• Title/Summary/Keyword: construction supervision system

Search Result 126, Processing Time 0.022 seconds

The Effect of the Performance of Firefighting Construction Supervision Personnel on the Completion Inspection of Firefighting Facility Construction in Apartments (소방공사감리원의 업무수행능력이 아파트 소방시설공사의 완공검사에 미치는 영향)

  • Kim, Sang-Sig;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.5 no.3
    • /
    • pp.43-54
    • /
    • 2019
  • In this study, results of completion inspection are investigated according to the performance of the firefighting construction supervision personnel and according to the necessity of clean air supply in a performance test of the firefighting construction supervision personnel. The results of the completion inspection are measured and the causes of defects in the fire protection facilities after issuance of a completion inspection certificate are analyzed. The findings of this investigation can be used to minimize the risk of apartment fires and improve the performance of firefighting construction supervision personnel. The results of this study are summarized as follows. First, the results of the completion inspection conducted by the firefighting construction supervision personnel varies according to particular occupation. The performance of fire facility supervisors from design companies and fire construction companies were significantly higher than the fire officers. Therefore, it is necessary to employ supervisors who have experience in supervising the construction of apartments, in order to improve the performance of fire construction supervision officers. Second, the analysis of the completion inspection results according to the necessity of a clean air supply for performance tests of firefighting construction supervision personnel showed that the necessity of a clean air supply was significantly higher for fire facility supervisors from design companies and fire construction companies than for the fire officers. In order to improve, the completion inspection should be carried out up until the completion date of the building. In addition, a system needs to be established to ensure that clients are not able to demand that a completion inspection certificate be issued on the construction completion date. Finally, it is found that defects of completion inspection after issuance of a completion inspection certificate affects the result of the completion inspection. The results of the completion inspections conducted by the fire facility supervisors from design companies and fire construction companies were affected significantly less by defects than that of the general contractors. Research shows that faults have occured in firefighting facilities after the issuance of a completion inspection certificate due to the client and the construction company demanding the issuance of the completion inspection certificate.

Domestic current situation and Improvement plan Consideration of Electricity Design&Supervision System (전기설계.감리제도의 국내.외 현황 및 개선방안 고찰)

  • Nam, Gi-Beom;Lee, Jong-Hyeok;Jeon, Yeong-SU;Yang, Sun-Sik
    • Proceedings of the KIEE Conference
    • /
    • 2005.11c
    • /
    • pp.14-18
    • /
    • 2005
  • The Reason of collapse accidents, Seongsu bridge Accident in 1994 and Sampung department store Accident in 1995 and so on, that is found out to the shortage construction. Consequently, depending on orderer's self-regulating judgement the meanwhile, Electricity Technique Administration Law in 1995 owes at the public opinion to need the plan of a law system device about the electricity design and supervision and is born. This various issue problem, the combined ordering with Constructing, Electricity, fire-fighting, Information & Communication and so on, field problem, low cost services, the problem about the selection procedure of the design and supervision businessman, the business range between general and specialized, which the system appears as are carried out have been risen. Therefore basic solution plan about this have been desired. We consider a domestic current situation about an electricity design supervision system in this paper, and try to present the plan for healthy upbringing development of the electricity industry through this.

  • PDF

An Analysis of Perceptions of Road Construction Engineers on ICEC Framework at the time of System Transition from Responsibility Supervision to Construction Management (III) - Main Focus of Application for CM & ICEC - (책임감리가 건설사업관리(CM)로 전환시 도입된 역량지수(ICEC)에 대한 도로건설기술자들의 인식 분석(III) - CM과 역량지수 적용을 중심으로 -)

  • Park, Hyo-Sung;Kim, Nak-Seok
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.36 no.2
    • /
    • pp.269-276
    • /
    • 2016
  • Recently the organizations related construction express frequently their opinion to MOLIT at the time of introducing the ICEC grade system and converting a system from responsibility supervision (RS) to construction management (CM). However there was no data to investigate the recognition of road construction engineers about the policy change. In this study, a questionnaire survey was conducted and analyzed twice to the road construction engineers on the CM and ICEC grading system at the Korea Institute of Construction Technology Education. The trend of response from the road construction engineers was verified through the survey separately from other institutions. This study analyzed the results and introduced a desirable policy proposal to promote an international competitiveness of the engineering industry.

A Study on the Application Method of Construction Site Direct Construction System - Centered on domestic construction case - (건설현장 직접시공제도의 활용방안에 대한 연구 - 국내 건설 사례 중심으로 -)

  • Baek, Jae-Chul;Ock, Jong-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.11
    • /
    • pp.171-180
    • /
    • 2019
  • This research proposed the Direct Construction System for construction corporations as a strategy intended to perform cause analysis of construction technician shortage matter and solve resulting problems, and in view of the outcomes from the application of this system to the projects and workshops, it was verified that unsteady employment, lack of career prospect, and conditions of work environment can be resolved. In addition, from corporations' perspective, it is considered that by clarifying the abovementioned three problems, fundamental complications of construction administration, quality control, safety supervision, and cost management were settled, concluding forthcoming advancement of domestic construction business quality fell far behind developed counties.

Design of a Low-Cost Micro Robotic System for Developing and Validation Control Algorithms

  • Isarakorn, Don;Suksrimuang, Chatchai;Benjanarasuth, Taworn;Ngamwiwit, Jongkol;Komine, Noriyuki
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2004.08a
    • /
    • pp.1945-1948
    • /
    • 2004
  • This paper describes the design and construction of a micro robotic system addressing such important aspects as versatility and low cost for rapid development and test of new control algorithm. The design and structure of micro robots are presented in detail. The supervision oriented concept is designed for controlling a group of micro robots. In this concept, the vision system recognizes the environment and the host computer decides the micro robot action based on the information from the vision system. In addition, the micro robots can be implemented cheaply and small in size because the structure of supervision oriented system is simplest. The experimental results and the performance of the proposed micro robotic system are discussed.

  • PDF

The Voluntary Assurance of Quality by Contractors in the Construction Phase (건설 공사단계에서 수급자 중심의 품질확보방안)

  • Cha, Sang-Ho;Lee, Sang-Beom
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.3
    • /
    • pp.292-300
    • /
    • 2011
  • The construction industry in Korea has seen significant improvements in quality management techniques, driven by the dramatic development of new technology through Manhattanization and enlargements, but compared with technical development, the level of building quality improvement is still lagging behind. In the meantime, as the interest in construction quality soars due to changes in user consciousness, the level of quality that is being demanded is rising. The government has reinforced quality systems by implementing responsible supervision requirements and granting overseas companies permission to enter the supervision business in Korea, and private sector companies also are attempting quality improvement through quality assurance approaches like the preliminary qualification screening system and ISO 9000 series. But currently, building constructions are done only according to the construction specifications of project owners, whose design, materials and construction methods are already decided, and do not leave any necessity or opportunity for technical developments for the quality improvement of contractors. Therefore, in this study, a work process and system improvement plan for payment regulations is proposed, with which contractors can secure quality voluntarily in the building construction phase.

A Development on Deep Learning-based Detecting Technology of Rebar Placement for Improving Building Supervision Efficiency (감리업무 효율성 향상을 위한 딥러닝 기반 철근배근 디텍팅 기술 개발)

  • Park, Jin-Hui;Kim, Tae-Hoon;Choo, Seung-Yeon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.36 no.5
    • /
    • pp.93-103
    • /
    • 2020
  • The purpose of this study is to suggest a supervisory way to improve the efficiency of Building Supervision using Deep Learning, especially object detecting technology. Since the establishment of the Building Supervision system in Korea, it has been changed and improved many times systematically, but it is hard to find any improvement in terms of implementing methods. Therefore, the Supervision is until now the area where a lot of money, time and manpower are needed. This might give a room for superficial, formal and documentary supervision that could lead to faulty construction. This study suggests a way of Building Supervision which is more automatic and effective so that it can lead to save the time, effort and money. And the way is to detect the hoop-bars of a column and count the number of it automatically. For this study, we made a hoop-bar detecting network by transfor learnning of YOLOv2 network through MATLAB. Among many training experiments, relatively most accurate network was selected, and this network was able to detect rebar placement in building site pictures with the accuracy of 92.85% for similar images to those used in trainings, and 90% or more for new images at specific distance. It was also able to count the number of hoop-bars. The result showed the possibility of automatic Building Supervision and its efficiency improvement.

A Study on the Improvement of the Legal System for Digital Transformation of the Construction Inspection Works (건축공사 감리업무의 체계성 강화를 위한 법제도 개선안 연구)

  • Kim, Su-Na;Kim, Young-Jin;Lee, Woong-Jong;Roh, Young-Sook
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.375-376
    • /
    • 2023
  • In this study, the legal and institutional status of construction supervising and construction inspector was identified. As a result of examining the definitions of construction supervision terms, focusing on domestic construction-related laws, it was found that there were no consistency between each laws regarding 'terminology' and 'definitions'. In addition, the scope of construction inspector's work continues to expand through the delegation provisions to lower statutes, however, responsibility, authority, and inspection cost are not taken into account properly. In addition in order to introduce digital technology to the smart construction site, which is currently active under way, it is judged that the law and institutional contents need to be improved further.

  • PDF

A Study on Effectiveness of Technical Consulting System for Accident Prevention in Construction Work (건설업 재해예방 전문지도제도의 실효성 연구)

  • Park Hai-Chun;Park Jun-Ho;Kim Hyun-Woo;Park Jung-Sik;Kim Hun-Soo
    • Journal of the Korea Safety Management & Science
    • /
    • v.8 no.1
    • /
    • pp.65-84
    • /
    • 2006
  • This study was to suggest the necessity of depth research in order to enhance the effectiveness of technical consulting system. And the purpose of this study was to decrease the construction accidents to some extent, being on the increase day by day as it takes issue properly and suggest a reform measure. As for research method, it executed the collection of public opinions widely and questionnaire with the bibliography, expert of construction safety, the related institutions, academic world, safety association, and director of construction site. Also, it was to suggest the reform measure by the stage, classifying the problems on the system and operation by 4 stages like a stage of delivery of subscription and supervision, a stage of contract with guidance of technology, a stage of executing the guidance work of technology, and a stage of performance of advice.

A Study of Improving Project Management and Supervision Cost Estimation of Intelligent Transport Systems (ITS 사업관리 및 감리 대가기준 개선방안에 대한 연구)

  • Byun, Sang-Cheal;Lim, Sung-Han;Heo, Tae-Young
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.16 no.5
    • /
    • pp.197-205
    • /
    • 2011
  • Since Intelligent Transport Systems(ITS) is a complex project combining technology and system of transportation, information and communication and civil engineer, it needs a specialized management activities. However, it is difficult to judge who has responsibility for a shoddy and fault construction since the role between project management and supervision is very ambiguous. The aim of this study is propose an efficient project management and supervision for ITS reflecting the characteristics of ITS. Therefore, we suggest a statistical models using nonlinear regression model to prepare the project management and supervision compensation criteria, hence, we choose the realistic and validation statistical model.