• Title/Summary/Keyword: construction field manager

Search Result 84, Processing Time 0.024 seconds

Work Condition Effects of Construction Field Managers and Safety Managers on Job Satisfaction (건설현장 관리자와 안전관리 담당자의 근로조건이 직무만족에 미치는 영향 분석)

  • Choi, Jae-Kyu;Hong, Jung-Su
    • Journal of the Korea Institute of Building Construction
    • /
    • v.17 no.1
    • /
    • pp.91-100
    • /
    • 2017
  • The safety management is one of important factors. However, the satisfaction of safety manager is lowering. Therefore, this study focuses on comparing the impact that working conditions have on the job satisfaction of field and safety manager in construction field. The results of in this study, the basic wage, medical care, and leisure activity were analyzed as a positive impact on job satisfaction. In addition, the comparison result of the field manager and safety manager showed that safety manager appeared to be a greater impact on the basic wage than the field manager. Also, this study showed that the medical care and leisure activity have a positive impact on the job satisfaction of field manager, but the industrial accident and accommodation facility have a positive impact on the job satisfaction of safety manager.

A Comparative Analysis of Status on the Selection and Evaluation of Field Manager in Apartment and Office Building Project (공동주택과 오피스 건설현장의 조직원선정 및 평가실태 비교분석)

  • Lee Jung-Yong;Kim Byeong-Lae;Son Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.290-293
    • /
    • 2003
  • The field organization management in construction industry is very important factor improvement and cost reduction. But, until now, evaluation methods on the existing field organization did not make ready and endeavor of organization betterment was insufficient in construction industry. The purpose of this study to provide basic data for reasonable selection and evaluation of the field manager through analyzing operation status of the existing field organization in apartment and office building project by interview and questionnaire on the 22 construction companies. This study presented optimal proposal on the selection and evalution of field manager for productivity improvement and cost reduction by means of efficient construction progress in apartment and dffice building project.

  • PDF

An Analysis for Work Performance of Female Field Manager of General Construction Company (일반건설업체 여성 현장관리자의 업무수행능력 분석)

  • Shin, Won-Sang;Lee, Dong-Eun;Son, Chang-Baek
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.194-196
    • /
    • 2013
  • Recently, It is a fact that the percentage of female field managers has increased in the construction industry. Therefore, this study investigated the percentage of female construction site managers by conducting a survey of current male and female construction site managers and then analyzed the workload, work difficulty, work importance and performance level of female employees in charge of public affairs, which is the most common tasks.

  • PDF

Development of job stress measurement system for construction field managers (건설공사 현장소장 직무스트레스 측정 시스템 개발)

  • Lee, Tae -Shin;Yang, Jin-Kook;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.121-122
    • /
    • 2022
  • Recently, the scale of construction project is getting bigger compared to previous projects. Therefore, the job stress of the field manager responsible for the construction project is getting more and more intense. Therefore, construction companies should establish a job stress management plan for stable human resource management of the field managers. From this perspective, in this study was developed a job stress measurement system in connection with MBTI personality types. The developed system allows the job stress of the field manager to be judged on a scale from 1 to 9 points. Accordingly, it is expected that construction companies will contribute to the effective management of field managers in the future.

  • PDF

Individual behavioral competences for construction project risk manager

  • Lee, Kwang-Pyo;Lee, Hyun-Soo;Park, Moonseo;Kwon, Byung-ki;Hyun, Hosang
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.183-187
    • /
    • 2015
  • The Risk Management (RM) is applied for managing uncertainty of project. In this circumstance, the competences of RM have a direct effect on the performance of its application. Especially, as the RM, one of the project management areas, is a peopleoriented management field, the individual behavioral competences are significant for a risk manager. Therefore, this paper describes the development of individual behavioral competences for construction project risk manager. For this, the research classifies the individual behavioral competences of RM. And, the Exploratory Factor Analysis (EFA) are applied to verify a validity of the competences. Likewise, a reliability analysis using Cronbach's alpha values is performed to test internal consistency. Based on the results, the authors carry out the Focus Group Interview (FGI) on expert panels of construction RM to confirm the hierarchical model of the individual behavioral competences. It is concluded that the proposed hierarchical model of individual behavioral competences helps construction companies to diagnose the competences of their project risk manager for progressing.

  • PDF

CSFs Extraction and AHP Importance Analysis for Construction Technology Services Evaluation in terms of Construction Manager (건설사업관리자(CMr) 측면에서 건설기술용역 평가의 CSFs 추출 및 AHP 중요도 분석)

  • Yang, Jin-Kook;Hong, Seong-Wook
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.36 no.3
    • /
    • pp.129-134
    • /
    • 2020
  • The current evaluation time period for the construction management service is the project completion or after project completion. Therefore, the construction manager has the following problems. First, it is difficult to prepare the evaluation due to the new field movement of the existing participating engineer. Next, the CM work is complex as well as extensive. Therefore, the critical success factors of the construction technology services evaluation are required as a systematic performance standard of CM work. In this study, we extracted the critical success factors that can systematically prepare the evaluation from the early stage of the project through in - depth interviews with experts. And, this study was analyze the priority of each factor by using AHP technique. As a result, the most important factors were related to the systemization of the preparation process, the construction manager work capabilities and practical construction management. And the priorities of all factors were analyzed high in the factors suggested by the owner groups. The results of this analysis are expected to provide the standards that construction management service performer carry out structured management of construction management throughout the project.

Development of a Flash-based Schedule Management Tool for Smart Devices

  • Jang, Myunghoun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.12 no.6
    • /
    • pp.558-565
    • /
    • 2012
  • Schedule management of construction work is critical to completing construction projects within a given period of time. Many efforts have been made and multiple tools have been developed to support the management of construction projects using smart devices such as smartphones and tablet PCs. This study proposed a method for managing construction schedules via a smart device using Flash. The interactive and graphic properties of Flash enable the development of an app that can allow a field manager to manage schedules easily and efficiently. A prototype was implemented using Adobe Flex Builder, and a sample network was applied in a smartphone. It is convenient for a construction manager to manage construction schedules using the tool because Flash controls graphic components easily. In further studies, network diagrams such as CPM (Critical Path Method) should be developed and applied to the app.

A study on the necessity and validity of NCS based neo-qualification plan qualification item in Occupational Safety and Health Management field (산업안전보건관리 분야의 NCS기반 신(新)자격 설계 자격종목의 필요성과 타당성에 관한 연구)

  • Choi, Seo-Yeon;Yang, Wook;Yoon, Young-Ju;Yi, Shin-jae
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.1-7
    • /
    • 2015
  • The study conducted questionnaire analysis to 413 industrial safety field employees in order to examine the necessity and validity of industrial safety field's 17th neo-job classification based on National Competency standards(NCS). As a result, 50.1% of industrial safety management field and 43.3% of industrial health management field answered that classification details of occupational safety and health management field are classified by job(duty) performance. Industrial safety management field recognizes that management and engineering section play a significant role in their work, while industrial health management field recognizes worker's health care and work environment management and overall control of work environment assessment to be significant in their work. Furthermore, industrial safety management field recognizes that separating qualification and foundation of 'construction safety manager', 'chemicals(safety and health) manager', '(toxic)risk assessment evaluator or risk factor manager' to be highly significant. The study is meaningful in that it suggests industrial safety field's qualification items practical in industrial sites.

Examining the effects of project manager's authentic leadership on field staffs' intention to leave and mediating roles of field staffs' perceived organizational support (건설현장 소장의 진성리더십이 현장직원의 이직의도에 미치는 영향 - 조직후원인식의 매개효과 -)

  • Youn, Inn-Han;Chang, Young-Chul
    • Management & Information Systems Review
    • /
    • v.34 no.2
    • /
    • pp.1-20
    • /
    • 2015
  • The purpose of this study is to examine the direct effect of project manager's authentic leadership on field staffs' intention to leave, and a mediating role of field staffs' perceived organizational support as a moderator. We collected data from 630 field staffs in the 75 different construction sites. The results of this study are as flows. First, the project manager's authentic leadership has positive impact on field staffs' perceived organizational support. Second, the project manager's authentic leadership has no significant impact on field staffs' intention to leave. Third, the field staffs' perceived organizational support has negative impact on field staffs' intention to leave. Finally, field staffs' perceived organizational support has perfectly mediated effects on the relationship between project manager's authentic leadership and field staffs' intention to leave. In conclusion, project manager's authentic leadership has significantly influenced field staffs' perceived organizational support, which also has significantly influenced field staffs' intention to leave. Especially, because of the rare studies on project manager's leadership this study has an important meaning.

  • PDF

A study on NCS based qualification plan development procedure of industrial safety field - Focused on the industrial safety, industrial health, nondestructive section- (산업안전 분야 NCS기반 자격설계 개발과정에 관한 연구 - 산업안전, 산업보건, 비파괴 분야를 중심으로 -)

  • Yi, Shin-jae;Yang, wook;Yoon, Young-Ju;Choi, Seo-Yeon
    • Journal of the Korea Safety Management & Science
    • /
    • v.17 no.3
    • /
    • pp.9-14
    • /
    • 2015
  • The study is conducted in order to establish validity of industrial safety field's neo-qualification composition by suggesting reengineering procedure of NCS based industrial safety field's qualifying occupational plan. Industrial safety fields are first classified into great classification which are environment energy safety, and then into sub-classification which are industrial safety management, industrial health management, and nondestructive test. NCS based neo-qualification plan is deveopled into progress as following steps; First, planning NCS neo-qualification system. Second, presenting work education combined program certification standard. Third, developing NCS based neo-qualification assessment standard. Fourth, developing work education qualification prototype problem. The process of qualification plan was composed with Worksheet 14 and with 4phase being completing summary of each section, certification and development of assessment standard, and development of prototype problem. As a result, Industrial safety manager was redesigned into Industrial sfety manager and Construction Safety Manager, and Occupational Health Care Manager was redesigned into Occupational Health Care Manager and Industrial Health Manager. This study, in conclusion, suggests development of qualifying occupation that could be applied to the integrated management system and development of future industrial safety field's specialized neo-qualifying occupation.