• Title/Summary/Keyword: construction labor productivity

Search Result 177, Processing Time 0.026 seconds

An Economic Analysis of Steel Framed Modular Housing: Compared with Case of Urban Type Living Housing of Wall-slab (강재 프레임 주택형 모듈러의 경제성 분석: 벽식구조인 도시생활형주택과의 사례비교를 통해)

  • Bang, Jong-Dae;Chun, Chu-Young;Park, Ji-Young;Kim, Jong-Yeob;Kim, Gap-Deug;Chun, Young-Soo
    • Land and Housing Review
    • /
    • v.5 no.4
    • /
    • pp.305-314
    • /
    • 2014
  • The technology-intensive unit modular method of factory production method is attracting attention by the limit of the labor-intensive and field centered wet construction method. In recent years, the unit modular method has been applied to the construction of schoolhouse and BOQ(bachelor offices' quarters), dormitories, etc. But the modular method still is not used in housing construction by the lack of verification of resident performance and construction cost. Therefore, this study analyzed the economics of modular house to vitalize the constructed residential building by modular method and to develop the modular method. According to the study results, the construction cost of the modular house was analysed more about 6.2% expensive than that of the existing housing. However, if the construction duration of modular house is shortened or the productivity of modular house is increased, the construction cost of modular house will be similar to the that of the existing house.

Critical Success Factors for Efficient Development of Construction Automation Technology (효율적인 건설자동화 기술 개발을 위한 핵심성공요인)

  • Lee, Ung-Kyun;Kim, Baek-Joong;Kim, Taehoon
    • Journal of the Regional Association of Architectural Institute of Korea
    • /
    • v.21 no.6
    • /
    • pp.1-6
    • /
    • 2019
  • Construction automation can be an effective alternative for the lack of skilled labor and loss of productivity. With such a background, Korean government has provided a lot of financial supports for the development of construction automation technology. However, despite of those efforts, automation systems at construction sites have rarely been employed. This is because the systems have not been developed with full consideration of the needs and environments on construction sites. Thus, the purpose of this study is to identify the critical success factors for efficient development of construction automation systems. This study compares and analyzes key factors for automated construction system(ACS) and construction information system(CIS). As a result, 'stability and reliability' in the ACS showed the highest importance while 'manageability' in the CIS was. Consequently, for the successful introduction of the ACS, technical capability and stability should be firstly considered to cope with dynamic construction environment, while the CIS should be built to enable efficient management and use of information. The result of this study can serve as an evaluation base for the current construction automation technologies and an index for more efficient technology development in the future as well.

Development of Climbing Hydraulic Robot System's Synchronizing Controller for Construction Automation (시공자동화를 위한 크라이밍 유압로봇시스템의 동기제어 컨트롤러 개발)

  • Cho, Nam-Seok;Kim, Chang-Won;Kim, Dong-In;Lee, Kyu-Won;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.167-169
    • /
    • 2011
  • Construction Automation as a way to solve the problems of lack of skilled labor by decrease in construction population productivity and quality decrease. We are on the way to develop a construction automation system adequate for domestic circumstances in Korea; it is called RCA(Robotic-crane based Construction Automation) system. Climbing hydraulic robot system is a part of RCA system and makes Construction Factory(CF) climb next floor. The controller can control movement needs to be developed for CF safety. Synchronous control the actual field was applied to the controller logic and synchronous control of the process through which the safety has been verified. The purpose of this study that control of climbing hydraulic robot system behavior on real-time, and to improve safety for overall construction automation system through synchronous motion controller.

  • PDF

Multi-family Residential Construction Management Practice in the U.S.

  • Cho, Namho
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1254-1254
    • /
    • 2022
  • The Multi-family Residential is one of the most famous building types for a rental property in the US. Often times it includes multiple residential buildings and some amenity facilities, including a clubhouse or leasing office, swimming pool, dog park, and garages. Since the building type is built for rental purposes, the construction planning is phased and it makes the project complicated. Detailed planning and execution are important for successful construction management. This paper provides some management practices that are applied to one of the multi-family residential construction projects in Phoenix, AZ. The Front End Planning (FEP) process performed by both owner and contractor is the first key to a successful construction project. Specifically, the early review of phased turnover strategy, grading, fire/Americans with Disabilities Act (ADA) compliance, and Mechanical/ Electricity/Plumbing/Technology (MEPT) will provide absolute benefit to the project. Second, using a scheduling method to control short-term schedules and long-term can provide the ability to manage the issues with agility. Third, material delivery and procurement dominate the both project schedule and cost. With this COVID-19 circumstance, it is hard to expect the material, equipment, and labor forces to be delivered on time with the contracted price. Managing floats are more than important to managing construction productivity. Risk management should work to share the risks fairly. Lastly, turnover is directly linked with the profit of the project for both owner and contractor. The communication between the owner and contractor to re-schedule the proper turnover schedule is important for the phased construction project.

  • PDF

Application of Sensor Technology for the Efficient Positioningand Assembling of Ship Blocks

  • Lee, Sang-Don;Eun, Seong-Bae;Jung, Jai-Jin;Song, Ha-Cheol
    • International Journal of Naval Architecture and Ocean Engineering
    • /
    • v.2 no.3
    • /
    • pp.171-176
    • /
    • 2010
  • This paper proposes the application of sensor technology to assemble ship blocks efficiently. A sensor-based monitoring system is designed and implemented to improve shipbuilding productivity by reducing the labor cost for the adjustment of adequate positioning between ship blocks during pre-erection or erection stage. For the real-time remote monitoring of relative distances between two ship blocks, sensor nodes are applied to measure the distances between corresponding target points on the blocks. Highly precise positioning data can be transferred to a monitoring server via wireless network, and analyzed to support the decision making which needs to determine the next construction process; further adjustment or seam welding between the ship blocks. The developed system is expected to put to practical use, and increase the productivity during ship blocks assembly.

The Construction of Productivity Improvement Model with Group Technology Style through the Utilization of Learning curve (Learning Curve를 이용한 G.T형 생산성향상 모델 구축)

  • 윤상원;신용백
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.15 no.26
    • /
    • pp.77-84
    • /
    • 1992
  • This paper constructs Croup Technology process-based learning curve model adjusted to a Group Technology environment which accounts for shared learning that occurs when multiple products utilize some of the same process steps. Through this constructed model, the estimated times and productivity of labor calculated by the Group Technology process-based learning curve model are compared with those generated by employing product-based 1 earning curve model. For sensitivity analysis of the model, the impact of learning rate and the ordered production quantity on the ratio differences between Group Technology process-based learning curve model and product-based learning curve model are examined. These results indicate the critical importance of employing Group Technology process-based learning curve model when a process spans multiple products.

  • PDF

Information retrieval system for efficiency of getting information about construction (건설자재 정보 제공의 효율성을 위한 정보검색체계 연구)

  • Oh, Yong-Seok;Song, Jeong-Hwa;Oh, Kun-Soo
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2008.04a
    • /
    • pp.231-234
    • /
    • 2008
  • Each corporation isn't consistent because of offering specific information for publicity. It spends considerable labor force and time surfing of the material information and choosing need material. That's the reason it's different with material information and choice system between production and marketing corporation. Among lots of material information, some of them are used by offering material information simplify. So it is demanded necessity of reasonable material choice system. That system helps it choose a material more easily. So we studied about the information retrieval system of reasonable material choice through the study about assortment system of material information and material choice method. It's the basic study for the suggestion of reasonable material choice system. According to this study, if that system is suggested and realized, we can overcome from the system of typical and repeatable at every course of architecture during several times. It will be helpful to increase about the productivity of architecture as the minimization of time, labor, resource and cost for the material choice.

  • PDF

Development and Application of Unit Table Form using Euro Form for High-rise Building Construction (초고층 건축공사를 위한 유로-유닛 테이블폼 공법 개발 및 적용에 관한 연구)

  • Yang, Sung-Woo;Cho, Hun-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.45-52
    • /
    • 2008
  • In today's construction, there has been an increase in the construction of high-rise buildings due to the need to maximize land usage. Framework affects not only the entire construction duration and cost, but also subsequency construction activities such as electrical, mechanical, and finishing works. Especially, proper formwork is a influential factor of productivity in the framwork of reinforced concrete construction. To that reason, a table form of system form is more frequently used than conventional form. However, an initial cost of the table form is high and a reused table form needs for workers to repair damaged table forms. Therefore, the goal of this study is to introduce euro-unit table form. The results from the application of euro-unit table form to high-rise residentia building construction are as follows : (1) The cost of producing table form reduced by 16%, and (2) The time of producing table form was slumped by 35%, and (3) The labor force needed for form work declined 21%.

SUGGESTING IMPROVEMENT METHODS OF FORM WORK FOR COST REDUCTION IN THE MID-RISE APARTMENT HOUSING

  • Jeongseok Lee;Seunghee Kang;Gunhee Cho;Jeongrak Sohn;Jongdae Bang
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1608-1614
    • /
    • 2009
  • In recent days, the study of urban regeneration has been conducting with purposeful and sincere intent starting out with the residential environment improvement works. Within the range of urban regeneration, the low-cost housing technology means development of totally-integrated housing technology that may be applied to the regeneration project, especially for the rundown areas where infrastructure facilities in the urban zone have been degraded and obsoleted. In line with this, among many and varied methods in order for realization of the low-cost housing as a part of urban regeneration project, this study should like to propose an improvement methods of the key technologies in relation to the construction works by type of work with which construction costs (directing cost) would be reduced. And, in order to elicit the method for element technology that has been developed and improved in the most optimal manner centering on the selected construction work by the type of work, the researcher conducted comparative review of summary of element technologies related to the construction works concerned, characteristics, and construction method thereof. In particular, the researcher investigated the expenses (construction cost and labor cost), constructions (contractibility and productivity), safety, quality of works, and the technical status in environmental aspects, and the researcher also conducted analyses and evaluations thereof.

  • PDF

BIM Based Intelligent Excavation System (BIM 기반 지능형 굴삭시스템)

  • Kim, Jeong-Hwan;Seo, Jong-Won
    • Journal of KIBIM
    • /
    • v.1 no.1
    • /
    • pp.1-5
    • /
    • 2011
  • Earthwork is important in terms of construction time and duration, and highly related to the construction productivity. However, current earthwork system has stick to labor intensive process depending on skilled operator's heuristic decision making, so it is hard to improve overall productivity. To overcome this drawback, this paper presents a BIM based Intelligent Excavation System(IES). The BIM technology is applied in the excavation task planning system, Human-Machine Interface for remote-control/autonomous work environment, and web-based Project Management Information System(PMIS) in the IES integration process, and the results are addressed.