• Title/Summary/Keyword: construction quality

Search Result 4,685, Processing Time 0.03 seconds

The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work (건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案))

  • Choi, Byung-Ju;Cui, Xian;Choi, Suk-Woo;Kim, Ok-Kyue
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

A Method for the Quality Improvement by the Punch List Analysis of Apartment Construction (아파트 공사의 펀치리스트 분석에 의한 품질개선방법)

  • Lee, Jae-Yong;Ji, Dae-Jun;Lee, Soo-Yong
    • Journal of the Korean Society of Safety
    • /
    • v.22 no.2 s.80
    • /
    • pp.53-58
    • /
    • 2007
  • This study is to find out primary factors through the punch list in the large scale apartment housing complex, to prevent repeatedly occurring defects of construction and to gain quality management. The following are the findings of the research. (1) The positive strengthening of supervision for the workers can contribute to prevent defects of apartment construction and make better quality of the construction. (2) A solution should be made for the poor of surface join and the damage of work element showing a lot in the apart construction, which prevent defects and improve construction quality. (3) Indirect factors such as negligence and carelessness of the management should be improved to advance construction quality, and the caution and control strengthening of the management should be followed. It is revealed that hitch, omission, and heedlessness come from the defects, and the shortage of skill and checking appear as indirect factors. Therefore, to get quality improvement, the enhancement of the management factors, employment of excellent workers, and enhancement of working attitude and construction management are needed.

A Study on Productivity Analysis of Quality Management System in Construction Site (건설현장 품질관리 자동화 시스템의 생산성 분석에 관한 연구)

  • Choi, Yeongjun;Oh, Hyunchul;Baek, Kihyun;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.3
    • /
    • pp.17-26
    • /
    • 2024
  • Quality management work at construction sites demands substantial time and effort, involving the preparation of documents in Excel, approval processes, and the execution of quality tests. These Excel-based tasks include printing quality test reports, performing quality tests, generating and approving test reports, and preparing management ledgers. This division of processes extends the duration of work and diminishes efficiency. Accordingly, a cloud-based construction site quality management system was developed to enhance the productivity of quality management work. The purpose of this study is to analyze the productivity of the construction site quality management system, which is in the early stages of implementation at construction sites. This study implemented the construction site quality management system at a road construction site and scrutinized subsequent alterations in the quality management workflow before and after the implementation. Additionally, a survey was conducted among quality control engineers to collect data on work time both before and after the introduction of the construction site quality management system. Based on the collected data, the Monte-Carlo simulation method was applied to analyze the productivity improvement effect of the construction site quality management system, and the results were presented. The results of this study can serve as foundational data for future research endeavors focused on the automation of quality management works.

Satisfaction Level of Construction Quality Management by Survey of The Field Staffs (현장 실무자 대상 조사에 의한 건설공사 품질관리 관련 만족도에 관한 고찰)

  • Park, Hyeong-Geun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.2
    • /
    • pp.34-45
    • /
    • 2009
  • In domestic, the Quality Management system of construction work has been compounded of the association of regulation which is ground for relevant law and operation of Quality Management system by ISO/KS A 9001(QMS) established by the contractor. Two quality guaranteed systems must be operated with complementary and integrated system, but we can not make full use of QMS of contractor and only run routinized quality management system in all construction project by the standard, methods, process provided in the law. These problems were demanded better condition in the past ten years, since the ISO standards have been introduced. Establishing preventive consideration of quality management by setting a goal of drastic quality guarantee is an urgent problem of construction industry. This study is quick to fellow, which should do three things. 1. The attitude survey related quality management of staff in charge in construction site has run. 2. Base on these results, we adjust satisfaction measurement about operation of construction quality management system. 3. Subsequently, we want to offer our thesis about advanced opinion for the next.

Deployment of Appropriate Architectural Construction Engineers to Solve Quality and Safety Problems at Construction Sites (건설현장의 품질·안전문제 해결을 위한 적정 건축시공기술자의 배치 관련 연구)

  • Kim, Hyunjun;Kim, Jin-Dong;Shin, Yoonseok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.15-23
    • /
    • 2024
  • Recently, quality problems, such as the collapse of apartment structures under construction, has emerged as a social issue. Although there are various causes of quality problem and the impact of each problem may be different, the problems from the perspective of construction engineer of construction company are investigated. Therefore, this study aim to investigate the adequacy of construction engineer's experience, number of field engineer, timing of engineer deployment at construction sites, etc. in order to resolve quality and safety problems. In this study, a questionnaire survey was conducted targeting construction managers to obtain objective opinions. The results showed that the number of construction engineers in construction companies should be increased and that intermediate construction engineers should be increased to enable practical site management for resolving quality and safety problems. In addition, it was found that there was a need to reduce the number of non-regular employed field construction engineers in construction site and at the same time systematically regulate the number of on-site construction engineers, similar to safety managers and quality managers.

Analysis of Quality Improvement Priority for Construction PMIS

  • An, Hyo-Kyung;Lee, Seul-Ki;Lee, Hyoung-Lak;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.1
    • /
    • pp.10-21
    • /
    • 2012
  • As one of the key IT applications, the project management information system (PMIS) played a significant role in construction management processes in Korea. On increasing use of PMIS, regular quality assessment to identify user's requirements of PMIS is necessary. However, there have been rare research efforts for quality assessment for the construction PMIS. This paper aims to propose a priority index of quality improvement for construction PMIS using the importance and satisfaction measures and to verify the discrimination power of the priority index by comparing it with other quality improvement priority index. In addition, this paper discusses some possible ways of PMIS quality improvement. The analysis of quality improvement priority was based on a questionnaire responded by 253 PMIS users (construction managers and constructors). The methods of PMIS improvement were based on the interviews with eight experts. These findings would be the foundation of further researches on PMIS quality improvement. However, more efforts are required to enhance the priority index, in terms of reflecting weighted values of quality assessment factors.

Development of Quality Management in Small and Medium Construction Company (중 · 소규모 건설회사의 품질관리 방법 개선)

  • Lee, Geu-Sun;Yun, Yer-Wan;Yang, Keek-young
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.3 s.17
    • /
    • pp.117-124
    • /
    • 2005
  • Quality management in construction industry becomes more significant under the existing conditions such as, increasing higher demand caused by the high value of real estate and extension of the warranty period. Therefore, this study presents the alternative idea related to the current quality management conditions of small and medium construction companies, including the difficulties and problems in qualify management, in order to develop the systematical method for the quality management in small and medium construction company.

A Case Study of Quality Management System Program in General Contractor (종합건설회사의 품질경영시스템 적용사례연구;H건설 사례 중심으로)

  • Yang, Ki-Hwan
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.588-592
    • /
    • 2006
  • Information trend in whole domestic industries can not be a exception for construction industry either. However, Construction companies applying quality information management system(QIMS) through practical use of internet is very limited. Consequently, this research finds the established sample of quality information management system(QIMS) of H-construction company out, and the quality is established to the practical use of the system to be like the this. therefore, the construction industry wished to become opportunity that construction industry competitive power is recognized cosmopolitanly to quality management system(QMS).

  • PDF

BIM for Construction Quality Record

  • Son, Sang-Hyuk;Lee, Dong-Eun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.252-254
    • /
    • 2015
  • Building Information Modeling (BIM) encourages effective information share and utilization among project participants during entire life cycle of facility. This paper presents a method that keeps track of the historical quality records involved in construction operations and facilitates using BIM. The method is coded into BIM based Quality Record Traceability (BIM-QRT) System that makes use of historical records obtained from database administrating construction operations. This study is of value to practitioners because the method makes clear the project participants' responsibility relative to the quality of each and every element of the facility. The main objective of this research is to develop an accurate, fully automated method for construction Quality Record Tracking by using a BIM along with construction operations data obtained by information technology. Test cases verify the usability and validity of the methods implemented in the system.

  • PDF

Factors Affecting Quality Management Failure in Construction Projects

  • Lee, Seulki;Yu, Joungho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.25 no.4
    • /
    • pp.66-81
    • /
    • 2024
  • Identifying the root causes of substandard construction projects is crucial considering the social and economic issues structural failures can cause. To date, the focus has predominantly been on identifying and penalizing the culprits rather than uncovering the fundamental reasons. Therefore, this study aims to identify various factors that contribute to failures in construction project quality management, including aspects of substandard construction projects, and determine the relationship between these factors and substandard construction projects. Through a literature review and case analysis, 61 influential factors were identified. A survey targeting participants including structural designers, architectural designers, construction companies, CM, and researchers was conducted to gauge the consensus on these factors. A regression analysis was performed based on data from 724 survey respondents. Ultimately, based on the 17 key influencing factors identified by the regression analysis, 9 preventive measures against substandard construction projects were proposed. This study is significant as it elucidates the reasons behind construction project quality management failures that lead to substandard construction projects and establishes a framework for developing practical solutions to real-world problems rather than theoretical or abstract ones.