• Title/Summary/Keyword: construction time and costs

Search Result 383, Processing Time 0.027 seconds

A Case Study on the Construction of the Sampling Frame and Sampling Design for 2008 Seoul Survey (2008 서울서베이 표본추출틀 구축 및 표본추출 사례 연구)

  • Kang, Hyun-Cheol;Park, Seung-Yeol;Kim, Jee-Youn;Kim, In-Soo;Lee, Dong-Su;Hwang, Ja-Eil;Park, Min-Gue
    • Survey Research
    • /
    • v.10 no.3
    • /
    • pp.157-172
    • /
    • 2009
  • For a survey research in which the characteristics of the population of interest are investigated from a sample, representativeness of the sampling frame is one of the most important part to be considered. If the sampling frame fails to represent the population properly, statistical procedures based on the even efficient sampling design result in significant nonsampling biases and thus the statistical validities of the results could be damaged. But the construction of the reliable sampling frame that covers the population properly costs money and time and thus the sampling frame based on a census or a large scale survey is often used in practice. For example, the sampling frame based on the population households census is used for many household surveys in Korea. But due to the time difference between the census and a survey of interest, the sampling frame constructed from the census is expected to fail to cover the population of interest. Especially, one could expect a large amount of population and household movement in a large city like Seoul. Thus in our research, we considered the construction of new sampling frame and the procedure of sample selection for 2008 Seoul survey. We analyzed the sampling frame based on 2005 population households census and found that it does not represent the population properly. Thus, we proposed a new sampling frame based on resident registration DB for 2008 Seoul survey. We also proposed the sampling weights and estimator of the population mean based on the sample selected from the newly constructed sampling frame.

  • PDF

Brief Observation on Arbitration Agreement and Arbitral Award - Focusing on Construction Disputes - (중재합의와 중재판정에 관한 소고 -건설분쟁을 중심으로-)

  • Cho Dae-Yun
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.273-314
    • /
    • 2004
  • There is a belief in the construction industry that the traditional court system may not be an ideal forum to effectively and efficiently resolve construction disputes due to the protracted proceedings and the three tier appeal system resulting in a long delay in the final and conclusive settlement of the dispute, relatively high costs involved, the lack of requisite knowledge and experience in the relevant industry, etc. Hence, they assert that certain alternative dispute resolution ('ADR') methods, such as mediation, conciliation, arbitration or a new system for dispute settlement in the form of any combination thereof should be developed and employed for construction disputes so as to resolve them more promptly and efficiently to the satisfaction of all the disputants concerned. This paper discusses certain merits of such assertions and the need for additional considerations for effective resolution of the construction disputes in light of the complexity of the case, importance of expert witnesses, parties' relationship and non-level playing field of the construction industry and so on. At the same time, however, given the inherent nature of disputes rendering the parties involved in an adversarial position, it would rather be difficult, if not practically impossible, to satisfy all the parties concerned in the dispute. Accordingly, in this study, it is also purported to address the demerits of such assertions by studying the situation from a more balanced perspective, in particular, in relation to the operation of such ADRs. In fact, most of such ADRs as stipulated by special acts, such as the Construction Industry Basic Act of Korea, in the form of mediation or conciliation, have failed to get support from the industry, and as a result, such ADRs are seldom used in practice. Tn contrast, the court system has been greatly improved by implementing a new concentrated review system and establishing several tribunals designed to specialize in the review and resolution of specific types of disputes, including the construction disputes. These improvements of the court system have been warmly received by the industry. Arbitration is another forum for settlement of construction disputes, which has grown and is expected to grow as the most effective ADR with the support from the construction industry. In this regard, the Korean Commercial Arbitration Board ('KCAB') has established a set of internal rules end procedures in operation to efficiently handle construction disputes. Considering the foregoing, this paper addresses the most important elements of the arbitration, i.e., arbitration agreement and arbitral award, primarily focusing on the domestic arbitrations before the KCAB. However, since this parer is prepared for presentation at the construction disputes seminar for the public audience, it is not intended for academic purposes, nor does it delve into any specific acadcmic issues. Likewise, although this paper addresses certain controversial issues by way of introduction, it mainly purports to facilitate the understanding of the general public, including the prospective arbitrators on the KCAB roster without the relevant legal education and background, concerning the importance of the integrity of the arbitration agreement and the arbitral award. In sum, what is purported in this study is simply to note that there are still many outstanding issues with mediation, conciliation and arbitration, as a matter of system, institutional operation or otherwise, for further study and consideration so as to enhance them as effective means for settlement of construction disputes, in replacement of or in conjunction with the court proceeding. For this purpose, it is essential for all the relevant parties, including lawyers, engineers, owners, contractors and social activists aiming to protect consumers' and subcontractors' interests, to conduct joint efforts to study the complicated nature of construction works and to develop effective means for examination and handling of the disputes of a technical nature, including the accumulation of the relevant industrial data. Based on the foregoing, the parties may be in a better position to select the appropriate dispute resolution mechanism, a court proceeding or in its stead, an effective ADR, considering the relevant factors of the subject construction works or the contract structure, such as the bargaining position of the parties, their financial status, confidentiality requirements, technical or commercial complexity of the case at hand, urgency for settlements, etc.

  • PDF

Solitary Work Detection of Heavy Equipment Using Computer Vision (컴퓨터비전을 활용한 건설현장 중장비의 단독작업 자동 인식 모델 개발)

  • Jeong, Insoo;Kim, Jinwoo;Chi, Seokho;Roh, Myungil;Biggs, Herbert
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.41 no.4
    • /
    • pp.441-447
    • /
    • 2021
  • Construction sites are complex and dangerous because heavy equipment and workers perform various operations simultaneously within limited working areas. Solitary works of heavy equipment in complex job sites can cause fatal accidents, and thus they should interact with spotters and obtain information about surrounding environments during operations. Recently, many computer vision technologies have been developed to automatically monitor construction equipment and detect their interactions with other resources. However, previous methods did not take into account the interactions between equipment and spotters, which is crucial for identifying solitary works of heavy equipment. To address the drawback, this research develops a computer vision-based solitary work detection model that considers interactive operations between heavy equipment and spotters. To validate the proposed model, the research team performed experiments using image data collected from actual construction sites. The results showed that the model was able to detect workers and equipment with 83.4 % accuracy, classify workers and spotters with 84.2 % accuracy, and analyze the equipment-to-spotter interactions with 95.1 % accuracy. The findings of this study can be used to automate manual operation monitoring of heavy equipment and reduce the time and costs required for on-site safety management.

A study of the replacement of desulphurization slag for sand to ready-mixed soil materials (RMSM)

  • Shiha, Yi-Fang;Tseng, Shih-Shong;Wang, Her-Yung;Wei, Chih-Ting
    • Computers and Concrete
    • /
    • v.17 no.3
    • /
    • pp.423-433
    • /
    • 2016
  • After the industrial of steelmaking by-products are processed properly, they can be used in civil engineering, not only as a substitute for natural resources and to reduce costs, but also to provide environmental protection. This study used different amounts (10%, 20%, 30%, 40%,and 50%) of desulphurization slag to replace natural fine aggregates in ready-mixed soil materials, and tested the physical and fresh properties (slump, slump flow, tube flow, initial setting time, and bleeding) and hardened properties (compressive strength, ball drop, ultrasonic pulse velocity) of the materials. The variations between the performances of the materials with different mix proportions were discussed. When desulphurization slag is used in RMSM, the workability can be enhanced obviously significantly. When the replacement of desulphurization slag is 50%, the slump flow is increased by 110mm compared with the control group, and the initial setting time increases as the replacement increases, because of bleeding. When the replacement is 10% and 20%, the compressive strength at various ages is higher than that of the control group. When the replacement is 10%, the compressive strength at 7 days is higher than that of the control group by 60%, and the ultrasonic pulse velocity is proportional to the compressive strength, which increases with age and decrease as the replacement increases. An appropriate replacement can effectively accelerate construction, and allow projects to be finished ahead of schedule; therefore, an appropriate replacement, is applicable for ready-mixed soil materials.

Performance Comparison of Neural Network Models for the Estimation of Instantaneous and Accumulated Powder Exhausts of a Bulk Trailer (벌크 트레일러의 순간 및 누적 분말 배출량 추정을 위한 신경망 모델 성능 비교)

  • Chang June Lee;Jung Keun Lee
    • Journal of Sensor Science and Technology
    • /
    • v.32 no.3
    • /
    • pp.174-179
    • /
    • 2023
  • Bulk trailers, used for the transportation of powdered materials, such as cement and fly ash, are crucial in the construction industry. The speedy exhaustion of powdered materials stored in the tank of bulk trailers is relevant to improving transportation efficiency and reducing transportation costs. The exhaust time can be reduced by developing an automatic control system to replace the manual exhaust operation. The instantaneous or accumulated exhausts of powdered materials must be measured for automatic control of the bulk trailer exhaust system. Accordingly, we previously proposed a recurrent neural network (RNN) model that estimated the instantaneous exhaust based on low-cost pressure sensor signals without an expensive flowmeter for powders. Although our previous study utilized only an RNN model, models such as multilayer perceptron (MLP) and convolutional neural network (CNN) are also widely utilized for time-series estimation. This study compares the performance of three neural network models (MLP, CNN, and RNN) in estimating instantaneous and accumulated exhausts. In terms of the instantaneous exhaust estimation, the difference in the performance of neural network models was insignificant (that is, 8.64, 8.62, and 8.56% for the MLP, CNN, and RNN, respectively, in terms of the normalized root mean squared error). However, in the case of the accumulated exhaust, the performance was excellent in the order of CNN (1.67%), MLP (2.03%), and RNN (2.20%).

A Study of the Effect of the KTX Mulgeum Station Stop on Railroad Users in Yangsan City (KTX 물금역 정차 확정이 양산시 철도 이용자에게 미치는 영향에 관한 연구)

  • Choi, Yang-Won;Jang, Jae-Suck;Suh, Jeong-Yeal
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.42 no.4
    • /
    • pp.527-536
    • /
    • 2022
  • The purpose of this study is to predict changing traffic environments and related economic effects by reflecting the changed KTDB and socio-economic indicators pertaining to Mulgeum station, a general railway stop, when it is confirmed as a KTX stop. To analyze the data of this study, socioeconomic indicators and the general status of transportation facility operations were investigated with reference to related statistical data, centered on the country overall and on Yangsan city in particular. In addition, we investigated and referenced the railroad facility construction plan and train operation plan, which are national high-level plans related to land development and transportation network construction. Currently, there are only ITX trains (4 times/day) and Mugunghwa trains (29 times/day) that stop at Mulgeum station in Yangsan, meaning that passengers cannot use KTX trains in the Yangsan area. In particular, the need for a KTX stop at Mulgeum station has been continuously raised because train users in the Yangsan area have inconvenient transportation in that they must travel 40 minutes to Ulsan station or 30 minutes to Gupo station to use the KTX. As a result of analyzing railroad transportation demand that will change in the future as the KTX stop at Mulgeum station is confirmed, the number of passengers boarding and arriving at Mulgeum station is predicted to be 1,674 passengers/day by 2025. In addition, the numbers of train passengers that are converted from Ulsan and Gupo stations due to the stop at Mulgeum station are predicted to be 594 passengers/day boarding and 562 passengers/day arriving by 2025. In the future, if Yangsan citizens use the KTX Mulgeum station, the access time to Mulgeum station can be shortened to 22 minutes from 65 minutes, and it is predicted that the inconvenience of transferring between railroads will be resolved, with the waiting time for transfers reduced by up to a maximum of 40 minutes. Therefore, the economic effect of creating a KTX stop at Mulgeum station was analyzed to be B/C=1.823 when general railroad operating costs are not taken into account and B/C=2.127 when general railroad operating costs are considered. In conclusion, when using KTX trains to visit the Seoul Metropolitan Area, it takes 2 hours and 43 minutes to use Mulgeum station without using Ulsan station or Gupo station, which is considered to be very effective for reducing travel times and improving the economic feasibility of this development; it is also expected that Yangsan city will be able to improve accessibility and mobility to the Seoul Metropolitan Area by breaking free from the disgrace of being a remote location given its link to KTX in the future.

A study on the construction of a financial feasibility evaluation model for private investment projects in the port sector using system dynamics (시스템다이내믹스를 활용한 항만분야 민간투자사업 재무적타당성 평가 모형 구축 연구)

  • Cheon, Minsoo;Jeon, Junwoo
    • Journal of Korea Port Economic Association
    • /
    • v.37 no.2
    • /
    • pp.1-17
    • /
    • 2021
  • Private investment projects have the characteristic of generating profits for a long period of 30 to 40 years, and fluctuations in profits and costs occur over time, so the interaction of variables over time rather than statistical models or discounted cash flows If the system dynamics technique, which enables simulation of the system, is used, it is considered that meaningful simulation results can be derived for internal and external variables. In other words, by establishing a financial feasibility comparison/verification model based on system dynamics for private investment projects in the port sector that have not been attempted before, we compare the differences with the existing cash flow discount method, macroeconomic factors, operating period, social discount rate We will conduct a differentiated study that has not been tried before by simulating how the interrelationships of such variables affect the change in financial performance.

Analysis of the operation status and opinion on the improvement of fishing vessel structure in coastal improved stow net fishery by the questionnaire survey (설문조사를 통한 연안개량안강망어업의 조업 실태 및 어선 구조 개선에 관한 의견 분석)

  • CHANG, Ho-Young;KIM, Min-Son;HWANG, Bo-Kyu;OH, Jong Chul
    • Journal of the Korean Society of Fisheries and Ocean Technology
    • /
    • v.57 no.4
    • /
    • pp.316-333
    • /
    • 2021
  • In order to understand basic data for improving the fishing system and fishing vessel structure in coastal improved stow net fishery, a questionnaire survey and on-site hearing were conducted from May 10 to June 11, 2019 to analyze opinions on the improvement of operation status and fishing vessel structure. The questionnaire survey consisted of ten questions on the operation status of coastal improved stow net fishery and six questions on the improvement of fishing vessel structure, and the results of each question were analyzed by the region, the captain's age, the captain's career and the age of fishing vessel. As a result of analyzing opinions on the operation status of the coastal improved stow net fishery, it was found that the average time required for casting net was 32.8 to 33.0 minutes and that the average time required for hauling net was 41.0 to 42.2 minutes which took 10 to 12 minutes more than for casting net. The most important work requiring improvement during fishing operation (the first priority) were 'hauling net operation,' 'readjustment and storage of fishing gear,' and 'fish handling' and the hardest factor in fishing management were in the order of 'reduction of catch,' 'labor shortage' and 'rising labor costs.' The most institutional improvement that is most needed in coastal improved stow net fishery was an 'using fine mesh nets.' Most of the respondent to the questions on the experience in hiring foreign crews was 'either hiring or willing to hire foreign crews,' and the average number of foreign crews employed was found to be 2.3 to 2.4 persons. The most important reason for hiring (or considering employment) foreign crews was 'high labor costs.' The degree of communication with foreign crews during fishing operation were 'moderate' or 'difficult to direct work.' The most important problem in hiring foreign crews (the first priority) was an 'illegal departure.' As the survey results on the opinion of structural improvement of coastal improved stow net fishing vessel, the degree of satisfaction with fishing vessel structure related to fishing operation was found to be somewhat unsatisfactory, with an average of 3.3 points on a five-point scale. The inconvenient structure of fishing vessel in possession (the first priority), the space needed most for the construction of new fishing vessel (the first priority) and the space considered important for the construction of new fishing vessel (the first prioprity) was a 'fish warehouse.' The most preferred equipment for the construction of new fishing vessel were 'engine operation monitoring' and 'navigation safety devices.' The average size (tonnage class), the average horse power and the average total length of fishing vessel for proper profit and safety fishing operation was between 13.8 and 14.0 tonnes, 808.3 to 819.5 H.P. and 23.4 to 23.5 meters, respectively. The results of the operation status of coastal improved stow net fishery and the requirement for improving the fishing vessel structure are expected to be provided as basic data for reference when we build or improve the fishing vessel.

A Study on Development and Site selection of an AIRFIELD (경비행장 개발 및 입지선정에 관한 연구)

  • Park, Sang-Yong
    • The Korean Journal of Air & Space Law and Policy
    • /
    • v.30 no.2
    • /
    • pp.3-36
    • /
    • 2015
  • As of end of 2014, the population engaging in aviation activities for leisure has reached approximately 13 million, where approximately 356 cases involve a general aircraft, 200 cases involve light aircraft, and 636 cases involve an ULM. The industry for leisure has become a very promising industry in line with rapidly rising living standards which are expected to further increase in the future. The demand for such services is expected to increase over time. The purpose of this paper is to review the development and site selection of airfields in anticipation of these developments in the industry. While the government also has experience in the review of airfield location and candidate sites, it is not the government that carries out the actual construction. As such, the feasibility of the site needs to be verified in terms of actual construction. This study identified factors for Site Selection of factors through a review of related documents and existing research reports. A questionnaire was also used to collect the views of experts in the field, which was then analyzed. The Research model was confirmed in the layered form for an AHP analysis. The factors for Site Selection were identified as the technical / operational factors and economic / political elements for a two-stage configuration. The third step consisted of technical and operational elements. The final step is was constructed a total of 11 elements (weather, surface conditions, obstacle limitation surface, airspace conditions, operating procedures, noise problems, environmental issues, availability of facilities, construction and investment costs, contribution to the local economy, accessibility, demand / the proximity of demand). The surveys are conducted for more than 10 General and light aircraft pilots, professionals, and instructor. The analysis results showed a higher level in the technical / operating elements (73.2%) in the first step, while the next step sawa higher level of the operational elements (30.9%) than the other. The factors for Site Selection were any particular elements did not appear high, the weather conditions (17.5%), noise problems (19.8%), the proximity of demand (6%), accessibility (5.7%), environmental issues (11.1%), availability of facilities (8%), airspace conditions (7.9%), obstacle limitation surface (12%), construction and investment costs (4.2%) and to operating procedures (4.9%), contribution to the local economy (3.8%).

A Study on Analysis of Facility Design in Recreation Forest - With a Special Reference to Chonbuk Province - (자연휴양림(自然休養林)의 시설설계(施設設計)의 분석(分析) - 전북지역(全北地域)을 중심(中心)으로 -)

  • Lee, Chang-Heon;Park, Chong-Min
    • Journal of Korean Society of Forest Science
    • /
    • v.85 no.2
    • /
    • pp.158-171
    • /
    • 1996
  • In Korea, 80,616 ha in 139 places have been designated as recreation forests by the end of 1994. Among these places, 64,547 ha in 76 places were designated in the national forest, 9,937 ha in 25 places were designated in the public forest, and 6,132 ha in 38 places were designated in private forest. Designs of 10 places and plans of 6 places in 14 places of recreation forest in Chonbuk province were compared and analyzed. The results are as follows: 1. Sixty four types of convenient facilities, 15 types of athletic facilities, 13 types of sanitation facilities, 22 types of education facilities were designed in 10 places of the recreation forest. 2. The material cost was the highest in construction costs in Waryong recreation forest. However, the labor cost was the highest one in construction costs in 5 places of recreation forest ; Dokyu-san, Hoimoon-san, Saesim, Seongsu, and Sokgeum-san And the total construction cost was much higher in private recreation forest than in both of national and public recreation forest. 3. Hoimoon-san was the only recreation forest which makes profit among 14 recreation forests in Chonbuk province. The uses of this recreation forest are increasing, and seasonal uses significantly fluctuate. 4. There are several problems for the public in enjoying these recreation forest places. The access to these places by public transportations is inconvenient. The time required for construction of many places are too long after they are designated as recreation forest, and the management of the established recreation forest is poor. 5. To improve the method of facility design in recreation forest, easy access to nature should be promoted such as recreation forest places and understanding of public concerning nature are needed. Recreation forest places themselves need to offer good facilities, and convenient access. And to make frequent use of recreation forest places, a system of information and excellent service to the public are strongly recommended.

  • PDF