• Title/Summary/Keyword: construction-specific

Search Result 1,843, Processing Time 0.024 seconds

Probabilistic Risk Assessment System Model and Methods for Construction Projects (건설공사의 확률적 위험도분석 시스템 모형 및 해석방법)

  • 조효남;최현호;김윤배
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 1999.04a
    • /
    • pp.3-10
    • /
    • 1999
  • This paper presents probabilistic risk assessment system model and methods for general construction projects and demonstrates the applicability of the approach to a specific subway construction project. The proposed system model entitled Integrated Risk Assessment System(IRAS) for construction projects is composed of four steps, which is newly reorganized and improved in order to be easily adjusted for a systematic PRA of construction projects. Based on the proposed model, and integrated prototype software is then developing for computer-aided PRA of construction projects under the environment of the graphic-user interface, which will be successfully applied to construction projects.

  • PDF

Measuring Performance in Egyptian Construction Firms Applying Quality Management Systems

  • Abd Elhamid, Manal S.;Ghareeb, Sahar.Sh.
    • Journal of Construction Engineering and Project Management
    • /
    • v.1 no.2
    • /
    • pp.18-27
    • /
    • 2011
  • Egyptian construction firms (ECF) started recently to adopt quality management system (QMS) as a way to develop and improve their performance as previous studies have shown. However, considering all the firm's aspects in a competitive way is a crucial process for the ECF's culture. This research is trying to indicate the role of the QMS implementation in measuring performance (MP) through developing a model for measuring performance at the organizational level, and to explore its impact on the organizations that adopt QMS. This model is based on specific elements and their related indicators which have been derived from national approaches and models of MP. This model determines the performance level (PL) of the organization that is measured by means of a point system. Weights of the elements in the point system considered both the elements' importance in the international models and its real practice in the ECFs. This model has been validated using another questionnaire and the majority of surveyed experts agreed that the proposed model can be applied effectively.

A study on the system safety plan of skyscraper construction work (초고층 빌딩 건설공사의 시스템안전 방안 연구)

  • Jo, Jae Hwan
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.1
    • /
    • pp.21-27
    • /
    • 2014
  • In this paper, a research was carried out to extract the more concrete and systematic method for the safety management of skyscraper construction. Here, the most risky processes in the construction of skyscrapers were extracted through the general risk evaluation for safety management processes and their characteristics and trends were analyzed for the suggestion of safety management methods and safety inspection factors in the construction of skyscrapers, as well as for the suggestion of prevention measures for major disasters. The result of this paper will be well used as a basic data in establishing the manual necessary for executing the construction of skyscrapers more safely than the present where there is no specific direction for the safe management of skyscraper construction yet.

Present Condition and Development of Mechanical Utility System for Modular Construction (모듈러 건축용 기계설비 시스템 현황 및 개발에 관한 연구)

  • Lee, Jae-Soo;Choi, Jun-Sok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.19-20
    • /
    • 2016
  • Domestic construction industry has experienced many difficulties as it has been on a downward. It's a way that active modular structure market to solve this problem. However, as Modular structure technical standard in Korea is in the early stages, our modular factory maufactured rate is almost 40% lower than overseas. Besides, there is less design diversity so it just applies for a few buildings like low-rise building and general group barrackes. To deal with these problems, it is essential to modulating the equipment which can improve the production rate. This will help to ensure the quality, shortening of the construction period, the reduction of labor costs. We have defined the name of segmented by each installation location of the equipment to modulating equipment. And it was examined the suitability of the modulating of the location-specific utility system. The results of the analysis are discussed on the page.

  • PDF

A Basic Study for Building VET/CM Leading Construction VE Process (VET/CM 주도형 시공VE 프로세스 구축을 위한 기초연구)

  • Song, Hyun-Jang;Cha, Yong-Woon;Lee, Hyun-Jong;Hyun, Chang-Taek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.05a
    • /
    • pp.233-234
    • /
    • 2016
  • Design phase VE that is mandatory conducted in public construction project more than 10 billion won in accordance with the relevant laws and regulations has been activated in domestic application case of Value Engineering. But construction VE has been applied in specific project. Therefore, this study aims to deduce problems of poor performed construction VE through review of precedent researches and depth interviews of expert group. As one of the improvements this study suggest that a building plan which is VE process leading VET/CM.

  • PDF

A Study on Design Additional Fee Estimation by Change Order - Focused on Design Stage - (설계변경에 따른 설계추가용역비 산정에 관한 연구 - 설계단계 중심으로 -)

  • Park, Won-Ho;Paek, Joon-Hong
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.05b
    • /
    • pp.155-158
    • /
    • 2009
  • During the construction project period, a lot of change orders happen in the design and construction stage Especially, The change order during construction stage causes the huge construction cost increase and duration delay. Accordingly, research on the change order of the construction stage is being progressed relatively active in the design stage, but the design changes are rarely made. In the design stage, the owner has to pay a design addition cost when change order due to the demands of owner happens. However Korea has not the specific standard about design additional cost in design stage. Therefore, this study analyzes problems of design additional cost estimation methods through the case study, and then indicates the method that the ratio distributes to details dividing design tasks and the method of the PM(Project Management). Eventually, this study expects to minimize claim related the design additional cost in design stage.

  • PDF

COVID-19 and Return-To-Work for the Construction Sector: Lessons From Singapore

  • Gan, Wee Hoe;Koh, David
    • Safety and Health at Work
    • /
    • v.12 no.2
    • /
    • pp.277-281
    • /
    • 2021
  • Singapore's construction sector employs more than 450,000 workers. During the height of the COVID-19 pandemic in Singapore from April to June 2020, migrant workers were disproportionately affected, including many working in the construction sector. Shared accommodation and construction worksites emerged as nexuses for COVID-19 transmission. Official government resources, including COVID-19 epidemiological data, 43 advisories and 19 circulars by Singapore's Ministries of Health and Manpower, were reviewed over 8 month period from March to October 2020. From a peak COVID-19 incidence of 1,424.6/100,000 workers in May 2020, the incidence declined to 3.7/100,000 workers by October 2020. Multilevel safe management measures were implemented to enable the phased reopening of construction worksites from July 2020. Using the Swiss cheese risk management model, the authors described the various governmental, industry, supervisory and worker-specific interventions to prevent, detect and contain COVID-19 for safe resumption of work for the construction sector.

Investigation on the Manpower Staffing Plan Utiling Density Analysis Method (밀도분석에 의한 공동주택 현장관리 인력 배치계획 분석)

  • Kwon, Gi-Deoc;Kim, Sun-Kuk;Sohn, Hyo-Won;Choi, Jae-Hwi;Lee, Dong-Hoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.119-123
    • /
    • 2010
  • Recent economic slump has highlighted the needs for the construction industry to develop strategies to improve productivity and overhaul organization structure. Notably, it is urgent to improve productivity of apartment building construction projects that account for about half of the aggregate revenue of building construction projects in Korea. As construction site management manpower staffing plan has close relation with the productivity of building construction, it is essential to staff construction sites adequately in consideration of site conditions and characteristics. However, construction companies of Korea are still far from developing site management manpower staffing plan in reference to quantitative standards. Therefore, this research aims to analyze site management manpower staffing plan of apartment building construction project by means of density analysis. To be more specific, site organization charts and staffing plans of apartment building construction projects put together by large construction companies in Korea are studied and essential resources and their mobilization time of apartment building construction projects are examined. Conclusions herein will provide basic inputs to subsequent studies of apartment building construction site management manpower staffing standards.

  • PDF

ESTABLISHMENT OF CONSTRUCTION INDUSTRY CREDIT GUARANTEE SYSTEM-BASED ON TAIWAN'S CONSTRUCTION INDUSTRY

  • Ting-Ya Hsieh;Tsung-Shi Liu
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.399-406
    • /
    • 2011
  • Various construction bonds and warranties critically burden the general contractor. Also, sporadic or cumulative delays of progress payment by the owner can further trap the contractor in a financial quagmire. Facing the possibility of cash flow deficiency and callous response from the banks, most construction firms may become financially incapable of market competition, and attractive project tenders become a bidding game among few deep-pocket players. The downside of such market environment is that the depth of pocket, rather than that of professional competency dictates the choice of market winners. In Taiwan, this has been a potential crisis to the construction industry after the financial crisis which started out since 2008. To encounter this problem, this research will examine the means to better manage the construction industry. Essentially, a credit guarantee system (CGS) is the prime solution to strengthen a bank's confidence in any particular construction firm. Thus establishing a national platform which evaluates and rewards a construction firm's overall credibility is pivotal, and this third-party rated credit can help a bank to render a loan more wisely. Finally, this paper will propose the ideal operating schemes of construction-specific CGS in Taiwan and a credit scoring prototype model for construction industry, as reference for the government and banks, respectively.

  • PDF

The State of the Art and Architectural Environmental Property Evaluation of Earth Construction Material (주요 흙 건축재료 현황 및 건축환경 관련 물성 평가에 관한 연구)

  • Song, Seol-Young;Koo, Bo-Kyoung;Song, Seung-Yeong
    • Journal of the Korean Solar Energy Society
    • /
    • v.26 no.4
    • /
    • pp.83-91
    • /
    • 2006
  • As a demand for sustainable development rises, the preference for earth house (earth construction) increases gradually. However, there are few data for predicting and evaluating the thermal environment and indoor air quality of earth house. Thus, this study aims to measure thermal properties(thermal conductivity, density and specific heat) and pollutants emission intensities(formaldehyde and volatile organic compounds) of current main earth construction materials and make a comparison between earth and cement construction materials. As results, quantitative thermal properties and pollutants emission intensities of current main earth construction materials are shown.