부산지역 멸실 건축물의 내구년한에 관한 실태조사연구 (Investigation on the Service life of Disappeared Buildings in Busan)

  • 이재용;이수용
    • 한국안전학회지
    • /
    • 제18권3호
    • /
    • pp.114-119
    • /
    • 2003
  • The building needs of the community are met by the interrelated construction activities of maintaining, modernizing and replacing the existing stock of building and by the erection of additional new building. Studying the service lift of buildings and how it is determined can serve as an important measuring stick in making decisions on construction policy. Therefore, the purpose of this study is to provide useful information for future construction through a comparative and analytical study of building structures on disappeared buildings. It was found that most building structure had a shorter service life than the standard set by The Korea Appraisal Board. This situation may have occurred due to the sharp rise in replacement of older buildings with new buildings for the purpose of monetary profit. To increase the economic life of buildings reduce losses of the nation's capital henceforth, examination on policy md steady study needs to be done.

유니트 커튼월 멀리온 레일 양중 시스템의 경제성 및 현장 적용 가능성에 관한 연구 (A Study on the Economic and the Field Application Feasibility of Unit Curtain Wall Mullion Rail Lift System)

  • 정의인;김해나;김봉주
    • 한국건축시공학회지
    • /
    • 제21권1호
    • /
    • pp.41-49
    • /
    • 2021
  • 본 연구는 최근 고층 건축물의 외장 마감으로 사용되는 커튼월 중, 유니트 커튼월 방식의 양중 문제 해결을 위하여 커튼월의 수직부재인 멀리온을 레일로 활용하고자 하였다. 커튼월 멀리온의 레일 적용에 따른 양중 가능 여부는 Mock-Up Test의 진행을 통해 20m/sec의 풍속에도 양중이 가능한 것으로 나타났으며, 비교를 위해 선정된 현장 기준으로 공사 기간은 약 20% 단축이 가능하며 투입 인원은 약 33%를 줄일 수 있을 것으로 분석되었으며, 10,000㎡의 설치를 가정하면 80% 이상의 시공비용 절감이 가능한 공법으로 판단된다.

진동법을 이용한 사장교의 시공 중 장력 평가 (Evaluation of Cable Tension Forces Using Vibration Method for a Cable-stayed Bridge under Construction)

  • 조수진;윤정방;심성한
    • 한국안전학회지
    • /
    • 제29권2호
    • /
    • pp.38-44
    • /
    • 2014
  • When a cable-stayed bridge is under construction, the cable tension that changes according to the construction phase is the index indicating the proper construction management. In this study, the vibration method using the least-square estimation has been implemented to monitor changing tensions of two multi-strand cables of a cable-stayed bridge under construction. The test bridge is Hwamyung Bridge in Korea with a prestressed concrete box girder. The field tests are executed during the second tensioning stage just after the installation of the key segment. The tensions of two cables are measured before and after the tensioning and 5 days later (i.e., after finishing the tensioning of all cables). The accuracy of the estimated tensions by the vibration method has been improved by employing proper effective lengths of the cables. The measured tensions are compared with the result of the lift-off tests and design tensions. The vibration method shows very good performance in monitoring the changing tensions according to the construction phase with minimal error.

고층건물공사 마감자재의 수직$\cdot$수평이동계획이 통합된 의사결정모델 (A Decision-Making Model of Integrated Vertical and Horizontal Move Plan for Finishing Material in Righ-Rise Building Construction)

  • 안병주;김재준
    • 한국건설관리학회논문집
    • /
    • 제2권2호
    • /
    • pp.47-58
    • /
    • 2001
  • 고층건물공사 현장물류계획은 수직이동계획과 수평이동계획으로 구분할 수 있다. 수평이동계획의 내용은 상대적으로 선행 프로세스인 수직이동계획 과정에서 결정되는 양중장비계획 등에 의해서 제약을 받는다. 현재 국내 건설업체들은 마감자재에 대한 이동계획과 관련해서 약산식을 사용한 가설 리프트 대수 산정, 마감자재별 물량을 양중회수로 치환하는 방법의 부재, 유사현장 사례 비교 방법의 문제점, 양중장비계획의 적정성 검토 방법의 부재, 형식적인 수평이동계획, 수직$\cdot$수평이동계획의 단절 등의 문제점을 가지고 있다. 그리고 이러한 문제점들로 인하여 수직$\cdot$수평이동계획자는 양중장비의 대수, 사용기간, 마감자재의 야적 등에 대해서 합리 적으로 의사결정을 내리지 못하고 있다. 본 연구에서는 계획자로 하여금 고층건물공사 마감자재의 수직$\cdot$수평이동계획을 통합하여 합리적으로 계획할 수 있는 의사 결정모델을 제안하고 있으며, 이 모델을 현업의 수직$\cdot$수평이동계획 과정과 비교하고 있다. 그리고 이 모델을 사용하는 계획자는 자신의 사고의 틀을 결과지향적 사고에서 과정지향적 사고로 변화시키는데 활용할 수 있고, 계획 시 직면하게 되는 한정된 자원 및 동태적 상황 등에 적절하게 대응할 수 있으며, 고층건물공사 마감자재의 수직$\cdot$수평이동계획에 대한 시스템 사고 등이 가능하다.

  • PDF

해양심층수 취수를 위한 기포펌프의 적용성 연구 (A Study on Applicability of Air-lift Pump for Deep Seawater pumping)

  • 신필권;김현주;홍석원;최학선
    • 한국해양공학회:학술대회논문집
    • /
    • 한국해양공학회 2004년도 학술대회지
    • /
    • pp.13-16
    • /
    • 2004
  • Deep sea water has mid temperature, abundant nutrients and minerals, and good tooter quality. For the purpose of drawing up deep sea water without pump pit construction, tile authors are considering to use air-lift pump. This report describes fundamental experimental investigation for air-lift pump characteristic and improvement in efficiency.

  • PDF

건설 리프트의 적정 대수 산정에 관한 연구 (A Study on the Estimation of Proper Numbers of Construction Lifts)

  • 김선국;한갑규
    • 한국건축시공학회지
    • /
    • 제8권3호
    • /
    • pp.119-125
    • /
    • 2008
  • The volume of material and number of workers mobilized has been on the rise in line with the domestic projects getting higher, larger and complex currently. Particularly for the project in downtown, delivering the resources in timely manner is very crucial in carrying out the overall project as scheduled. Inappropriate lifting plan often causes inefficiency over the entire project, resulting in increase in schedule and cost. Despite of such importance of lifting plan for architectural work, lifting plans at the most of domestic projects, except a few cases for large scale high-rise buildings, have been heavily dependent on engineer's personal experience and intuition alone. To deal with such problems, the study was intended to develop and suggest a systematic and objective process for determining the lift, categorizing the lifting equipment into the two types, one for workers and another for material.

Design Exploration of High-Lift Airfoil Using Kriging Model and Data Mining Technique

  • Kanazaki, Masahiro;Yamamoto, Kazuomi;Tanaka, Kentaro;Jeong, Shin-Kyu
    • International Journal of Aeronautical and Space Sciences
    • /
    • 제8권2호
    • /
    • pp.28-36
    • /
    • 2007
  • A multi-objective design exploration for a three-element airfoil consisted of a slat, a main wing, and a flap was carried out. The lift curve improvement is important to design high-lift system, thus design has to be performed with considered multi-angle. The objective functions considered here are to maximize the lift coefficient at landing and near stall conditions simultaneously. Kriging surrogate model which was constructed based on several sample designs is introduced. The solution space was explored based on the maximization of Expected Improvement (EI) value corresponding to objective functions on the Krigingmodels. The improvement of the model and the exploration of the optimum can be advanced at the same time by maximizing EI value. In this study, a total of 90 sample points are evaluated using the Reynolds averaged Navier-Stokes simulation(RANS) for the construction of the Kriging model. In order to obtain the information of the design space, two data mining techniques are applied to design result. One is functional Analysis of Variance(ANOVA) which can show quantitative information and the other is Self-Organizing Map(SOM) which can show qualitative information.

Effects of a Lift Height on the Thermal Cracking in Wall Structures

  • Kim, Sang-Chel
    • KCI Concrete Journal
    • /
    • 제12권1호
    • /
    • pp.47-56
    • /
    • 2000
  • Once a structure fabricated with mass concrete is in a form of wall such as retaining wall, side walls of a concrete caisson and so on, cracks induced by hydration heat have been known to be governed by exterior restraints which are mainly related to the boundary conditions of the structure. However, it is thought that the degree of restraints can be alleviated considerably only if a lift height of concrete placement or a panel size of the wall is selected properly before construction. As a way of minimizing thermal cracking commonly observed in massive wall-typed structure, this study aimed at evaluating effects of geometrical configuration on the temperature rise and thermal stress through parametric study. Evaluation of the effect was also performed for cement types using anti-sulphate cement, blast furnace slag cement and cement blended with two mineral admixture and one ordinary Portland Cement. so called ternary blended cement. As a result of analytical study, it was found that a lift height of concrete placement is the most important factor in controlling thermal cracking in massive wall, and the increase of a lift height is not always positive to the crack occurrence as not expected.

  • PDF

건설현장의 조건을 고려한 최적 타워크레인 선정시스템 (A System for the Selection of the Optimum Tower Cranes(Opt-TC))

  • 호종관;김선국;국동훈
    • 한국건설관리학회논문집
    • /
    • 제8권6호
    • /
    • pp.216-226
    • /
    • 2007
  • 건설프로젝트의 고층화, 대형화 추세에 따라 효율적인 양중계획의 중요성이 부각되고 있다. 양중작업의 대부분을 차지하고 있는 타워크레인의 경우, 양중부하에 적합한 최적 크레인을 선정하고 안전성을 확보하는 것은 생산성뿐만 아니라 프로젝트의 원가, 공기 등의 측면에서 매우 중요하다. 따라서 철저한 사전계획에 따라 적합한 크레인을 선정한 후 안전하게 지지하는 일련의 작업은 전문적인 지식을 필요로 한다. 그러나 전문가의 수가 제한적이며, 이들 전문가의 경우에도 다양한 크레인의 양중성능, 운전특성, 임대가 등에 대하여 상세히 알기보다는 본인들이 주로 사용한 제한적 수의 크레인에 대한 정보를 가지고 있을 뿐이다. 따라서 본 연구는 고층공사의 양중계획단계에서 현장조건에 따른 최적 타워크레인을 선정하고 그 안정성을 쉽고 빠르게 검토할 수 있는 선정시스템을 구축하였다. 본 선정시스템은 크레인 선정시 다양한 기종 및 성능에 대한 정보제공은 물론, 해당 크레인의 기초판과 횡지지에 대한 안정성을 실시간으로 비주얼하게 검토할 수 있어 크레인 선정에 효과적인 도구로 사용될 것으로 예상한다.