A Study on the Cost Model for Implementation of SE for the Light Rail Transit Project

경량전철 사업의 SE 적용을 위한 비용 추정 모델 연구

  • Published : 2012.06.30

Abstract

This research aims to propose a model to estimate the appropriate SE Cost rate to the total project cost when systems engineering applied to light rail transit project. In this research an investment cost estimation model is proposed with reference to COSYSMO (Constructive System Engineering Cost Model). This model includes four input factors such as requirement numbers, interface numbers, algorithm numbers, and scenario numbers. When 2600 requirement numbers are considered on a proposal document with 350 pages in a light rail transit specification of 500 billion~trillion won scale, COSYSMO demo version estimates 42.5 billion won of SE cost (about 5% of total project cost or about 10% of E&M cost).

Keywords

References

  1. KSX ISO/IEC 15288 (2009), "정보기술.시스템 및 소프트웨어 공학 생명주기프로세스",기술표준원, 2009.
  2. 한석윤 외, "경량전철시스템 및 운영곡고도화를 위한 시스템엔지니어링 적용기술개발 사업 1차년도 연구보고서",한국철도기술연구원,2011.
  3. 김철환 외, '경량전철사업에 시스템엔지니어링 적용효과추정연구',한국철도기술연구원, 2011
  4. INCOSE, System Engineering handbook v3.1,2011.
  5. Eric Honour, "Value of Systems Engineering", INCOSE, 2004
  6. Eric Honour, "Systems Engineering Return on Investment", defense and System Institute, 2009.
  7. University of Sourthern California, "Constructive Systems Engineering Cost Model (COSYSMO)", 2010.
  8. University of Sourthern California, "Constructive Systems Engineering of Cost Model(COCOMO) II Model,2010.