• Title/Summary/Keyword: contractor system

Search Result 189, Processing Time 0.024 seconds

Importance-Difficulty Analysis for DQMS Requirements (국방품질경영시스템 요구사항에 대한 중요도-난이도 분석)

  • Kim, Yun-Hi;Park, Jong Hun;Lee, Sang Cheon
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.40 no.3
    • /
    • pp.49-58
    • /
    • 2017
  • The DQMS (Defence Quality Management System) is a certification system that manages participating companies to improve the quality of munitions. Since Korean Defense Specification (KDS) for DQMS certification that was established by adding military requirements based on the ISO quality standard, many companies complain that they should pay too much effort into the preparation process. However, it is hard to find helpful information on the preparation process because we have been only interested in the effect of DQMS acquisition. The purpose of this paper is to provide helpful information to companies preparing for DQMS certification. We surveyed the degree of difficulty and importance of the DQMS requirements from the companies with certification experience, and performed IDA (Importance-Difficulty analysis) by dividing the companies into the main contractor and the subcontractor. The result of IDA shows that there is a different recognition to the DQMS certification between main-contracting and sub-contracting companies. Subcontractor has more difficulties than main contractor in preparing the DQMS certification. In addition, we are able to identify the difficult and important requirements in the preparation process to the DQMS certification. Both main contractor and subcontractor have difficulty to the requirements related to configuration or validation such as 'customer controls configuration', 'configuration review shall be implemented' and 'design and development validation documentation.' The requirements related to customers are important to main contractor but the subcontractor regards difficult requirements as important ones. The result of this paper would be helpful to both the company preparing for DQMS and the munitions quality assurance agency.

A Improvement of Sub-contractor Management in Domestic Building Construction Sites - Through Specialized Quality Work of Sub-contractors (국내 건설공사 현장의 하도급관리 개선방안 - 하도급자의 품질업무 전문화를 통하여)

  • Son Hyun-Duck;Lee Jae-Seob
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.292-295
    • /
    • 2002
  • A purpose of subcontractor management succeed in construction project. Specially in the subcontractor management of quality management, it is necessary that subcontractors not only acquire ISO 9000 quality system certification but also continuously and without a break fulfill ISO 9000 quality system. As a result, we proposed that a general contractor play an important role in a manager of subcontractors to keep up the ISO 9000 duality system of subcontractors.

  • PDF

A Study on the Development of CITIS(Contractor Integrated Technical Information Services) (CITIS(Contractor Integrated Technical Information Services)구현에 관한 연구)

  • Jeong, Seok-Chan;Woo, Hoon-Shik;Cho, Chang-Hyuk;Paik, Jong-Myung;Ju, Kyung-Joon
    • IE interfaces
    • /
    • v.10 no.3
    • /
    • pp.1-10
    • /
    • 1997
  • CALS, being widely adopted by industry, is a strategy to share integrated digital product data through a set of standards to achieve effieciencies and competition in business. For CALS implemetation, creating a shared information system is necessary and CITIS is proposed for that. CITIS shall provide on-line access and automated exchange of all the technical information between contractor and service provider, and the function of CITIS is difined in MIL-STD-974. In this paper, regarding CITIS as a infrastructure of information for CALS, we proposed CITIS server system which comprise global data sharing software, global data management system, workflow manager, and configuration management maneger.

  • PDF

A Certification System Using PKI for CITIS Users (PKI 를 이용한 CITIS 사용자 인증 시스템)

  • Jung, Woo-Phil;Park, Jung-Sun
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.26 no.4
    • /
    • pp.411-420
    • /
    • 2000
  • Among the standards of CALS, CITIS(Contractor Integrated Technical Information Service) is a standard in information share procedure which manages all data and services occurred between a contractor and a purchaser. CITIS services have some security problems like authentication problem and repudiation problem, when they are implemented using the Internet. To solve these problems, CITIS needs a user certificate system which can allow to access important information only to qualified users. This paper proposed a PKI(Public Key Infrastructure) Certificate Authority for CITIS, and created a real User Certificate System which can be adjusted to circumstances of real CITIS.

  • PDF

Research on the Establishment of Contractor Centered Safety Management System to Reduce Construction Disaster (건설재해 저감을 위한 발주자 중심의 안전관리체계 구축에 관한 연구)

  • Kia, Seongho;Park, Namkwun
    • Journal of the Society of Disaster Information
    • /
    • v.10 no.4
    • /
    • pp.503-510
    • /
    • 2014
  • Large scale construction disasters such as recent Noryangjin flooding incident and Banghwadaegyo collapse accident are occurring persistently. Thereupon, the role and responsibility of the various construction participants are considered as major element to reduce disaster at the construction site. Construction industry is a process of building construction object by going through planning, designing, constructing, and maintenance controlling in which various bodies of act, from contractor to designer and builders, participate. However, the subject of current safety supervision is focused on the builder, the contract enterprise which directly employs workers, while the safety activity participation of the contractor, who exerts decision-making authority at the highest level, is excluded. Therefore, this study understands the level of awareness and reality on the safety activity of each construction participants from which the improvement plan on the contractor centered safety management system is proposed.

An Enhanced Operating Scheme of Evaluation System for Construction Works -Focused on the KNHC System (시공평가제도의 효과적 운영방안 -대한주택공사 제도를 중심으로)

  • Choi Jin-Woo;Jung Sang-Bong;Park Chan-Sik
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.279-284
    • /
    • 2001
  • The owner's evaluation system about the contractor's work performance is used to give the contractor some advantages or disadvantages. According to the result of evaluation of the contractor's performance in the given construction project, the owner identify the good contractors and give them some merits in the future project bidding. However, the system used in the Korean construction industry has caused many problems and has been operated improperly. As a case study, this paper investigates the current problems existed in the KNHC (Korean National Housing Corporation) evaluation system and suggests some directions for its efficient operation. In doing so, the study performed interviews with the KNHC officers and the related contractors, using a structured questionnaire

  • PDF

Effect of Employer's Power on Contractor' s Behavior in the Construction Industry (건설 산업에서 발주자의 권력이 시공사의 행동에 미치는 영향)

  • Kim, Jung-hoon;Lee, A-yeon;Kim, Seung-chul
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.41 no.3
    • /
    • pp.21-29
    • /
    • 2018
  • The cooperative relationship between Employer and Contractor in the construction industry is the most important factor to achieve the project success. Employer shall draw the Contractor's cooperative behavior during executing the project. A study on the impact of the Owner's power on the contractor's cooperative behavior is rare in the construction industry in Korea even though the negative impact of the high-power distance between the Employer and the Contractor has been a hot issue in Korea. In this empirical study, it is shown that the Employer's power can address the contractor's cooperative behavior. The respondents were mostly employees in the domestic construction companies who have experienced in the construction projects. The total number of respondents was 317 effectively. The multiple regression analysis using SPSS 21.0 were conducted to verify the hypotheses. In conclusion, the Mediated Power is positively associated with the In-Role Behavior and with the Extra-Role Behavior. Some of Non-Mediated Power is positively associated with the In-Role Behavior and with the Extra-Role Behavior. It seems that the Contract underestimate the Employer's Expert Power. It was known that the cooperative power caused by Non-Mediated Power is good for long term relationship of the business to business transaction. So it is highly recommended that the Employer shall foster its expertise.

Web-based Coordination System for Daily Work Report between Contractor and Subcontractor (원수급업체와 하수급업체간 웹기반 작업일보 연동시스템 개발)

  • Seo Hae-Jun;Koo Kyo-Jin;Um Ik-Jun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.370-375
    • /
    • 2004
  • The management of daily work report is very important due to the variety of work trade and activities. Although various project management systems have been developed to effectively deal with various task in site, they are not in practical use due to the non-coorperative attitude of sub-contractors. This is the reason the system are not developed in the focus of sub-contractors, but main contractors and the detail information about daily work report is omitted or lost in the collection process by contractors. Therefore the purpose of this study was to propose the Web-based coordination system for daily work report between contractor and sub-contractors

  • PDF

Prediction Survey on Construction Guarantee Market Due to the Restructuring of the Construction Industry's Production System (건설산업 생산체계 개편에 따른 건설보증시장 변화 예측 조사)

  • Kim, Sungil;Chang, Chulki;Yoo, Hyunji
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.1
    • /
    • pp.63-71
    • /
    • 2021
  • The construction guarantee market is a rear market affected by changes in the construction industry and market. As the restructuring of the construction industry's production system is being carried out, such as the abolition of regulations on business field between general and specialty contractors, major changes are expected not only in the construction market but also in the construction guarantee market. In construction guarantee market, there are currently three Contractor Financial Cooperatives, which are divided based on business field and business type(General, Specialty and Plant & Mechanical). The abolition of business field regulation will have various effects on construction guarantee market, such as forming a competitive structure among the three Contractor Financial Cooperatives. Therefore the role of the construction guarantee institutions are also required to change. This study predicted the changes in the construction guarantee market after the restructuring of construction industry and analyzed the ripple effect on the market. This study reviewed the details of the reorganization plan on the construction industry, policies and statistical data related to construction guarantee, and lastly conducted the survey on each member of the three Contractor Financial Cooperatives to analyze the usage behavior in the future guarantee market. Based on the result of this study, the members of both the General Contractor Financial Cooperative and Specialty Contractor Financial Cooperative are not willing to change the existing institutions, but a lot of them are expected to use other institutions in duplicate. The members of the Plant & Mechanical Contractor Financial Cooperative are most willing to use other guarantee institutions.

Legal Direction of Defect Warranty Liability in the Korean Construction Industry

  • Cho, Young-Jun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.18 no.2
    • /
    • pp.195-202
    • /
    • 2018
  • The defects that are bound to arise in most construction projects cause disputes among the contracting parties regarding the defect warranty liability (DWL)guaranteed by the retention of the contractor's performance security at the end of the performance period of the contract. Most current projects involve a multiple-tier contractual relationship, causing the liability for some defects to overlap. In addition, many construction projects are made up of multiple detailed work types which an expert hired by the owner inspects the part completed by the contractor and pays an interim payment. However, after the completion of work, the contractor will still hold the defect warranty liability. In a scenario in which the work is delayed due to reasons for which the owner is responsible, the defect warranty liability period is also increased, imposing an additional burden on the contractor. In this study, basic research was carried out with the goal of reducing problems related to defect warranty liability Problems related to defect warranty liability cases and the nature of the defect warranty liability period were investigated. Possible solutions to the problems caused by the DWL that were suggested include the separation of the negligence liability period and the strict liability period, as well as the introduction of a retention money system.