Acknowledgement
This paper was researched through the 2023 Kwangwoon University Outstanding Researcher Support Project.
References
- Bank of Korea (2022). Evaluation and implications of the recent construction industry situation: Focusing on supply constraint factors BOK Issue Note No. 2022-20.
- Belsley, D.A., Kuh, E., and Welsch, R.E. (1980). Regression Diagnostics: Identifying Influential Data And Source of collinearity, John Wiley and Sons.
- Cohen, J. (1988). Statistical Power Analysis for the Behavioral Sciences(2nd Ed.), Lawrence Erlbaum Associates, Inc.
- Dnews (2020). Only 1 in 10 construction-related majors "hope to work for an engineering company" http://dnews.co.kr/m_home/view.jsp?idxno=202002071020112900664 (Feb. 10, 2020).
- Hamad, A., Han, S.W., and Steve, D. (2015). "Analysis of the Complex Mechanisms of Defect Generation in Construction Projects." Journal of Construction Engineering and Management, ASCE, 142(2), pp. 04015063-1-11,https://doi.org/10.1061/(ASCE)CO.1943-7862.0001042
- Joint of related ministries (2023). Plan to break up the construction cartel to strengthen public safety.
- Koscaj (2021). What happened to the image of the construction industry? 78% of college students majoring in construction say they will change careers, https://www.koscaj.com/news/articleView.html?idxno=219626 (Jun. 24, 2021).
- kostat (2023). Results of the 2022 Construction Industry Survey (corporate performance sector), https://eiec.kdi.re.kr/policy/materialView.do?num=245944, (Dec. 14, 2023).
- kostat (2023). December 2022 and annual employment trends, https://eiec.kdi.re.kr/policy/materialView.do?num=234421 (Jan. 11, 2023).
- ISTANS (2023). https://www.istans.or.kr/mainMenu.do (Dec, 20, 2023).
- MBC News (2013). Overseas construction orders approaching $30 billion, next year's goal to exceed $35 $35 billion https://imnews.imbc.com/news/2023/econo/article/6554126_36140.html
- Mehrabioun, M.M., Jalali, A., and Hasani, A. (2022). "Success and failure factors in implementing quality management systems in small- and medium-sized enterprises: a mixed-method study." International Journal of Quality & Reliability Management, Emerald Insight, 39(2), pp. 468-494. https://doi.org/10.1108/IJQRM-06-2020-0210
- Nunnalyy, J.O. (1978). Psychometric Theory. New York, McGraw-Hill.
- Qi, Y., Queena K.Q., Frits M.M., and Henk J.V. (2021). "Unravelling Causes of Quality Failures in Building Energy Renovation Projects of Northern China: Quality Management Perspective." Journal of Management in Engineering, ASCE, 37(3) pp. 04021017-1-18. https://doi.org/10.1061/(ASCE)ME.1943-5479.000088
- Tuane, T.Y., Camila, F.P., Lillian, do N.G., and Mateus, C.G. (2013). "Why Does the Implementation of Quality Management Practices Fail? A Qualitative Study of Barriers in Brazilian Companies." Procedia - Social and Behavioral Sciences , ELSEVIER, 81, pp. 366-370. https://doi.org/10.1016/j.sbspro.2013.06.444
- Yu, J.H. (2023). Hidden causes of structural collapse accidents; Implications from the Incheon Geomdan Apartment accident, RICON, Construction Policy Journal 51, https://ricon.re.kr/file_download.php?type=journal_total_pdf&no=57