여 본 연구에서는 건설공사 비용결정에 중요한 영향을 미치는 작업내용을 규명하여 정확성을 유지하면서 단순 간결한 코스트 예측모델을 제안 및 검증하는 것을 목적으로 하고 있다.

투입노력 양에 기반한 소프트웨어 유지보수 비용산정 모형 (A Software Maintenance Cost Estimation Model based on Real Maintenance Efforts)

  • 정은주;유천수
    • Journal of Information Technology Applications and Management
    • /
    • 제19권2호
    • /
    • pp.181-196
    • /
    • 2012
  • The cost of software maintenance occupies about two thirds in the software lifecycle. However, it is not easy to estimate the cost of software maintenance because of various viewpoints about software maintenance, unclear estimation methods, and complex procedures. Until now, the cost estimation model has used compensation factors for software characteristic and environment on the basis of program size. Especially, most of existing models use maintenance rate of total software cost as a main variable. This paper suggests the software maintenance cost estimation model that uses the result of calculating real maintenance efforts. In this paper, we classify functional maintenance and non-functional maintenance as software maintenance activity type. For functional maintenance, present function point of target software is needed to evaluate. The suggested maintenance cost evaluation model is applied to a software case in public sector. This paper discusses some differences between our model and other modes.

PMO 대가 산정모형의 개발 (A Study on the Development of PMO Cost Estimation Model)

  • 서용원;이덕희
    • 한국IT서비스학회지
    • /
    • 제13권4호
    • /
    • pp.169-188
    • /
    • 2014
  • Recently the complexity and difficulty of the IT projects are increasing due to technological and environmental risks, resulting in the adoption of PMO(Project Management Office) onto IT project management practices, including public area projects. For example, the Korean government regulated the application of PMO onto large scale public IT projects. However, since there has been no reliable method to estimate the cost to execute PMOs, a PMO cost evaluation model to support the budget and cost planning of PMO projects is required. Thus, the purpose of this research is to develop a systematic cost evaluation model for PMO projects. We identified the dimensions that determine the PMO execution cost to be the scale of the subject project, the technical difficulty level of the subject project, and the tasks to be executed in the PMO project. Based on the determinants, the PMO execution cost model were developed from historical data and experts opinion. Upon verification, the validity of the developed model has high level of consistency compared with their experiences of real PMO project costs.

활동기준원가시스템의 원가동인 선택 및 병합 (Cost Driver Selection and Aggregation for Activity-Based Costing)

  • 이한;이경근
    • 경영과학
    • /
    • 제17권2호
    • /
    • pp.115-124
    • /
    • 2000
  • Activity-Based Costing(ABC) is an accounting cost system which allocates the overhead cost to each cost object more accurately. ABC system achieves improved accuracy in estimating the cost of cost object by using multiple cost drivers to trace the cost of activities to the cost objects associated with the resources consumed by those activities. The selection and the aggregation of these cost driver candidates can pose difficult problems. This paper deals with these problems in mathematical programming approach. The first model is formulated as an integer programming model in cost driver selection and the second model is formulated as multi-objective goal programming model in reduction of cost drivers already selected.

  • PDF

실적자료를 활용한 PRICE 모델의 보정방안 연구 (A Study on Calibration of PRICE Model Using Historical Cost Data)

  • 정태균;이용복;강성진
    • 한국국방경영분석학회지
    • /
    • 제36권1호
    • /
    • pp.29-38
    • /
    • 2010
  • In Korea weapon system acquisition processes, it's required a cost estimation report obtained from a commercial cost model. The PRICE model is generally used as a cost estimation model in Korea. However, the model uses American historical R&D data and it's output cost component is different from our cost component of defense accounting system. Also, we found that estimating results show about 10% of difference when we comparing with actual costs in 44 finished weapon acquisition projects. There are some limitations in calibration to increase an accuracy of the PRICE model because it's difficult obtain good real input data, detailed cost and technical data in low level WBS. So, only 8% of the defense R&D projects are calibrated and validation of calibration results is more difficult. Therefore, we studied the standard calibration process and performed the calibration about the MCPLXS/E parameters of the PRICE model based on actual cost data. In order to obtain a good calculation result, we collected the actual material costs from the defense industry companies. Our results can be used for an reference in similar weapon system R&D and production cost estimation cases.

웹 기반 VE Cost모델 분석 시스템의 개념적 모형 (A Conceptual Model of Web-based VE Cost Model Analysis System)

  • 이창홍;오치돈;박찬식
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2007년도 정기학술발표대회 논문집
    • /
    • pp.416-419
    • /
    • 2007
  • 국내의경우, 초기 Cost모델 작성을 위한 비용관련 정보의 축적이 체계적으로 이루어지지 않고, 과거에 수행된 유사 프로젝트의 실적데이터에 대한 정보가 부족해 주 기능 대비 비용에 대한 효용성을 명확히 판단하기 어려워 신뢰할 수 있는 대상선정이 이루어지지 않고 있다. 따라서, 본 연구는 과거 수행된 유사 프로젝트의 비용 정보를 축적, 공유, 활용, 학습할 수 있고, VE활동의 대상선정을 위해 준비단계에서 수행되는 Cost모델의 체계적이고 효율적 분석이 가능한 웹기반 'Cost 모델 분석 시스템(Cost Model Analysis System: CMAS)'의 개념적 모형을 제시하고자 한다. 본 연구에서 제시한 Cost모델 분석 시스템의 개념적 모형을 활용하여 실질적인 시스템이 구축된다면 효과적인 VE 수행을 위한 합리적이고 신뢰성 있는 대상선정이 이루어질 것으로 판단된다.

  • PDF

경량전철 사업의 SE 적용을 위한 비용 추정 모델 연구 (A Study on the Cost Model for Implementation of SE for the Light Rail Transit Project)

  • 김철환;한명덕;이재홍;이창영
    • 시스템엔지니어링학술지
    • /
    • 제8권1호
    • /
    • pp.1-7
    • /
    • 2012
  • This research aims to propose a model to estimate the appropriate SE Cost rate to the total project cost when systems engineering applied to light rail transit project. In this research an investment cost estimation model is proposed with reference to COSYSMO (Constructive System Engineering Cost Model). This model includes four input factors such as requirement numbers, interface numbers, algorithm numbers, and scenario numbers. When 2600 requirement numbers are considered on a proposal document with 350 pages in a light rail transit specification of 500 billion~trillion won scale, COSYSMO demo version estimates 42.5 billion won of SE cost (about 5% of total project cost or about 10% of E&M cost).

장대 PC교량의 최적 내진설계 및 성능개선을 위한 최소 기대 Life Cycle Cost 모델 (Minimum Expected Life Cycle Cost Model for Optimal Seismic Design and Upgrading of Long Span PC Bridges)

  • 조효남;임종권
    • 한국전산구조공학회:학술대회논문집
    • /
    • 한국전산구조공학회 1999년도 봄 학술발표회 논문집
    • /
    • pp.305-312
    • /
    • 1999
  • This study is intended to propose a systematic and practical life cycle cost(LCC) model for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges. The LCC models consist of five cost functions such as initial cost, repair/replacement cost, human losses, road user cost, and indirect losses of regional economy. The proposed model Is successfully expressed in temrs of Park-Ang damage indices and life cycle damage probability obtained from SMART-DRAIN-2DX which is an existing algorithm for nonlinear time history analysis. The proposed LCC model is successfully applied to a viaduct constructed by PSM, in Seoul. Based on the observations, the proposed systematic procedure for the formulation of LCC model may be useful for the development of the reliability-based seismic safety and cost-effective performance criteria for design and upgrading of long-span PC bridges.

  • PDF